PRE-QUALIFICATION TENDER FOR THE PROVISION OF ENVIRONMENTAL SERVICES 11 JULY 2014
Agenda
• Welcome • Safety • Technical • Quality • SHE • SD&L • Procurement 11 July 2014 2 Esther Seshabela TBA Kentridge Makhanya Sipho Sambo Diane Maunatlala Ishmael Modiko Esther Seshabela
Environmental Services Technical Criteria
Required Services
• Scoping - EIA • Basic Assessments • Environmental Compliance • Environmental Audits • Environmental Protection • Environmental Permits • Environmental Specialized Services
Our Business - Projects
Criteria
•
The appointment of service providers will be in the form of a panel and the panel structure will consist of four panels (A, B and C or Specialist) which are allocated to suppliers according to their capability.
Where do I fit in?
Key Performance Indicators Experience of the company/key resources Projects experience (Number of projects successfully completed by company) Capacity or Professional Registration Geographical footprint Panel A Panel B
15 + years 13-14 years 11-12 years 10 years 16 + Projects completed 14 -16 projects completed 12-14 projects completed 9-11 projects completed 5-8 projects completed 30 + employees 21-30 employees 14-20 employees 10-13 employees 6-9 employees 7+ provinces 6 provinces 5 provinces 4 provinces 3 provinces 14 Plus clients 9 years 8 years 6-7 years 5 years 12-14 projects* 9-11 projects* 5-8 projects* 2-5 projects* 1 project* 21-30 employees 14 -20 employees 10-13 employees 6-9 employees 2-5 employees 6 provinces 5 provinces 4 provinces 3 provinces 2 provinces
Client list (References)
9-11 clients 6-8 clients 5 clients 6-8 Clients 3-5 Clients 3 Clients 6-8 clients 3-5 clients 1-3 clients Project/s* mean completed projects
Panel C
5 years 4 years 2-3 years 1 year 11 + projects* 8-11 projects* 5-8 projects* 2-5 projects* 1-2 projects* 14 -20 employees 10-13 employees 6-9 employees 2-5 employees 1 employees 5 + provinces 4 provinces 3 provinces 2 provinces 1 province
Specialists
15-19 years 11-14 years 6-10 years 5 years 14 + projects* 12-13 projects* 9-11 projects* 5-8 projects* 3-5 projects* Natural Science 5 + provinces 4 provinces 3 provinces 2 provinces 1 province 9-11 clients 6-8 clients 3-5 clients 2020/04/30 7
Thresholds
•
Tenderers are expected to meet an overall technical threshold indicated for each panel in order to be pre-qualified and proposals that fail to achieve the minimum qualifying score will be disqualified. See table below for the technical weighting and minimum thresholds to be achieved for each panel.
Thank you
Procurement (Tender Process)
• • • • The tender procurement process will include the following major phases: •
Pre-qualification Stage (Technical)
Question and answers directed through a single communication channel Clarification responses in open forum – Eskom tender bulletin Submit on or before closing date & time at Tender Office •
Evaluation Stage
• Short listing of tenderers based on the Functional Analysis ( Technical) Proposals will be required to meet thresholds as per panel category
Shortlisting RFQ (Rates, SD&L & SHEQ) Evaluations Contract award
11 July 2014 10
Procurement
1. Deadline for Clarification questions - 30 July 2014
•
2. Deadline for tender submission 05 August 2014 @ 10H00 South Africa Standard Time
• •
3. Delivery of the tender submission Various tender boxes as indicated on the RFP (page 6-7) Suppliers must indicate the CORP Number of the tender box
• •
3. Tender Returnables All listed documents to be submitted by closing date Suppliers must indicate the panel category tendered for
•
4. Number of tender documents to be submitted The tender shall be submitted in 2 copies: (1) printed original, (1) copy of the original
11 July 2014 11
Thank you
Supplier Quality Requirements
Environmental Service
Date:
July 2014
Presenter:
Sipho A Sambo
QM 58 Supplier Contract Requirements” The purpose of the Eskom Quality specification is to define the requirements by which Contractors and Suppliers shall manage, implement, maintain and continually improve a Quality Management System (QMS) based on ISO 9001:2008.
The intention is that Contractors and Suppliers should continuously adhere to Eskom’s Quality requirements in respect of the supply of products and related services.
