Clarification Meeting: Upgrade of infrastructure and Bulk Services at Kendal Power Station 12 April 2012 Evacuation Route: Presentation By: Ben Mabotja 2015/07/18 2 Agenda 1. Welcome : Lebo Modutoane 2. Evacuation Route: Ben Mabotja 3. Background of the Project/Technical: Lehana Khalema, Thabo Mncube and Boyiki Dube 3. SHE Ben Mabotja 2015/07/18 3 Agenda 1. Quality: George Ellis 2. ASGI-SA: Eunice Magagula 3. Commercial Lebo Modutoane 2015/07/18 4 Background of the Project/Technical: Presentation by: Lehana Khalema 2015/07/18 5 Technical The bidder must have the following: • CIDB:CE, Level 7 and above • NHBRC certificate. • Registered Address in South Africa. 2015/07/18 6 Scope of Work The description of the Works covered by this Contract includes: • Construction of a prefabricated laundry building; • Modification of existing prefabricated recreational building • Construction of new prefabricated recreation building; • Upgrading of existing bulk services (sewer, water, fire and electrical) to support the infrastructure upgrade; • Construction of storm water drains; 2015/07/18 7 Scope of Work (Continuation) • Rehabilitation of existing village road; • Construction of new village roads; • Construction of pavement of side of existing village road. • Construction of an electrical switch house; • Supply and installation of street lights along the new village roads; • Supply and install area lights; • Supply and install flood lights for the two soccer pitches; 2015/07/18 8 Scope of Work (Continuation) • Supply and install new electrical mini-sub to complement existing system; • Supply and erection ablution facilitates; • Rehabilitation of the two soccer fields (fence, gates, soccer posts) • Construction of carports and shades • Construction a mortar and brick Braai area; • Construction of a wash bay for buses and cars; • Supply, installation and connection of fire extinguishers and fire hose reels; and • Supply and installation of signage for all buildings. 2015/07/18 9 Technical • The Successful Bidder shall be responsible to upgrade bulk services in parallel with the construction of the prefabricated laundry building to ensure adequate supply of water and electricity from the most convenient village tie-in point to the laundry. • The Successful Bidder shall be responsible for electrical wiring, reticulation and to provide the necessary Certificates of Compliance. 2015/07/18 10 Thank you Safety, Health and Environment (SHE) Presentation by: Ben Mabotja 2015/07/18 12 Spot the Hazard! Safety is everyone responsibility 2015/07/18 13 SHE Requirements • Comply with the Occupational Health and Safety Act and Regulations (85 of 1993) • Comply with Construction Regulations 2003 • Constitution of the Republic of South Africa (No 108 of 1996), Section 24(a) “Environmental Rights • NB:SHE Specification can be accessed on Eskom website together with other enquiry documentations. 2015/07/18 14 SHE Requirements Contractor is required to Submit the following Documents: Health & Safety Plan (as per section 5 of the Construction Regulations) SHE Policy (signed by the Company’s CEO) List and proof of competencies (CV’s) of all legally appointed persons (SHE Reps, Supervisors) according to Construction Regulations Contact details of company’s Head office and contact person Nature of your work at Kendal Phase 2 Project (Scope) Company’s three year Safety Statistics record including no of employees. 2015/07/18 15 SHE Requirements Baseline Risk Assessment SHE Site Structure LETTER OF GOOD STANDING (COIDA) Safety Officer / Managers Appointee & CV Breakdown of SHE budget MSDS Sub-contractor’s details (if known) 2015/07/18 16 ED Cardinal Rules Rule Description of Rule Rule 1 Open, isolate, test, earth, bond, and/or insulate before touch Any person who performs work on an electrical installation shall ensure that it is isolated, tested and earthed before starting with any work. Rule 2 Hook up at heights Any person who performs work higher than two metres above ground level shall be attached to an anchor point at all times, or as identified during the risk assessment. Rule 3 Buckle up No person may drive any vehicle on Eskom business and/or on Eskom premises unless the driver and all passengers are wearing seat belts. Rule 4 Be sober No person is allowed to be under the influence of intoxicating liquor or drugs while on duty. Rule 5 Permit to work Where an authorization limitation exists, no person shall work without the required permit to work. 2015/07/18 17 Thank you Quality Presentation by: George Ellis 2015/07/18 19 Tender Quality Returnables Refer Eskom Standard 39-60 (Contract Quality Requirements) • Signed enquiry/contract/order quality requirements forms (Annexure A and B) • ISO 9001:2008 certificate or credible proof of an ISO 9001:2008 compliance Quality Management System, refer Section 7.2. • All contractors to adhere to the ED Quality Requirement Standard (3960) and submit a Provisional Quality Plan as per standard 39-60, refer Sections 7.2 and 7.4. • A CV of the contractor’s quality representative to be appointed for the works should be submitted for acceptance, including an organogram of the quality department’s reporting line and abridged CV’s of staff, refer Section 7.2. 