Transcript Slide 1

16.225Km
3.4Km
11150
LINK
c/sCANAL
TGP
MAIN
POONDI
RESERVOIR
157.929K
m
1000 c/s
25.275Km
Capacity: 2.75 TMC
45.172Km
LINING &
DISTRIBUTARIES
CANAL
SR Capacity
2.133
1
108.26 KM
TMC
Nippulavagu
SRBC
(5000
c/s)
5000 C/s
141.72 KM
7.83Km
Link canal
SRI POTULURI
VEERA
BRAHENDRA
SWAMY
BALANCING
RESERVOIR
Capacity: 17.735
FRL 730’
Ayacut: 1.5L Acs
Capacity
2.444
SR
TMC
2
PENNA RIVER
SRMC
VELIGODU BALANCING
RESERVOIR
FRL +868.50’
Cap: 16.95TMC
Ayacut : 1.25L Acs
Sill: +841’
Kurnool-Cuddapah
District Boarder
KRISHNA RIVER
FRL: +885’
MDDL : 834’
BANAKACHERLA REGULATOR
DAM
Pothireddypodu Head Regulator
Sill : +841 (4 existing + 3 Addl)
SRISAILAM
APPROACH CHANNEL
COMPLETED
AP – TN Boarder
CC LINING
KANDALERU
RESERVOIR
Cap: 68.03TMC
FRL : +279’
Ayacut: 3.00L Acrs
SOMASILA PROJECT
Cap: 78TMC
FRL: +330’
Ayacut: 4.14 Lakh Acres
TELUGU GANGA PROJECT (2 years period)
LINING
CHINNA
MUKKAPALLI
REGULATOR
1.
Total length of the TGP Canal- 408 KM (from Pothireddypadu head regulator to AP Border
2.
Excavation of Main canal formation 4 balancing reservoirs (Velugodu Balancing Reservoir, SPV Balancing
Reservoir, Somasila & Kandaleru Balancing Reservoir) and CM & CD works completed
3.
Lining of Balance Main Canal (114.309 KM completed), balance distributory system and branch canal etc covered
in 9 packages will be completed in 2 years period.
4.
Total ayacut proposed 5.75 Lakh acres
5.
Ayacut created : 1,00,000 Acres
6.
Balance ayacut of : 4.75 Lakh acres will be created by 6/2006
TELUGU GANGA PROJECT
1
Project Profile: 408 km length canal for Pothieddypadu Head regulator to Andhra Pradesh,
Tamil Nadu Border with 4 BRs Viz., Velugodu, SPVBR, Somasila and
Kandaleru BRs.
2
Administrative Sanction
: 1.
G. O. Ms No. 2, Dt: 2-1-96 for Rs. 1805
Crs.
G. O. Ms. No. 44, Dt: 2-4-96 for
Rs. 1805 Crs,
Govt.Memo.No.7019/bids of/14-2/05
dt.14-7-05 for Rs.72.45 Crs.,
Govt.Memo.No.7109/Bidsof/14-2-05,
dt.15-2-2005 for Rs.67.387 Crs.
2.
3.
4.
3
No. of EPC Packages
: 9 No
4
Agreement value of 9 packages
: Rs.1238.427 Crs. (Inc. for 4 old ongoing
works)
5
Budget provision for 2006-07
: Rs.465.00Crs.
6
Expenditure of the project
2004 – 05 : Rs. 305.025 Crs.
2005 – 06 : Rs. 309.794 Crs.
Cum. Exp.
7
Utilisation
: Rs. 614.819 Crs
:
29 tmc of Krishna flood waters through
Velugodu and SPVBR
30 tmc of Penna flood waters through
Kandaleru BR
8
I.P. to be Created
9
Ayacut
10
Land Acquisition
11
:
New Ayacut
5.75 Lakh Acres (Kurnool: 1.08
Lakh Acres, Kadapa: 1.67 Lakh
Acres, Nellore: 2.54 Lakh
Acres,Chittoor: 0.46 Lakh
Acres)
: 6,22,335 acres
Required
: 70,000 acres
Requisitioned
: 68,920 acres
Acquired
: 59,600 acres
: 1838 acres
Forest land
Required
: 1,838 acres
Requisitioned
: 1,342 acres
Acquired
: 903 acres
12
Estimated Cost of LA
: Rs.67.00 Crs.
13
Estimated Cost of R & R
: Rs.20.00 Crs.
14
Mob. Advance (Rs. in Crores)
: Paid
2004-05 : 45.575
--
2005-06 : 59.638
39.080
Total : 105.213
15
Target date of completion
Recovered
: Khariff /2006
39.080
TELUGU GANGA PROJECT
29 TMC – Krishna Flood Flow,
15 TMC – Drinking Water to Chennai
City
Ayacut: 5.75Lakh Acres
Present
Status
Balance
Works
Kurnool
- 1.08L Acres
i). Lining of Balance length of Main Canal
Cudapah
- 1.67L Acres
ii). Balance Protection works of Balancing Reservoirs.
Nellore
- 2.54L Acres
Chittoor
- 0.46L Acres
------------------
iii). Balance works of Branch Canals & its distributary
systems
Total
Acres
5.75L
i v). No. of Packages : Category-I - 5 Packages.
Category-II - 4 Packages.
------------------
•