QM-58 Shall be implemented on all new contracts, and extensions to existing contracts.
QM-58.pdf
14
Process Flow of QM-58 Specification 15
Quality Evaluation Criteria and Documents for Submission
Clause No (QM-58) 3.2.1 a5
A.1
A.2
A.3
A.4
Section A (Option 1): QMS Requirements- ISO 9001 Certificate Evaluation Criteria/ Required Documents
Product / Service Scoping on ISO certificate is defined and relevant Certificate by Approved and Authorized certification authority Certification Authority is has Recognized International Accreditation Validity (expiry date) of certificate
Yes= 1 and No=0
1 1 1 1
Section A (Option 2): QMS Requirements- Objective evidence of a documented QMS that is not certified 3.2.1 a5
A.1
Quality Manual (including ISO 9001 mandatory procedures) 1 A.2
A.3
A.4
Copy of Quality Policy signed by top management.
Procedure for Control of Documents Procedure for Control of Records 1 1 1 2020/04/30 A.5
A.6
A.7
A.8
Internal Audits Procedure Procedures for Control of Nonconforming product or services Corrective Action Procedure 1 1 1 1
Quality Evaluation Criteria and Documents for Submission
Clause No (QM-58) 3.2.1 a4 3.2.1 a6 3.2.1 a13 3.2.1 a12 3.2.1 a9 3.2.1 a10 3.2.1 a10 3.2.1 a8 3.2.1 a7 Section B: Evidence of QMS in Operation Evaluation Criteria/ Required Documents
B.1
B.2
B.3
B.4
B.5
B.6
B.7
B.8
Copy of CV of Quality Representative for the project Signed Organisational structure & Quality dept. reporting structure.
Additional Quality Management Accreditations (i.e. NDT/NDE/RBI/Welding) Copy of procedure for control of suppliers & subcontractors Copy of Completed non-conformance report (NCR) Copy of Completed Corrective Action report (CA) Copy of Completed Preventative Action report (PA) Copy of Customer satisfaction surveys B.9
Copy of a Quality Plan (incl ITP's) on previous project < 2yrs B.10
Historical Information (list) of similar work performed < 2yrs
Yes= 1 and No=0
1 1 1 1 1 1 1 1 0 1 2020/04/30 17
Quality Evaluation Criteria and Documents for Submission
Section C: Contract Quality Plan as per Scope of Works (Ref ISO 10005) Clause No (QM-58) 3.2.2
3.2.1 a1 &a2 Evaluation Criteria/ Required Documents
C.1
C.2
C.3
C.4
C.6
C.8
C.9
C.11
C.14
C.16
E.1
Supplier identified the persons responsible for drafting the PS Scope of PS is complete, as description in the Works Information.
Allow for acceptance of PS by Employer (meeting Quality objectives) Preliminary Management authority & responsibility Matrix submitted Control of Quality Records- process to complete, keep & dispose Allow for Customer Requirement reviews / specifications adjustments Setup communication channel on quality issues Purchasing- Submit a list of all suppliers and subcontractors.
Describe Procedures in dealing with Customer property Supply draft Concession request for Non-conforming products
Section D: ITP Section E: Quality Requirements for ISO series and QM 58
Complete and sign Form A and B 2020/04/30 18
Yes= 1 and No=0
1 1 1
N/A
1 1 1 1 1 1 1 1
Documents for Submission 5) 6) 7)
The supplier shall submit the following quality documentation with the tender:
1) 2) Signed form A Signed form B 3) 4) Detailed CV of the supplier Quality Management Representative.
Copy of ISO 9001:2008 certification
OR
objective evidence of a QMS that complies with ISO 9001:2008
(QM Manual and six mandatory procedures).
Copy of contractors organisational structure indicating QMR position.
Historical information register on similar work carried out.
Draft CQP that fully complies with ISO 10005 standard, and Eskom template
(QM 58 Appendix C)
2020/04/30 19
Quality Evaluation Criteria and Documents for Submission 8)
Closed out and completed product / process Non conformance report.
9)
Completed and closed out internal audit Corrective Action Report.
10)
Completed and closed out Preventive Action Report.
11)
A copy of procedure for control of suppliers.
