AIM Management Organization

Download Report

Transcript AIM Management Organization

FRB NAVEDTRA 136 Business Process Refinement

Roy Hoyt, NETC N74 John Wishall, NETC N72 Tiffany Dombrowski, AIM Pgm Mgr, NAWCTSD 19 September 2012

• • • • • • • • • •

Overview

JDTA FEA BCA TPP process updates Versioning Master Course Schedule Authoritative RRL data inputs from eTEM Metadata changes Blended learning/content modularization Assessment policies and processes

Backup Slides

• • • •

JDTA

Interfaces with other JTA inputs CTTL – import task complete and delivered to NAWCTSD

SPAWAR TACD – initial prototype based on CTTL import

Littoral Combat Ship (LCS) – ongoing discussions

Aviation maintenance Master Task List (MTL) – pending Issue of Needing to Un-approve JDTA Items to Make Corrections Add capability for bulk Submit and bulk Accept of JDTA items as well as omitting Accept step for small Centers (ACR 245) – tasked, funded and scheduled for delivery Dec 2012 Versioning JDTA – task, funded, and scheduled for delivery Sep 2013

JDTA Links to other JTA

SPAWAR TACD JTA

Entry for manual JDTA development

Pre-JDTA Work Area CPM JDTA Tab CPM Project Tab AIM II CTTL

- user selection for mapping imported JTA to preliminary JDTA - user action to complete JDTA and submit for approval - user action to design/dvlp learning content based on approved JDTA

Other JTA

(e.g., LCS data collection application, Master Task List)

• •

FEA

FEA implementation in CPM tasked and funded – scheduled for delivery Feb 2014 Prototype demonstration planned for Thurs am 20 Sep session

BCA

Ongoing discussions

TPP Process Updates

Preliminary Design Document in work under TO 0011

• •

Versioning

Adapting traditional AIM I/II revision and change model for NAVEDTRA 136/137 environment Version of both CPM and LO Module content tasked and funded – delivery scheduled for Sep 13

Master Course Schedule

• •

Re-engineering of AIM I/II CMS functionality per requirements defined by Angel Strong’s working group chartered at Aug FRB meeting completed and delivered to NAWCTSD RIS in place for CeTARS update to support NAVEDTRA 136-style CMS – status?

RRL Data Inputs from CeTARS eTEM

Curriculum Development (AIM) Training & Student Management (CeTARS) Classroom Management (CIN/CDP) AIM I/II Student Mgmt and Schedule - PPP/TPS (AIM I) - CTTL (AIM II) - LP/TG/test items - RRL - TPP/TCCD ERL Training Asset Management CPM ATEM (current) eTEM (in dvlp) - JDTA - learning objectives - curr. outline of instr.

- TPP/TCCD - RRL ERL

Legend Existing ATEM and eTEM flat file interface Planned eTEM flat file interface Proposed eTEM Web service interface

• •

Metadata Changes

New NETC metadata guidelines promulgated in NETC Note 1500 dated 29 Feb 12 AIM team tasked and funded to incorporate updates under TO 0011 – planned for delivery Sep 13

• • •

Blended Learning/Content Modularization

Continued progress in demonstrating NAVEDTRA 136/137 business rules in CPM/LO Module via MT Continuum project Operational CBT tool interfaces from LO Module to LSI Venus.net and GD-IT Webtrain Ongoing task by AIM team working closely with BAH to implement similar LO Module interface with Atlas Pro ROCCE toolset – LO Module output complete and delivered to NAWCTSD

• • • •

Assessment Policies and Processes

AIM I/II/LO Module modifications complete to output test items developed and maintained in AIM to Atlas Pro Assessment Engine Related modifications to Assessment Engine not yet tasked and funded Earlier prototype work on outputting test items to QM Perception AIM II fully supports test item output to CeTARS

Questions?