Entire length of 408 Km of Main Canal from Pothireddy padu Head requlator to AP boarder with
formation of 4 Balancing Reservoirs (Velugodu BR, SPVBR, Somasila & Kandaleru BR) and lining of
main canal for a length of 114.309Km completed. (13Km in Kurnool, 10.309Km in Kadapah, 29Km in
Chittoor & 62Kms in Nellore).
•
IP Created …. About 1 Lakh acres.
•
With the completion of 9 packages, the balance 4.75 Lakh acres will come in to irrigation potential by
Kharif 2006.
TELUGU GANGA PROJECT
PACKAGES
CATEGORY-I : 5 Nos. (Rs. 761.42 Crs. for 4 Packages)
CATEGORY-II: 4 Nos. (Rs. 283.87 Crs.)
PKG No./
Category
Description
Awarded
CAT-I
Construction of SPVBR Left canal up to Porumamilla Tank and its distributary system,
lining in Vulnerable reaches of TGP Main Canal etc.
M/s. IVRCL – SEW &
PRASAD
CAT-I
Execution of SPVBR left canal beyond Porumallilla Tank from Km. 0.00 to Km. 58.625
including distributaries and SPVBR right canal from Km. 0.00 to Km. 45.50 and its
distributaries, including CM & CD Works to irrigate 96,300 Acres
M/s. IVRCL – SEW &
PRASAD
Construction of Branch Canals No. 2A, 2B & 4 OF SATYA SAI GANGA CANAL together
with distributary system creating an IP of 42,027 Ac
M/s M.S.K. SURYACON
Construction of Branch Canals No. 5 & 5A OF SATYA SAI GANGA CANAL together with
distributary system creating an IP of 78090 Ac
M/s PIONEER BUILDERS
Providing Lining of TGP Main Canal Km. 0.00 to Km. 42.566 including widening and also
to link canal from KM 0.000 to KM 7.830 (up to in fall point VBR)
M/s E.C.C.I. & M.R.K.R.(J.V.)
Providing site and bed lining of TGP Main Canal from
M/s S.V.E.C. Constructions
Ltd.
39
CAT-II
40
CAT-II
50
CAT-II
51
CAT-II
Km. 42.566 to Km. 96.13 excluding lining already done & including widening at required
places
9
CC Lining of SKFF Canal between KM 5.850 to KM 45.125 and construction of KR Left
Canal and Branch Canal No. 1 together with distributaries and field channels of Satya Sai
Ganga canal to create Irrigation Potential of 22,400 Acres
M/s K.C.L.-J.C.C.G
Providing CC Lining from Km 0.00 to 42.40 km. and construction of branch canals Nos. 6
& and balance canal No. 7 together with distributary system of Satya Sai Ganga canal to
create Irrigation Potentional of 69,548 Acres
M/s. Harvins Const.Pvt. Ltd
Providing CC Lining from Km 42.4 to Km 151.887 of Satya Sai Ganga cana, construction of
tail channel with CM & CD works for escape regulator at KM 67.650 etc., and construction
of branch canals Nos. 8A, 8B & 9 together with distributary system to create irrigation
potential of 53,000 Acres
M/s ZVSTROY-GDD (JV)
CAT-I
10
CAT-I
11
CAT-I
TELUGU GANGA PROJECT
Package No.50 / Cat-II :
Contractor Name
: M/s E.C.C.I. & M.R.K.R.(J.V.)
i.
Agreement Amt.
: Rs. 72.45 Crs.
Agreement Date
: 25-7-2005
Period of Completion
: 24 Months (8 Mile Stones)
Lining to main canal from Km. 0.000 to Km.7.830
i.e. upto Velugodu Balancing Reservoir.
ii. Lining of main canal from Km. 0.000 to
Km.42.566.
Target date of Completion: 7/2007
iii. Construction of high level D.L.B. at Km.9.905
across Nippulavagu near Velpanur.
Expenditure
:
2005-06
Rs. 4.70 Crores (Inc. Mob.
:
Water released into Canal
Adv.)
Bottle Necks
TELUGU GANGA PROJECT
Package No.51 / Cat-II :
Name of the Contractor
: M/s SVEC Construction
i.
Lining to Main canal from Km. 42.566 to
Agreement Amount
: Rs. 67.387 Crs.
Km. 96.130 i.e., upto Kurnool-Kadapa
Agreement Date
: 5-3-2005
Border excluding where lining is already
Period of Completion
: 24 Months (8 Mile
completed
Stones)
Target date of Completion
: 3/2007

