AIM Management Organization

Download Report

Transcript AIM Management Organization

NETC N7 Status
Update to AIM FRB
Roy Hoyt, NETC N74
Jake Aplanalp, AIM Pgm Mgr
23 Aug 11
Overview
• NAVEDTRA 130B, 131B, 132, 134, 135C, 136, 137
• NAVEDTRA drafts – 133, 138, 139
• Central Site implementation
• AIM/CPM status support of JDTA w/ participating Center
updates
• AIM/CPM status support of OCCSTD capture/validation
• AIM/CPM integration status w/ Learning Assessment
Systems
• FEA/BCA capability plans for CPM
• NETC/OPNAV N15 integration of NETC domain/acquisition
community business processes
Promulgated NAVEDTRAs
•
•
•
•
•
•
•
130B (task-based learning content)
131B (PPP-based learning content)
132 (Assessment)
134 (Navy instructor manual)
135C (Schoolhouse Mgmt)
136 (ILE learning content)
137 (JDTA)
NAVEDTRA Drafts
• 133 (HPRR)
• 138 (course/content modularization)
• 139 (FEA)
NAVEDTRA 136 & 137 Impacts on
CPM / LO Module Rel 5.0
• Re-evaluated and prioritized existing functional
requirements based on 136/137 policies
• Re-write has created a need for additional
functionality to meet
– Design Strategy (IMDP)
– Significant copy and link capability in JDTA and Project
tabs and in LO Module
NAVEDTRA 136 (ILE) Implementation
• Current status
‒ Promulgated by NETC in Nov 10
‒ 136A in work to address user community
feedback and extend/refine ILE learning
content business rules
• Transition from NAVEDTRA 130/131 (AIM II/AIM I)
to NAVEDTRA 136 (CPM/LO Module)
‒ Policy / trigger
‒ Pace of migration
‒ Continuing support for AIM I/II through ????
AIM Central Site Implementation
•
•
•
Management points of contact:
‒
NETC N74: Leslie Desenburg
‒
NETPDTC: Peg David
Center-by-Center implementation schedule:
‒
Initially established by Leslie Desenburg
‒
under review based on NETPDTC move to eDMZ
application hosting in early 2012 and related
workload for user account re-initialization
Peg David to brief in more detail
CPM Hosting at NETPDTC
•
•
NETC N74, N6, NETPDTC, and AIM team in process of
migrating the production version of CPM to NETPDTC by
1 Oct 11
‒
Full IA Certification and Accreditation process underway by
NETPDTC/AIM team
‒
CPM Rel 5.0 GAT on new NETPDTC server in early Sep
Benefits Include:
‒
Enterprise hosting and support vs. current R&D environment
in Orlando
‒
Co-located with rest of NETC enterprise IT applications and offsite COOP support
OCCSTDS Support in CPM
•
•
How did we get here?:
–
Started with NETC N74/NAVMAC discussions
–
AIM Team provided a CPM “sandbox” for NAVMAC familiarization
–
NAVMAC developed an OCCSTDS Storybook PPT to describe highlevel functionality
–
Initial OCCSTDS tab implementation in Rel 5.0 for
creation/management of OCCSTDS data by NAVMAC – crawl
functionality
Working toward business rule definition of:
–
How OCCSTDS data pulls forward into JDTA tab
–
Life-cycle impacts of OCCSTDS revisions on JDTA-based learning
content
Trigger Initiating Process
Naval Education and Training Command
Course Development & Revision Process
Date: 12Jul2011_V1/rh/jtw
External Training
Requirement Sources:
Trigger Initiating Process
Training Requirement
Identification & Resource
Sponsor Commitment
NETCINST 1500.9
3 December 2010
NTSP Revision
OPNAV N1 Training
Requirement Sources:
Operational Risk
Management (ORM)
Assessment
Revision to an Enlisted
Occupational Standard
Requirement Sponsor
Provides Formal
Correspondence
Identifying
Training
Requirement
Fleet
Performance
Assessment
Resource Sponsor /
Training Support Agent
Commits
to Resource
Training
Requirement
Rating Merger
Direct Fleet
Input
Establishment or
Revision of a NEC
Human Performance
Requirements Review
(HPRR)
End
Process
NAVEDTRA 133
Human Performance
Requirements Review
Management Manual
June 2011
Perform
Job Duty
Task Analysis
(JDTA)
Perform
Front End
Analysis
(FEA)
Perform Content
Quality Review for
Content Re-Use
or Re-Purpose
Develop
Business Case
Analysis
(BCA)
Job Duty Task Analysis
(JDTA) User Guide
NETCINST 1510.4
24 February 2010
Front End Analysis
(FEA) User Guide
NETCINST 1500.6
9 March 2010
NAWCTSD Orlando, FL
Quality Evaluation Tool
Technical Report 2005-002
June 2005
Business Case Analysis
(BCA) Policy
NETCINST 1510.3
20 October 2009
Develop
Training
Project Plan
(TPP)
Develop
New Course
or Revise
Existing Course
and Pilot
Deliver
Course of
Instruction
Course Development / Revision End - to - End Process
NETC Course Development / Revision End - to - End Process
Course Development
&
