Transcript Slide 1
Objective FCM04
ESSIP Plan 2014
Octavian CIOARA
DPS/PEPR
19.09.2014
Objective FCM04
•
•
•
•
•
•
•
Comprehensive Explanation
What is new or has changed since LSSIP 2013
Link to European ATM Master Plan
Finalisation Criteria and Closed Questions
ESSIP Report 2013
Objective Coordinator’s Analysis, recommendations, tips & tricks
Links and contacts
ESSIP Plan 2014 / Objective FCM04
2
Comprehensive Explanation
Area of applicability: France, Germany, Italy, Poland, Spain, Switzerland
Applicable to: Paris, Bordeaux, Marseille, Brest, Karlsruhe, Roma, Warsaw,
Madrid, Barcelona, Geneva and Zurich FMP
Initial Operational Capability (IOC): 09/2013
Full Operational Capability (FOC): 12/2015
The objective will ensure the deployment of Short Term ATFCM Measures
– Phase 1 (as defined by the Interim Deployment Programme – IDP)
As deployed in London, Raims and Maastricht FMP
A more automated version of STAM (labeled STAM phase 2) will be
released in the next years by SESAR – Not within the scope of FCM04!
ESSIP Plan 2014 / Overview LSSIP 2013
3
What is new or has changed since LSSIP 2013
Nothing.
ESSIP Plan 2014 / Overview LSSIP 2013
4
Link to European ATM Master Plan
Objective FCM04 covers the following SESAR OI steps:
OI step - [DCB-0205] – Short Term ATFCM Measures
ESSIP Plan 2014 / Overview LSSIP 2013
5
Most important SLoA(s)
FCM04-ASP01 – Availability of demand-capacity balancing tools via CHMI
(finalisation date 12/2015)
FCM04-ASP02 – Provision of ANSPs sector and traffic occupancy
parameters data to NM (finalisation date 12/2015)
FCM04-ASP03 – Implement FCM procedures to enable application of flow
management techniques on traffic streams closer to real-time and including
more accurate assessment of forecast sector loads and cooperative
management of groups of sectors and ATCO resources (finalisation date
12/2015)
ESSIP Plan 2014 / Overview LSSIP 2013
6
Finalisation Criteria and Closed Questions
Finalisation criteria:
Contact your subject matter expert to determine the deployment Status for
each SloA
Closed questions:
Closed Questions have been introduced for this Objective
Statements on Deployment Status should provide answers
to Closed Questions
ESSIP Plan 2014 / Overview LSSIP 2013
7
ESSIP Report 2013
The submitted reports indicate that the objective will be implemented in
time by the States within its area of applicability. However there is still a
need for the clarification of implementation intention of States which
have reported -No Plan- despite being in the applicability area of the
objective.
It is also desirable to capture the plans for the States which are not
formally with the applicability area but which have expressed interest
for the implementation of STAM Phase 1 through other channels, in
order to have a better view of the progress.
ESSIP Plan 2014 / Overview LSSIP 2013
8
Objective Coordinator’s Analysis,
recommendations, tips & tricks
Ensure that your subject matter expert is involvement once you make your
statement.
Information provided per SLoA can be easily verified by checking the provisions
laid down in the supporting material.
Attention to the applicability to the Military stakeholders as airspace users.
ESSIP Plan 2014 / Overview LSSIP 2013
9
Links and contacts
Objective Coordinator: Octavian CIOARA +32 2 729 3282
[email protected]
NMD Objective Expert: Marcel RICHARD +32 2 729 9857
[email protected]
ESSIP Plan 2014 / Overview LSSIP 2013
10