Investigation
: Completed

Design
: Approved

Execution
: 17 Km lining completed against 53.564 Kms

Qty. of work done
: 83350 Sq.m against 1220468 Sq.m

Execution (Canal lining) : 5.365 Km length in progress against 53.564 Km

Expenditure
:
2004-2005
2005-2006
- Rs. 3.37 Crs
- Rs. 33.38 Crs.
Cum. Exp. Inc. Mob. Adv.
- Rs.
36.75 Crs.

Bottlenecks
: Water released into the canal. Work stopped.
TELUGU GANGA PROJECT
Package No. 2
Name of the Contractor
Hyd. Agreement Amount
: IVRCL,SEW&PRASAD (JV),
: Rs. 210.42 Crs.
ii. Construction of Irrigation canal taking off from
SR-II and its distributory system.
Agreement Date
: 22-10-2004
Period of Completion
: 24 Months (8 Miles Stones)
iii. Construction of Chennamukkapalli Canal and
lining vulnerable reaches of main canal in
Kadapa District.
Target date of Completion
: 10/2006
i.
Construction of SPVBR Left Canal upto
Porumamilla tank and the distributory system.

Investigation (canal)
: Completed

Designs
: Approved

Execution
(Canal)
: 152 Km in progress against total length of 434 Km
Structures
: 45 Nos. against 48.

No. of Machinery deployed
: 118 Nos (Poclains-15, Tippers-70, Dozers-6, SFR-3, VRR-4,
Water Tankers-20)

Qty. of earth work done
: 50.47 Lakh cum against 109.33 lakh cum

Qty. of concrete work done
: 1.15,5 Lakh cum against 3.54 Lakh cum

Expenditure
:
2004-2005
- Rs. 12.17
2005-2006
Cum. Exp. Inc. Mob. Adv.
- Rs. 66.48
- Rs. 78.65
Crs
Crs.
Crs.

Land Acquisition
: Required- 2392 Ac., Requisition – 1387 Ac., Acquired:
TELUGU GANGA PROJECT
Package No.3 / Cat - I
i.
SPVBR Left Canal beyond Porumamilla
tank and SPVBR right canal.

