Transcript Slide 1

Objective FCM04
ESSIP Plan 2014
Octavian CIOARA
DPS/PEPR
19.09.2014
Objective FCM04
•
•
•
•
•
•
•
Comprehensive Explanation
What is new or has changed since LSSIP 2013
Link to European ATM Master Plan
Finalisation Criteria and Closed Questions
ESSIP Report 2013
Objective Coordinator’s Analysis, recommendations, tips & tricks
Links and contacts
ESSIP Plan 2014 / Objective FCM04
2
Comprehensive Explanation
 Area of applicability: France, Germany, Italy, Poland, Spain, Switzerland
 Applicable to: Paris, Bordeaux, Marseille, Brest, Karlsruhe, Roma, Warsaw,
Madrid, Barcelona, Geneva and Zurich FMP
 Initial Operational Capability (IOC): 09/2013
Full Operational Capability (FOC): 12/2015
 The objective will ensure the deployment of Short Term ATFCM Measures
– Phase 1 (as defined by the Interim Deployment Programme – IDP)
 As deployed in London, Raims and Maastricht FMP
 A more automated version of STAM (labeled STAM phase 2) will be
released in the next years by SESAR – Not within the scope of FCM04!
ESSIP Plan 2014 / Overview LSSIP 2013
3
What is new or has changed since LSSIP 2013
 Nothing.
ESSIP Plan 2014 / Overview LSSIP 2013
4
Link to European ATM Master Plan
Objective FCM04 covers the following SESAR OI steps:
 OI step - [DCB-0205] – Short Term ATFCM Measures
ESSIP Plan 2014 / Overview LSSIP 2013
5
Most important SLoA(s)
 FCM04-ASP01 – Availability of demand-capacity balancing tools via CHMI
(finalisation date 12/2015)
 FCM04-ASP02 – Provision of ANSPs sector and traffic occupancy
parameters data to NM (finalisation date 12/2015)
 FCM04-ASP03 – Implement FCM procedures to enable application of flow
management techniques on traffic streams closer to real-time and including
more accurate assessment of forecast sector loads and cooperative
management of groups of sectors and ATCO resources (finalisation date
12/2015)
ESSIP Plan 2014 / Overview LSSIP 2013
6
Finalisation Criteria and Closed Questions
Finalisation criteria:
 Contact your subject matter expert to determine the deployment Status for
each SloA
Closed questions:
 Closed Questions have been introduced for this Objective
 Statements on Deployment Status should provide answers
to Closed Questions
ESSIP Plan 2014 / Overview LSSIP 2013
7
ESSIP Report 2013
 The submitted reports indicate that the objective will be implemented in
time by the States within its area of applicability. However there is still a
need for the clarification of implementation intention of States which
have reported -No Plan- despite being in the applicability area of the
objective.
 It is also desirable to capture the plans for the States which are not
formally with the applicability area but which have expressed interest
for the implementation of STAM Phase 1 through other channels, in
order to have a better view of the progress.
ESSIP Plan 2014 / Overview LSSIP 2013
8
Objective Coordinator’s Analysis,
recommendations, tips & tricks
Ensure that your subject matter expert is involvement once you make your
statement.
Information provided per SLoA can be easily verified by checking the provisions
laid down in the supporting material.
Attention to the applicability to the Military stakeholders as airspace users.
ESSIP Plan 2014 / Overview LSSIP 2013
9
Links and contacts
Objective Coordinator: Octavian CIOARA +32 2 729 3282
[email protected]
NMD Objective Expert: Marcel RICHARD +32 2 729 9857
[email protected]
ESSIP Plan 2014 / Overview LSSIP 2013
10