Transcript CAA update
AIA Conference July 2010 Palmerston North Updating today Part 141 Mountain flying Syllabus reviews Threat and Error Management Latest FTSG Written exam validity New licence format 141 Final rule processing continuing New government, new expectations Emphasis on economic and substantive case Result – commenced review of proposed requirements and scope of potential application 141... Result of feedback from all parties...CAA Look to revalidate basis for requirements Ensure remain valid Offer effective and efficient safety outcomes Results communicated once known Mountain Flying 16 examiners to date Little evidence of instructor progress Instructor experience concerns Examiner seminar workshop FTSG review AC publication Stage II Part 61 141 priority NPRM final editing stages Syllabus reviews Pilot syllabus assistance page: active, consultation, pending and archive Law review complete Meteorology closes end of this month Balloon ATK & Aerostatics submissions closed end of June Threat & Error Management Introduction to syllabi Formalisation of common sense Linking human factors, TEM and airmanship Training and assessment of SA, DM & HF Structured and designed training to meet competency standards Demonstrate competence - FTSG Threats External events or errors Outside influence of pilot Increase operational complexity Require attention and management External e.g. Bad weather Internal e.g. Fatigue, complacency Errors Pilot/crew actions or inactions that Lead to deviation from expectations or intentions Reduce safety margins Increase probability of adverse events Classified as handling, procedural, or communication errors Undesired aircraft state Threats and errors not detected or managed correctly Deviation from flight path or aircraft configuration Reduces safety margins Countermeasures Planning: Flight planning, briefing, contingency planning Execution: e.g. Monitoring, cross or rechecking Workload and systems management Review: evaluating/modifying plans, inquiry and assertiveness to identify and address issues Effective 3rd July Details on website FTSGs being updated Pre flight, in flight, post flight considerations Training should stress groupings – I. Anticipated II. Unexpected III. Latent Assessment Identify the threat, error or undesired state Manage the threat, error, or undesired state Other matters FTSGs for Category D, E, CPL X/C flight test Understanding of examination validity New licence format Features and timetable Security – 3-D hologram overlay and ultra violet background graphic Credit card size – convenience, durability, acceptance LAME proving run/business systems Pilots and ATC anticipated later in year Issue and exchange LAME available Pilots and ATC not before date advised Existing licences remain valid Optional exchange $50 (CAA601) Sign rear upon receipt of licence Pilot example handout Minor editorial changes Compromise - maximise space/retain readability VIII & IX text more succinct “Issued on basis” now on front Some ratings grouped on one line Space for type ratings Questions