Investigation
: Completed

Designs (Canal)
: Approved
(Structures)
Name of the Contractor
Hyd.
: IVRCL,SEW&PRASAD (JV),
Agreement Amount
: Rs. 222.30 Crs.
Agreement Date
: 22-10-2004
Period of Completion
: 24 Months (8 Mile Stones)
Target date of Completion
: 10/2006
: 66 Nos. against 314 Nos.

Execution
: 60 Km in progress against total length of 120 Km

No. of Machinery deployed
: 174 Nos (Excavators-35, Dumpers-100, Dozers-8,
Crusher-1, Batching Plant-2 & Mixer Machines-20 etc)

Qty. of earth work done
: 20 Lakh cum against 54 Lakh cum

Qty. of concrete work done
: 22,500 cum against 5,11,750 cum

Expenditure
:
Crs.

Land Acquisition
2004-2005
2005-2006
- Rs. 12.76 Crs
- Rs. 70.14 Crs.
Cum. Exp. Inc. Mob. Adv.
- Rs. 82.90
: Required - 3100 Ac;
Acquired - 180 Ac.
TELUGU GANGA PROJECT (Satya Sai Ganga Canal)
Pkg.No. 10 : Providing Cement Concrete lining to
Satya Sai Ganga Canal with paver in between Km.0.0
and Km.42.400 and construction of Branch canal
No.6, balance works of branch canal no.7 together
with the distributary system creating direct irrigation
potential of 69,548Acs. Including investigation,
design and estimation.
Name of the Contractor
Agreement Amount
Agreement Date
Period of completion
Target date of completion

Investigation
: 181 Kms against 208.76 Kms

Designs
: H. Ps approved 22.6 KM against 208.76 KM

Structures
: 15 Nos. against 800 Nos.

Expenditure
: 2005-2006

Land Acquisition
: Required 1245 Acres,
: M/s. Harvins Const.Pvt. Ltd
: Rs. 145.00 Crs.
: 22-08-2005
: 24 Months (8 milestones
: 3/2007
- Rs. 15.15 Crs. (Inc.Mob. Adv.)
Acquired 89.77 Acres
TELUGU GANGA PROJECT (Satya Sai Ganga Canal)
Pkg.No. 11/Cat-I : Lining to Satya Sai Ganga Canal in
between Km. 42.400 and Km.151.887, Construction of
tail channel with CM&CD works for escape regulator
at Km.67.650, Construction of Satya Sai Canal and
creating direct Irrigation potential of 53,000Acres
including investigation, design and estimation.
Name of the Contractor
: Z.V. Story - - GDCL (JV) (P)
Agreement Amount
Agreement Date
Period of completion
Target date of completion
: Rs. 153.70 Crs.
: 23-03-2005
: 24 Months (8 milestones
: 3/2007
Ltd.

Investigation
: 320 Kms length against 320 Kms.

Designs
: 165 Kms against 320 Kms, HPs approved
Strucutures approved
: 200 Nos. against 900 Nos.
Execution
: 50.75 Kms length against 171 Kms.
Structures
: 1 No. against 900 Nos.

Qty. of earth work done
: 5.00 lakh cum against 22.00 Lakh cum

Qty. of concrete work done
: 29,324 cum against 2.14 Lakh cum

No. of Machinery
: 202 (Excavators-19, Tippers-81, Mixers-27, Paver-1 etc.)

Expenditure
:

Land Acquisition
: Required 1299 Ac., Acquired 239.87 Ac.

