56.775 KM
57.700 KM
GNSS Flood Flow
Canal
PKG 1
PKG 2
GNSS FFC
PKG 89
GORAKALLU RESERVIOR
Capacity: 10.29 TMC
FRL : +261 M
Package: Open Category
LEGEND
Completed
With the completion of the above packages, an Irrigation Potential 35,000
Ac will be created in Kadapa District in Phase-I.
SARVARAJA
SAGAR
(3.059 TMC)
VAMIKONDA
SAGAR
(3.249 TMC)
KM 24.33
KM 32.64
16.225 KM
GANDIKOTA
RESERVOIR
FRL + 209 M
CAP: 11.943 TMC(Live)
16.840 TMC (Gross)
SRBC Bypass
canal (5 M dia)
KM 34.80
KM 52.875
SRBC
PKG 48
PKG 47
SRMC
PKG 49
Tunnel 5.25 Km
OWK
RESERVOIR
4.31TMC
KM 16.50
KM 0.00
POTHIREDDYPADU
HEAD REGULATOR
Sill : +841’
BANAKACHERLA
CROSS REGULATOR
GNSS PROJECT (PHASE-I)
Work in Progress
Tender Stage
GNSS PROJECT (PHASE-I)
1
PROJECT PROFILE
Location of Head works
: Pothireddypadu Head regulator, foreshore of
Srisailam Reservoir
: G. O. Ms. No. 53, Dt: 1-6-04 for Rs.
560.00 Crs.
G. O. Ms. No. 5, Dt: 11-1-05 for Rs.
271.00 Crs.
G. O. Ms. No. 108, Dt: 2-3-05 for Rs.
340.00 Crs.
: 6
2
Admn. Sanction
3
No. of Packages (EPC)
4
Agreement value of packages
:
Rs. 1055.84 Crs.
5
Budget Provision
:
Rs. 330.00 Crs.
6
Expenditure
2004-05
:
Rs. 67.09 Crs.
2005-06
:
Rs. 222.57 Crs.
Cum. Exp.
:
Rs. 289.66 Crs.
:
38 TMC
7
Utilisation
8
Ayacut
Ultimate :
Phase-I :
2.6 Lakh acres (Cuddapah: 1,55,000
Acres, Chittoor: 1,03,500 Acres,
Nellore: 1500 Acres)
35,000 Acres in Kadapa District
GNSS PROJECT (PHASE-I)
9
10
11
Land Acquisition (Ultimate)
Required :
26,284 acres
Requisitione :
d
22,223 acres
Acquired :
4,082 acres
Mob. Advance.
Target Date
Paid
Recovered
2004-05 :
Rs. 67.09 Crs.
--
2005-06 :
Rs. 11.26 Crs.
Rs. 30.64 Crs
Total :
Rs. 78.35 Crs.
Rs. 30.64 Crs.
:
3/2008
GNSS PROJECT (PHASE-I)
Bid /Agreement
Amount
Rs in Crs.
Agreement
concluded
date
Mobilisation
Advanace
Rs. in Crs.
M/s Mythas –
NCC,
Hyderabad
250.20
3 / 2005
12.51
Excavation of Main canal from KM 24.33 to
KM 32.64, formation of Vamikonda and
Sarvaraja sagar reservoirs including CM &
CD works, distributories, field channels
complete
M/s Gammon
India Ltd.
294.45
3/2005
13.72
OC
Gadikota LI Scheme (Gandikota Reservoir
to Pulivendula Branch Canal)
M/s KBLM –
CCL (JV)
286.00
3/2005
14.30
47
Excavation of GNSS Flood flow canal from
Owk Reservoir to Gandikota Reservoir from
0.00 KM to 16.50 KM, including Head
regulator, CM & CD works
Engineers &
Contractors,
Hyd
72.997
28-2-2005
3.65
48
Excavation of GNSS Flood flow canal from
Owk Reservoir to Gandikota Reservoir from
16.50 KM to 34.80 KM including Head
regulator, CM & CD works
Coramandal
Prestcerte (P)
Ltd, Hyd.
78.559
49
Excavation of GNSS Flood flow canal from
Owk Reservoir to Gandikota Reservoir from
34.80 KM to 52.87 KM including Head
regulator, CM & CD works
Coramandal
Prestcerte(P)Lt
d, Hyd
73.65
PKG
No.
Description
1
Construction of Gandikota Reservoir across
river Pennar and Head regulator.
Excavation of Main canal from KM 0.00 to
KM 24.33, including CM & CD works,
distributories, field channels etc.,
2
Name of
Contractor
1055.84
28-2-2005
28-2-2005
3.927
3.682
GALERU NAGARI SUJALA SRAVANTHI
Package No.1 [EPC System]
i.
Construction of Gandikota dam across Penna
river.
ii.
Earth work excavation of main canal from Km.
0.000 to Km.24.330, fabrication and erection of
radial crest gates, stop log gates and its
accessories, river sluice gates, gantry crane etc.
iii. Construction of Head Regulator.
Name of the Contractor
Hyd. Agreement Amount
: M/s MAYTAS-NCC (JV),
: Rs. 250.20 Crs.
