Transcript Slide 1
Objective FCM05 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR 13.09.2013 Objective FCM05 • • • • • • • Comprehensive Explanation What is new or has changed since LSSIP 2012 Link to European ATM Master Plan Finalisation Criteria and Closed Questions ESSIP Report 2012 Objective Coordinator’s Analysis, recommendations, tips & tricks Links and contacts ESSIP Plan 2013 / Objective FCM05 2 Comprehensive Explanation Area of applicability: All ECAC Initial Operational Capability (IOC): 09/2013 Full Operational Capability (FOC): 12/2016 The objective will ensure the improvement of B2B exchanges between local ASM tools and NM Implementation will provide enhanced NOP capabilities (ADR, DDR2, Flight Plan filling...) Most of the activities are part of the Interim Deployment Programme – IDP ESSIP Plan 2013 / Overview LSSIP 2012 3 What is new or has changed since LSSIP 2012 Not the case. New objective. ESSIP Plan 2013 / Overview LSSIP 2012 4 Link to European ATM Master Plan Objective FCM05 covers the following SESAR OI steps: OI Step – [AOM-0205] – Modular Temporary Airspace Structures and Reserved Areas OI step - [DCB-0102] – Interactive Rolling NOP ESSIP Plan 2013 / Overview LSSIP 2012 5 Most important SLoA(s) FCM05-ASP01 – Upgrade the automated ASM support system with the capability of AIXM 5.1 B2B data exchange with NM FCM05-ASP02 – Perform an integration of the automated ASM support systems with the Network Each SLoA should be fulfilled in accordance with the relevant provisions of the NM B2B Reference Manuals ESSIP Plan 2013 / Overview LSSIP 2012 6 Finalisation Criteria and Closed Questions Finalisation criteria: Contact your subject matter expert to determine the deployment Status for each SloA Closed questions: Closed Questions have been introduced for this Objective Statements on Deployment Status should provide answers to Closed Questions ESSIP Plan 2013 / Overview LSSIP 2012 7 ESSIP Report 2012 Not the case. New objective. ESSIP Plan 2013 / Overview LSSIP 2012 8 Objective Coordinator’s Analysis, recommendations, tips & tricks Ensure that your subject matter expert is involvement once you make your statement. Information provided per SLoA can be easily verified by checking the provisions laid down in the supporting material. Attention to the applicability to the Military stakeholders as airspace users. Objective also related to AOM19 ESSIP Plan 2013 / Overview LSSIP 2012 9 Links and contacts Objective Coordinator: Octavian CIOARA +32 2 729 3282 [email protected] NMD Objective Expert: Nil AGACDIKEN +32 2 729 3073 [email protected] ESSIP Plan 2013 / Overview LSSIP 2012 10