Objective FCM05
ESSIP Plan 2013
Octavian CIOARA
DSS/EIPR
13.09.2013
Objective FCM05
•
•
•
•
•
•
•
Comprehensive Explanation
What is new or has changed since LSSIP 2012
Link to European ATM Master Plan
Finalisation Criteria and Closed Questions
ESSIP Report 2012
Objective Coordinator’s Analysis, recommendations, tips & tricks
Links and contacts
ESSIP Plan 2013 / Objective FCM05
2
Comprehensive Explanation
 Area of applicability: All ECAC
 Initial Operational Capability (IOC): 09/2013
Full Operational Capability (FOC): 12/2016
 The objective will ensure the improvement of B2B exchanges between local
ASM tools and NM
 Implementation will provide enhanced NOP capabilities (ADR, DDR2, Flight
Plan filling...)
 Most of the activities are part of the Interim Deployment Programme –
IDP
ESSIP Plan 2013 / Overview LSSIP 2012
3
What is new or has changed since LSSIP 2012
 Not the case. New objective.
ESSIP Plan 2013 / Overview LSSIP 2012
4
Link to European ATM Master Plan
Objective FCM05 covers the following SESAR OI steps:
 OI Step – [AOM-0205] – Modular Temporary Airspace Structures and
Reserved Areas
 OI step - [DCB-0102] – Interactive Rolling NOP
ESSIP Plan 2013 / Overview LSSIP 2012
5
Most important SLoA(s)
 FCM05-ASP01 – Upgrade the automated ASM support system with the
capability of AIXM 5.1 B2B data exchange with NM
 FCM05-ASP02 – Perform an integration of the automated ASM support
systems with the Network
 Each SLoA should be fulfilled in accordance with the relevant provisions of
the NM B2B Reference Manuals
ESSIP Plan 2013 / Overview LSSIP 2012
6
Finalisation Criteria and Closed Questions
Finalisation criteria:
 Contact your subject matter expert to determine the deployment Status for
each SloA
Closed questions:
 Closed Questions have been introduced for this Objective
 Statements on Deployment Status should provide answers
to Closed Questions
ESSIP Plan 2013 / Overview LSSIP 2012
7
ESSIP Report 2012
 Not the case. New objective.
ESSIP Plan 2013 / Overview LSSIP 2012
8
Objective Coordinator’s Analysis,
recommendations, tips & tricks
Ensure that your subject matter expert is involvement once you make your
statement.
Information provided per SLoA can be easily verified by checking the provisions
laid down in the supporting material.
Attention to the applicability to the Military stakeholders as airspace users.
Objective also related to AOM19
ESSIP Plan 2013 / Overview LSSIP 2012
9
Links and contacts
Objective Coordinator: Octavian CIOARA +32 2 729 3282
[email protected]
NMD Objective Expert: Nil AGACDIKEN +32 2 729 3073
[email protected]