2015/07/18 20 Tender Quality Returnables • Typical QCP/ITP (Quality Control Plan/Inspection & Test Plan) (example attached to 39-60) • Historical Information as required by section 7.2.7 of Standard 39-60 (Less than 2 years) • Management of vendors (Assessment, selection and management procedures/processes with examples of assessment/audit reports) and historical (Quality Management System, statistics and reports < 6 months) information as per standard 39-60 item, refer Section 7.2. 2015/07/18 21 Explaining Contractor QMS Requirements Before Contract Placement: • Annexure A (Refers to the sections of the Eskom Standard 39-60 applicable to this scope of work) • Annexure B (ISO 9001 Requirements applicable to the contractors generic Management System – Exclusions under clause 7 of ISO 9001 are permissible for the scope of work but must be justified in the Contract Quality Plan) • Access to the Vendor and suppliers for the purpose of initial assessment (i.e. Prior to Contract Award) of the management system can be expected. 2015/07/18 22 Thank you ASGI-SA Presentation by: • Eunice Magagula 2015/07/18 24 Supplier Development & Localisation (SD&L) SD&L Evaluation • SD&L evaluation criteria will have a weighting of 30% of the overall evaluation. Each element below will have a weighting assigned. The proposal of tenderers regarding the following will be evaluated and will each be accorded a weighting criterion: • The Bidder must have registered address in South Africa with a minimum B-BBEE Recognition Level of 4 and must also meet the criteria to be classified as LBS, BWO and/or SBE. This status must be maintained for the duration of the project. 2015/07/18 25 ASGI-SA Matrix TABLE 1: SUPPLIER DEVELOPMENT AND LOCALISATION COMPLIANCE MATRIX FOR SUPPLIERS AND CONTRACTORS Criteria Local Content to South Africa Weight (%) 30.00% Total Target (%) Proposed Target (%) Total Overall Weighted Score 100.00% 0.00% 0.00% Local Content Local to Site 15.00% 50.00% Procurement from LBS 0.00% 0.00% Procurement from BWO 15.00% 5.00% 0.00% Procurement from SBE 15.00% 5.00% 0.00% 25.00% Total Score 100.00% Total Supplier Development and Localisation Score 2015/07/18 25.00% 25.00% 26 ASGI-SA Matrix TABLE 2: SKILLS DEVELOPMENT COMPLIANCE MATRIX Skill Type (Occupation) OFO Occupational Group Civil Construction Technicians Technicians Weight (%) Proposed Target Number Number of Target Proposed of Persons to Persons to be Number of Number of be Trained Trained Persons to be Persons to be (Local to South (Local to Trained Trained Africa) South Africa) (Local to Site) (Local to Site) 100.00% Total Weighted Score 100.00% 4 0 Total 2015/07/18 100.00% 0 4 0 100.00% 27 Thank you Finance and Bill of Quantity Presentation by: Willem Venter (Quantity Surveyor) 2015/07/18 29 Thank you Upload of Documents http://mp2mas17.eskom.co.za/tenderbulletin/search.asp 2015/07/18 31 Commercial • Enquiry Number: SP(K)/2011/LM1/01/A • Scope of Work: Upgrade of Infrastructure and Bulk Services at Kendal Contractors Village • Closing Date: 03 May 2012 • Time: 10:00am at Megawatt Park Tender Office NB: No late submission will be accepted 2015/07/18 32 Commercial • Tender documents should be marked clearly, stating: Strictly Confidential, Group Capital Division Kusile Power Station Project SP(K)/2011/LM1/01/A • Bidders are required to use the 2 Envelope system and 1 CD when submitting tender documents. (1st Envelope: Commercial and Financial) 1 Original and 2 Copies (2nd Envelope: Technical and SHEQ) 1 Original and 2 Copies 2015/07/18 33 Tender Box Location Megawatt Park NO.1 Maxwell Drive Sunninghill Sandton 2157 Tender Box Opposite main Reception NB: No alternative tender box 2015/07/18 34 Acknowledgment Form Tender Document 1. Acknowledgement Form- 086 566 3350 2. Tender Returnable • Commercial • Financial • Technical • SHEQ 3. Conditions of Contract 4. Employer’s Scope 2015/07/18 35 Final Tender Document • Contract Data by Employer • Contract Data by Contractor • The Employer’s Offer • Scope Of Work • Conditions Of Contract 2015/07/18 36 Evaluation Process All tenders are evaluated and scored in accordance with Eskom’s Procurement Process Technical – 35% Price – 35% SD&L- 30% 2015/07/18 37 Tender Validity Period Tender Validity Period: 90 days Contract Duration: 12 months 2015/07/18 38 Communication During Tender Period • Contact Persons: Lebo Modutoane • Tel: +27 13 699 7130 • Email Address: [email protected] • NB: All clarification should be send via e-mail 2015/07/18 39 Thank you