NETC N7 Status
Update to AIM FRB
4 May 2010
Overview
• NAVEDTRA 130B, 131B, 135C, 132
• NAVEDTRA 136 (ILE) re-write status & effect on AIM/CPM
• AIM/CPM status support of JDTA w/ participating Center updates
• AIM/CPM status support of OCCSTD capture/validation
• NETC/OPNAV N15 integration of NETC domain/acquisition
community business processes
• AIM/CPM integration status w/ Perception
• FEA/BCA capability plans for CPM
• PPP Repository status
NAVEDTRA 130B, 131B, 135C, 132 Status
•
•
•
•
130B
131B
135C
132
NAVEDTRA 136 (ILE) Re-write
• Current re-write status
‒
Leslie Lucas (team lead) distributed continuity draft of
Plan through Design phases for working group review
on 30 Apr
• AIM/CPM impact
–
–
–
–
JDTA Tab - Rename “Skills Hierarchy” Report “Job
Duty Task Analysis” Report
Project Tab - Rename “Performance Requirements”
branch of Projects to “CTTL”
Project Tab – Rename “COI with ISD Considerations”
report to IMDP
Projects Tab- Rename “ISD Considerations” link on
C/M/L/S to “IMDP/Learning Strategy Elements”
AIM/CPM Support of JDTA and
Participating Center Updates
• CPM Rel 4.0 operational 27 Jan 10
• JDTA NETCINST 1510.4 promulgated 24
Feb 10
• Center projects:
– CPPD/CSFE: Curriculum Developer with
integrated AIM user training
– CSFE
– SLC
– CEODD
– CID
AIM/CPM Support of OCCSTD
Capture/Validation
• NETC N74 coordination with NAVMAC
• CPM JDTA tab being adapted for
OCCSTDS specific requirements
‒ Capability to be part of CPM Rel 5.0
• AIM team working with NAVMAC and
NETPDTC on OCCSTDS data interface
with Perception LAS for fleet validation of
preliminary OCCSTDS
Integration of NETC Domain/Acquisition
Community Business Processes
• Roy Hoyt & Roger Thorstad to provide
status
AIM Interface with Perception LAS
• Support for NETC N51 assessment
program and NAVMAC OCCSTDS fleet
validation process
• Planning for implementation via
Perception API
• Participants:
– NAVMAC and NETC N51 as SMEs
– NETPDTC as Navy technical agent for
Perception
– AIM team on Web service data output from
AIM I, AIM II, and LO Module
FEA/BCA Capability Plans for CPM
• FEA – NETCINST 1500.6
• BCA – NETCINST 1510.3
• Business processes still being defined
and integrated into NAVEDTRA 136
• AIM team involved in business process
definition and initial design of CPM
support for FEA/BCA downstream
PPP Repository Status
• AIM team coordinating with NETC N74
(Leslie Desenburg) on options to post
PPP repository contents (AIM and other)
for easy viewing