Objective FCM05

ESSIP Plan 2014 Octavian CIOARA DPS/PEPR 19.09.2014

Objective FCM05

• Comprehensive Explanation • What is new or has changed since LSSIP 2013 • Link to European ATM Master Plan • Finalisation Criteria and Closed Questions • ESSIP Report 2013 • Objective Coordinator’s Analysis, recommendations, tips & tricks • Links and contacts ESSIP Plan 2014 / Objective FCM05 2

Comprehensive Explanation

 Area of applicability:

All ECAC

 Initial Operational Capability (IOC): 09/2013 Full Operational Capability (FOC): 12/2016  The objective will ensure the improvement of B2B exchanges between local ASM tools and NM  Implementation will provide enhanced NOP capabilities (ADR, DDR2, Flight Plan filling...)  Most of the activities are part of the

Interim Deployment Programme

– IDP ESSIP Plan 2014 / Overview LSSIP 2013 3

What is new or has changed since LSSIP 2013

 Nothing.

ESSIP Plan 2014 / Overview LSSIP 2013 4

Link to European ATM Master Plan

Objective FCM05 covers the following SESAR OI steps:  OI Step – [AOM-0205] – Modular Temporary Airspace Structures and Reserved Areas  OI step - [DCB-0102] – Interactive Rolling NOP ESSIP Plan 2014 / Overview LSSIP 2013 5

Most important SLoA(s)

 FCM05-ASP01 – Upgrade the automated ASM support system with the capability of AIXM 5.1 B2B data exchange with NM  FCM05-ASP02 – Perform an integration of the automated ASM support systems with the Network  Each SLoA should be fulfilled in accordance with the relevant provisions of the NM B2B Reference Manuals ESSIP Plan 2014 / Overview LSSIP 2013 6

Finalisation Criteria and Closed Questions

Finalisation criteria:  Contact your subject matter expert to determine the deployment Status for each SloA Closed questions:  Closed Questions have been introduced for this Objective  Statements on Deployment Status should provide answers to Closed Questions ESSIP Plan 2014 / Overview LSSIP 2013 7

ESSIP Report 2013

 The submitted reports indicate that the objective will be implemented in time by the relevant stakeholders. However, as this is a new objective, there is still a high proportion of States having reported -No Plan-, therefore it is still premature to identify clear trends with regard the implementation progress.

ESSIP Plan 2014 / Overview LSSIP 2013 8

Objective Coordinator’s Analysis, recommendations, tips & tricks

 Ensure that your subject matter expert is involvement once you make your statement.

 Information provided per SLoA can be easily verified by checking the provisions laid down in the supporting material.

 Attention to the applicability to the Military stakeholders as airspace users.

 Objective also related to AOM19 ESSIP Plan 2014 / Overview LSSIP 2013 9

Links and contacts

Objective Coordinator: Octavian CIOARA +32 2 729 3282 [email protected] NMD Objective Expert: Nil AGACDIKEN +32 2 729 3073 [email protected]

ESSIP Plan 2014 / Overview LSSIP 2013 10