Overview
Objectives Schedule/Progress Design Concept Summary Construction • Wing • • • Fuselage Tail Landing Gear Goals 2
Objectives
The plane meets the specifications of the 2004 SAE Aero Design West competition To complete construction by mid April to allow time for testing and modifications To compete well at competition and improve Stevens reputation For the team to improve and expand their knowledge of the design and construction of airplanes 3
Schedule
4
Journal/Progress
Construction • Wing • • Tail In progress: • Landing gear • • Fuselage Boom 5
Wing Ribs
Selig 1223 Print and cut original Metal cut out template Final for placement in wing 6
Wing Construction
Leading edge 3/8 in dowel Tailing edge triangle Middle spars 3/8 in pine Ribs balsa 7
Wing
Full wing laid out 10 ft wing span 1 ft cord Flap 3 ft 8
Approximate Size
Stephen 6 ft Jess 5ft 1 In Wing span 10 ft Plane 8 ft 9
Fuselage
Shortened to 2’-1” long Made from plywood and balsa wood Attached to boom externally Old design New design 10
Fuselage Pictures
Top forward view Side view Top down view 11
Horizontal Tail Construction
First Construction • Rectangular and circular bars • • • Very light weighted Very low drag Problem with v. tail and boom attachment 12
Horizontal Tail Construction
Second Construction: • NACA 0012 • 36 inches x 7.5 inches • • Rib design Servo, boom, and v. tail attachment 13
Vertical Tail Construction
Final Design: • Dimensions • Height -13.4 in • • Width top - 5 in Width bottom -11.5 in • • Balsa bars Minimum drag 14
Attachments
Tail Assembly: • Glue in joints • Balsa box • Underside • • Attachment for booms Servos • Covered with monocote 15
Approximate Size with Fuselage
16
A Day In The Lab
Chi and Jess working • Rich and Yoosuk working 17
Problems
Design changes due to: • Material • Not perfect • Cost • Equipment • Improvised with equipment available • Time Construction vs. Drawings 18
Goals
Complete construction Coating the plane Test engine Test landing gear configuration Test plane • Modify if necessary Compete in June 19
Summary
Objectives Schedule/Progress Design Concept Summary Construction • Wing • • • Fuselage Tail Landing Gear Goals 20