2004-2005
2005-2006
Cum. Exp. Inc. Mob. Adv.
- Rs. 7.69 Crs
- Rs. 42.46 Crs.
- Rs. 50.15 Crs.
TELUGU GANGA PROJECT (SKFF)
Pkg.No. 9 : Providing cement concrete lining with
paver to Somasila Kandaleru Flood Flow Canal
between Km.5.850 and Km.45.125, Construction of
K.R. Left Canal, Branch canal No.1 of Satya Sai
Ganga Canal together with distributary system
creating an irrigation potential of 22,400 Acres
Name of the Contractor
Agreement Amount
Agreement Date
Period of completion
Target date of completion

Investigation
: 173.305 Km length against 346 K.M

Designs approved
: 99.78 Kms length against 346 Kms
Structures
: 13 Nos. against 1025 Nos.
Execution
: 25.50 Kms length against 346 Kms.

Structures
: M/s. K.C.L. JCCG (JV)
: Rs. 175.00 Crs.
: 21.03.2005
: 24 Months (8 milestones
: 3/2007
: 2 Nos. against 1025 Nos.

Qty. of earth work done
: 23,00,000 cum against 46,94,000 cum

Qty. of concrete work done : 0.23 Lakhs cum against 3.7 Lakhs cum.

No. of Machinery
: 95 Nos. (Excavators 10, tippers 30, concrete mixture 12 etc.)

Expenditure
:

Land Acquisition
: Required 1235 Acres,
2004-2005
2005-2006
- Rs. 8.75 Crs
- Rs. 37.42 Crs.
Cum. Exp. Inc. Mob. Adv.
- Rs. 46.17 Crs.
Acquired 28.77
TELUGU GANGA PROJECT (Satya Sai Ganga Canal)
Pkg.No. 39 : Construction of Branch canals
No.2A, 2B & 4 of Satya Sai Ganga Canal
together with distributary system creating an
irrigation potential of 42.027 Acres including
investigation, design & estimation.
Name of the Contractor
Agreement Amount
Agreement Date
Period of completion
Target date of completion

Investigation
: Km. 171.155 length against Km. 375

Designs
: 66.075 Km length against 375 Km

Structures
: 59 Nos. against 652 Nos.

Execution
: 20 Kms length against 375 Kms.
Structures
: 1 No. against 652.

Qty. of earth work done
: 5.15 Lakhs cum against 31.47 Lakhs cum

Qty. of concrete work done : 0.033 Lakh cum against 1,31,660 cum

No. of Machinery
: M/s. MSK Surya Con.(JV
: Rs. 60.84 Crs.
: 28-03-2005
: 24 Months (8 milestones
: 3/2007
: 33 Nos. (Excavators-5, Dumpers-7, concrete mixers-3, other mach.-
10)

Expenditure
:
2005-2006
- Rs. 11.21 Crs. (Inc. Mob. Adv.)

Land Acquisition
: Required 1895 Acres, Acquired 40Acres
TELUGU GANGA PROJECT (Satya Sai Ganga Canal)
Pkg.No. 40 : Construction of Branch canals 5
and 5A of Satya Sai Ganga Canal together
with distributary system creating an irrigation
potential of 77,640 Acres including
investigation, design & estimation.
Name of the Contractor
Agreement Amount
Agreement Date
Period of completion
Target date of completion

Investigation
: 394 Km length against 437.79 Km

Designs
: 372.12 Km length against 437.79 Km
Structures

Execution
Structures
: M/s. Pioneer Builders
: Rs. 82.89 Crs.
: 03-07-2005
: 24 Months (8 milestones
: 3/2007
: 400 Nos. against 2287 Nos.
: 50 Kms Length against 437.79 Kms.
: 63 Nos. against 2287 Nos.

Qty. of earth work done : 20.00 Lakhs cum against 100 Lakhs cum

Qty of concrete work done: 0.05 lakh cum against 2.00 Lakh cum.

No. of Machinery
: 119 Nos. (Excavators-26, Tippers-60,Mixer-0,JCB-2,Concrete Mixer-1 etc.)

Expenditure
:

Land Acquisition
: Required 3746 Acres, Acquired 214.20 Acres
2004-2005
2005-2006
- Rs. 4.14 Crs
- Rs. 12.74 Crs.
Cum. Exp. Inc. Mob. Adv.
- Rs. 16.88 Crs.