Revision Process Color Key:
External
External Training
Training
Requirement
Requirement Sources
Sources
Requirement Sponsor &
Resource Sponsor Actions
OPNAV
OPNAVN1
N1Training
Training
OPNAV
N1 Training
Requirement
Sources
Requirement
Sources
Requirement Sources
Course
Development
and
NETC
Course
Development
Revision
Process
and
Revision
Process
NAVEDTRA 130B
Task Based Curriculum
Development Manual
August 2009
NAVEDTRA 135C
Navy School
Management Manual
March 2010
NAVEDTRA 131B
PPP Based Curriculum
Development Manual
November 2010
NAVEDTRA 134A
Navy Instructor Manual
August 2009
NAVEDTRA 136
ILE Course
Development & Life-Cycle
Maintenance Manual
November 2010
NAVEDTRA 132
Navy School
Testing Program
Management Manual
March 2011
AIM/CPM Support of JDTA and
Participating Center Updates
•
CPM Rel 4.1 operational Jan 11 / Rel 5.0 delivered Jul
11 – operational at NETPDTC by 1 Oct 11
•
JDTA NETCINST 1510.4 promulgated 24 Feb 10 /
NAVEDTRA 137 forthcoming
•
Center projects:
–
CPPD/CSFE: Curriculum Developer
–
SLC/CSCS: IT Rating
–
CID: Information Professional
–
NETC N72/Carley: ‘A’ School re-engineering
–
PMS 420/NAWCTSD: LCS mission pkg JDTA
AIM/CPM Support of OCCSTD
Capture/Validation
NETC N74 coordination with NAVMAC
• CPM OCCSTDS tab added in CPM Rel 5.0
• AIM team working with NAVMAC and
NETPDTC on OCCSTDS data interface with
NETC enterprise LAS for fleet validation of
preliminary OCCSTDS
• Business rules for use of OCCSTDS data in
CPM as basis for JDTA in development
•
AIM Interface with NETC LAS
•
Support for NETC N51 assessment program as well
as NAVMAC OCCSTDS validation
•
Working with NETC N5/N6/N7, NAVMAC, and
PMW-240 for implementation via Atlas Pro
Assessment Engine and Survey Engine
•
Participants:
–
NAVMAC and NETC N51 as SMEs
–
NETPDTC/PMW-240 as Navy technical agent for Atlas
Pro suite implementation and support
–
AIM team on Web service data output from CPM, AIM
I, AIM II, and LO Module
FEA/BCA Capability Plans for CPM
•
•
•
•
FEA – NETCINST 1500.6 (NAVEDTRA 139 draft)
BCA – NETCINST 1510.3
Business processes integrated into NAVEDTRA
136
AIM team supporting business process
definition
‒
Design prototype of CPM support for FEA/BCA in
final development for NETC / community review
Integration of NETC Domain/Acquisition
Community Business Processes
• SPAWAR and NAVSSES Philadelphia working
JDTA projects in CPM
• NETC N74 working with aviation community
(Kelee Plagis of CNAF) on ‘harmonizing’
NAVEDTRA 136-137-138-139 business
process with that in Naval Aviation Training
System (NATS) Handbook for NETC domain
and acquisition community standardization
Questions?
Backup Slides
AIM Interface with NETC LAS
Existing
Interface
Content Planning Module (CPM)
Job Duty Task
Analysis (JDTA) data
OCCSTDS data
Proposed
Interface
Learning Objectives/
COI data
AIM
Proposed
Capability
Fleet validated OCCSTDS data
Initial
OCCSTDS data
for fleet
validation
Analysis/Validation
of Fleet Data
OCCSTDS survey results
Survey
Engine
(SE)
Learning
objectives,
content
outline, JDTA
Links
Self-paced
authoring
tool
AIM I/AIM II
Content structure data for Level 3 surveys
(Traditional LP/
TG Content)
1. Standard OCCSTD
Fleet Survey
2. Level 3 Survey
Assessment
Engine
(AE)
1. All ILT and selfpaced in-course testing
2. LoK exams
Test data for in-course exams
[test items plus test design
data?]
Test data for Level of Knowledge exams
Learning
Object [LO]
Module
(ILE ILT content
objects)
Test data for in-course exams
[test items plus test design data?]
LAS
Applications
JDTA
Links
Note: existing
capability to
export AIM I/II
test items to
CeTARS testing via
standard Excel
model
Prelim
Learning
Content
Design
Data /
Metadata
ROCCE
(ILE self-paced
content objects)
Final
Learning
Content
Data /
Metadata
Note: existing
capability to
exchange data
with LSI
Venus.net and
GD/IT
Webtrain CBT
authoring
tools
28 Jul 11
PPP Repository Status
AIM team supporting NETC N74 (Leslie
Desenburg) in operation of the PPP
repository hosted on fedsun at
NAWCTSD
• Hosting will shift to NETPDTC with
integration into CPM Rel 5.0
•
SLC e-Library Project Overview
•
•
Goal: Provide site access to electronic library
‒
Validated mission, functions, tasks of Librarians
‒
Developed business rules for access, inventory control , and
user requests
‒
Identified publications available electronically to support
CINs
‒
Defined functional requirements for e-library layout
‒
Planned for hosting and deployment
Project lead: Beth Wigfield (SLC N6)