Transcript Slide 1

Objective COM10
ESSIP Plan 2014
Adriatik KOKONA
DSS/EIPR
19.09.2014
Objective COM10









Comprehensive Explanation
Link to European ATM Master Plan
Most important SLoA(s)
Finalisation Criteria and Closed Questions
Supporting Material
ESSIP Report 2013
Objective Coordinator’s Analysis, recommendations, tips & tricks
Conclusions
Links and contacts
ESSIP Plan 2014 / Objective COM10
2
Comprehensive Explanation


AFTN / CIDIN technology is now becoming obsolescent, and is not
sufficiently flexible to support future messaging requirements. It is
intended that existing AFTN and CIDIN users and systems will transition
to more modern technology, using the ATSMHS application, defined by
ICAO to replace the AFTN telegraphic style of working with a store-andforward Message Handling System based on international Standards and
providing enhanced functionality.
The ATS Message Handling System (AMHS) is a proven messaging
application based on the X.400 worldwide standards for messaging and
on the Internet Protocol (IP) for transmission and routing. In the EUR
ICAO Region it was decided to implement the AMHS on top of a TCP/IP
network infrastructure. The deployment of AMHS is an ongoing work,
which was started with the implementation of the "Basic Service" since
2006. An important development will be the introduction of the "Extended
Service" which is described in the ICAO documentation.
ESSIP Plan 2014 / Objective COM10
3
Link to European ATM Master Plan
 Enabler - [CTE-C10]-AMHS
ESSIP Plan 2014 / Objective COM10
4
Most important SLoA(s)
 COM10-ASP01 Implement AMHS capability (Basic ATSMHS) and
gateway facilities to AFTN;
 COM10-ASP03 Enhance AMHS capability (Extended ATSMHS)
ESSIP Plan 2014 / Objective COM10
5
Finalisation Criteria and Closed Questions
 AMHS capability for Basic ATSMHS has been implemented,
documented and in operational service (12/2011)
 Extended ATSMHS capability has been implemented, documented
and in operational service (12/2014)
ESSIP Plan 2014 / Objective COM10
6
Supporting Material
 EUROCONTROL Specification on the Air Traffic Services Message
Handling System (AMHS)" 0136, Edition number 2.0
"EUROCONTROL specification on the Air Traffic Services Message
Handling System (AMHS)" published as Community Specification in
the Official Journal of the European Union (ref. OJ C 323, 31.12.2009,
p. 24)
 ICAO ATS Messaging Management Manual (ICAO EUR Doc 021)
 ICAO EUR AMHS Manual (ICAO EUR Doc 020)
 ICAO detailed technical specifications (ICAO Doc 9880 Part IIB)
ESSIP Plan 2014 / Objective COM10
7
ESSIP Report 2013
 While the implementation of Basic ATSMHS is expected to be
finalized by all states by 12/2014, the enhancement of the AMHS
capabilities will most probably suffer delays because still Six ANSPs
have not yet planned the implementation while four ANSP are Late
in implementation ;
 23 States/ANSPs have implemented the basic ATSMHS, the
remaining are implementing it but two which have No Plans yet;
 5 States/ANSPs have implemented the Extended ATSMHS, while 3
have No Plans to implement it;
 Some states are suffering from lack of regional support, awaiting
their neighbours ACCs readiness to start planning implementation.
ESSIP Plan 2014 / Objective COM10
8
Objective Coordinator’s Analysis,
recommendations, tips & tricks
 Priority should be given to implement the required communication
infrastructure covered by COM09 Internet Protocol (IPv6);
 Start implementing Basic ATSMHS
ESSIP Plan 2014 / Objective COM10
9
Conclusions
 Importance of the IP based communication infrastructure
 Implement COM10-ASP01 and ASP03
ESSIP Plan 2014 / Objective COM10
10
Links and contacts
 Objective Coordinator:
Adriatik Kokona, +32 2 729 3556
[email protected]
 DNM Objective Expert(s):
Yuksel EYUBOGLU, +32 2 729 3379
[email protected]
ESSIP Plan 2014 / Objective COM10
11