Tracking Analysis for beam test T585 CONTENTS ● ● ● ● SETUP MAPPING/ FIBER ALIGNMENT DEAD CHANNEL ANALYSIS – 2D TRACKING ● – P.E. DISTRIBUTION 3D TRACKING ● ● P.E.
Download ReportTranscript Tracking Analysis for beam test T585 CONTENTS ● ● ● ● SETUP MAPPING/ FIBER ALIGNMENT DEAD CHANNEL ANALYSIS – 2D TRACKING ● – P.E. DISTRIBUTION 3D TRACKING ● ● P.E.
Tracking Analysis for beam test T585
CONTENTS ● ● ● ● SETUP MAPPING/ FIBER ALIGNMENT DEAD CHANNEL ANALYSIS – – 2D TRACKING ● P.E. DISTRIBUTION 3D TRACKING ● ● P.E. DISTRIBUTION RECONSTRUCTED EVENT
SETUP
BEAM TOFs
#4 47.5 cm #3 #2 32.5 cm #1 7.3 cm -47.5 cm
VLPC channels
● 512 channel per AFE board -> 2048 ch in total
AFE board # 104 # 107
LH Cassette
# 106 # 105
RH Cassette
GAIN CALIBRATION
● Gain is estimated by gaussian fitting
AFE board #106 MCM #1 Channel #1
DEAD CHANNEL
● ●
VLPC dead (estimated by LED run)
– –
AFE board# 104: ? channels # 107: 3 channels
–
# 106: 4 channels
–
# 105: 4 channels “Fiber dead” (estimated by normal run)
–
NOT YET STUDIED....
SIGNAL of SCIFI
Raw signal converted into photo electron after subtracting common mode RUN# 1255 B=0T , Rotation=0deg, w/o diffuser
ANALYSIS
● ● 2D Tracking – – Fiber Alignment P.E. Distribution 3D Tracking – Reconstructed Event
2D TRACKING W VIEW V VIEW
Y
● ● HIT – Fibers over 2.5 p.e.
FITTING – – – – Minimum chi-square fit X view : y position Yx
Yx Xuv Xuw
V view : x position Xuv crossed with X view W view: x position Xuw crossed with W view
X VIEW
X BEAM
#1 #2 #3 #4
MAPPING/ FIBER ALIGNMENT
After correction.....
Fiber # (station 2) Fiber # (station 1)
MAPPING/ FIBER ALIGNMENT
Fiber # (station 2) Fiber # (station 1)
OFFSET
Fiber # (station 1)
TWIST
CROSSING HIT POSITION W VIEW V VIEW
X position Xv
Yx Xv Xw
X VIEW
X position Xw
3D TRACKING
● ● HIT – Fibers of maximum light yield FITTING – Circular fitting #2 #3 #4
BEAM
RECONSTRUCTED EVENT
RUN# 1320 B=1T , Rotation=6deg., w/o diffuser
p
by TOF