20
Summary of Procurement Quality Assurance Process 1) Supplier submits Quality documentation with a tender.
2) Suppliers Quality documentation submitted with tender complies with
QM-58
requirements
.
3) CQP is implemented by Supplier and monitored by Eskom for the duration of the contract.
21
Eskom reserves the rights to
Perform supplier technical and quality capability assessments on all potential suppliers in order to determine all quality and technical risks associated with a specific contract, process, commodity, project or service.
Perform audits on all suppliers, contractors and subcontractors who have been awarded a contract. These post contract audits shall be carried out, in accordance with Eskom's supplier, contractor audit schedule
23
SHE Requirements Environmental Service
Presented by : MD Maunatlala SS: COHS
Eskom’s Core Values: ZERO HARM
Excellence Innovation Eskom Values Customer Satisfaction Acknowledged by all for exceptional standards, performance and professionalism.
Value-adding creativity and results oriented. Lead through excellence in innovation.
A commitment to meet and strive to exceed the needs of the receivers of products and services.
Integrity Honesty of purpose, conduct and discipline in actions, and respect for people.
Zero Harm Eskom will strive to ensure that zero harm befalls its employees, contractors, the public and the natural environment.
Applicability : All Eskom Employees, Agents, Consultants, Suppliers, Contractors & Visitors .
24 2020/04/30
Contractor SHE Returnables
Contractor Risk Category:
Low Risk (Objective criteria) Non- negotiable minimum requirements that tenders have to address and respond to when submitting tender returnable for evaluation are
• A baseline Risk Assessment • Acknowledgement of Eskom’s rules and requirements • Health and Safety Plan • Valid Letter of Good Standing • SHE Policy 25
Baseline Risk Assessment
• The purpose of conducting a baseline HIRA is to establish a risk profile or a set of risk profiles. It is used to prioritise action programmes for issue-based risk assessments.
The output of a baseline risk assessment
risk profiles; and is a risk profile or set of • it is a clear description of the methodology, system, terminology etc. used in the scoping exercise, and what may be required for the improvement of the baseline HIRA in the future.
26
Eskom Rules and Requirements
This is the acknowledgement form issued to the tenderer for his or her own acknowledgement of a clear understanding of all the SHE requirements at Eskom. Signing the form that is Annexure B will be deemed as your acceptance to conform to the following documentation and application of such within your scope of work.
The following Policies/Procedures are in support of Eskom SHE requirements: • • • • • Eskom SHEQ Policy 32-727 Eskom Cardinal Rules 32-421 Eskom Substance Abuse Policy 32-37 Eskom Vehicle & Driver Procedure 32-93 Incident Management Procedure 32-95
These are not tender returnables the are only there for guidance and reference purposes
27
SHE Plan and Details
A detailed SHE plan which must address but not limited to the following :
- Implementation of a SHE system, how it will be monitored and controlled - Training and competency for employees - Access and monitoring and control of visitors - Fire and Emergency preparedness - SHE risk management How the culture of Zero harm will be entrenched into the company’s operations - The induction programme for all employees and visitors - Incident management - Personal protective equipment and safeguarding of employees - Safety initiatives, SHE awareness and communication - Housekeeping, - Medical certificates - Vehicle and Driver safety 28
Valid letter of Good Standing
It is essential to ensure that all suppliers that perform work on Eskom premises be registered with the Compensation Fund in terms of the Compensation for Occupational Injuries and Diseases Act (COID Act). In order to ensure the above mentioned the supplier needs to produce a letter of good standing with the Compensation Commissioner.
Based on Legislation in section 89, of the Compensation for Occupational Injuries and Diseases Act In order to ensure the above mentioned the supplier needs to produce a letter of good standing with the Compensation Commissioner.
29
SHE Policy
• The Occupational Health and Safety Act, Act 85 of 1993, requires the employer to provide and maintain as far as reasonable and practical a work environment that is safe and without risk to the health of employees.
• Section 7 of the Act provides direction to employers concerning the health and safety policy of the organisation. • A health and safety policy is a written statement of principles and goals embodying the company's commitment to workplace health and safety signed by the CEO. There are no hard and fast rules about what to include in a policy. The employer should create a policy that is suitable and sufficient in order to address the health and safety need of the company.
30
31