Agreement Date
: 25-10-2004
Period of Completion
: 30 Months
Target date of Completion
: 4/2007
Investigation
: Completed
Design (Canal)
: 12 Km length approved against 24.33 Kms. Completed
Execution (Canal)
: 12 Km length completed against 24.33 Kms.
Execution (Dam)
: Exploring drilling completed.
Qty. of earth work done
: 52,93,972 cum against 81,98,000 cum
Qty. of concrete work done
: 2,807 cum against 3,04,000 cum
Expenditure
: Rs. 78.21 Crs. (Inc. Mob. Adv. Rs. 12.51 Crs.) against Rs.
250.20 Crs.
2004-05
: Rs. 12.51 Crores (mob. Adv. Only)
2005-06
: Rs. 65.7 Crores.
Land Acquisition
: Required 16397 Ac. Acquired 3398 Ac. Requisitioned:16398 Acs
R&R
: Estimate under preparation
GALERU NAGARI SUJALA SRAVANTHI
Package No. 2
i.
ii.
Excavation of main canal from Km. 24.33 to
Km. 32.64.
Formation of Vamikonda Sagar and Sarvaraya
Sagar reservoir and leading channels to
reservoirs and its distributaries etc.
Name of the Contractor
Mumbai
: M/s Gammon India Ltd.,
Agreement Amount
: Rs. 294.45 Crs.
Agreement Date
: 25-10-2004
Period of Completion
: 30 Months
Target date of completion
: 4/2007
Investigation
: Completed
Design
: 5 Km length approved against 10 Km
Structures
: Under Approval
Execution
: 6.5 Km length in progress against 10 Km
Qty. of earth work done : 6 T cum against 7.73 T cum
Expenditure
: Rs. 43.78 Crs. (inc. mob. adv. Rs. 14.72 Crs) against Rs. 394.45
Crs.
2004-05
: Rs. 14.72 Crs. (Mob. Adv.)
2005-06
: Rs. 29.06 Crs.
Land Acquisition
Acres.
: Required – 5253 Ac. Requisitioned : 5053 Acres Acquired : 419
GALERU NAGARI SUJALA SRAVANTHI
Name of the Contractor
: Engineers & Contractors, Hyd.
Agreement Amount
: Rs. 72.99 Crs.
Flood Flow Canal from Owk Reservoir to
Agreement Date
: 28-2-2005
Gandikota Reservoir including construction
Period of Completion
: 24 Months
of Head Regulator from Km.0.000 to Km.
Target date of completion
: 2/2007
Package No.47 / Cat – II
i.
16.500..
Investigation : Length in 17.954 KMs against 17.954 KMs – Completed
a) Designs approved length 17.954 in KMS against 17.954 KMS - Approved
b) Structures approved 17 Nos. against total 17 Nos. of Structures – Approved
a) Execution: Length in 8.00 KM in progress against total length of 17.954 KM
b) Structures approved - Nil - Nos. against total 17 Nos. of Structures
a) Qty. of earth work done : 20,25,000 Cum against 49,36,500 Cum.
b) Qty. of Concrete works done - Nil - Cum against 46,000 cum.
No. of Machinery (Machinery wise) deployed.Excavaters - 11,Tippers-45,Dozers-3,Compressers-8,Wagon Drills -8,
Water Tankers-3
Expenditure
2004-05
2005-06
Mob. Adv. Recovered
Land Acquisition
: Rs 28.97 Crs. (including Mob. Adv. Rs. 7.30 Crs.) against Rs. 72.999 Crores
: Rs. 3.65 Crs (Mob. Adv. Only)
: Rs. 25.32 Crs. (Inc. Mob. Adv. Rs. 3.65 Crs.)
: Rs. 3.63 Crores
: Required : 640 Acres; Acquired : Nil, Requisitioned 640 Acres.
GALERU NAGARI SUJALA SRAVANTHI
Package No.48 / Cat – II
Name of the Contractor
Hyd.
: Coramandal Prestcerte(P)Ltd,
i.
Agreement Amount
: Rs. 78.55 Crs.
Agreement Date
: 28-2-2005
Period of Completion
: 24 Months
Flood Flow Canal from Owk Reservoir to
Gandikota Reservoir including construction
of CM & CD works from Km.16.500 to Km.
34.800.
Target date of Completion: 2/2007
Investigation : Length in 16.02 KMs against 16.02 KMs – Completed
a) Designs approved length 16.02 in KMS against 16.02 KMS – Approved
b) Structures approved Nil. against total 19 Nos. of
Structures
a) Execution: Length in 7 KM in progress against total length of 16.02 KM
b) Structures approved - 9 Nos. against total 19 Nos. of Structures
a)Qty. of earth work done 25,50,000 Cum Against 50,15,000 cum
No of Machinery deployed. (Excavators – 5, Tippers – 15, Dozer – 3, Compressors – 13, Wagon drills -13)
Expenditure:
Rs. 48.78 Crs. (inc. mob. Adv. of Rs. 7.86 Crs. against Rs. 78.56
Crs.
2004-05
: Rs. 3.93 Crs (Mob. Adv.)
2005-06
: Rs. 44.85 Crs. (Inc. Mob. Adv. Rs. 3.93 Crs)
Mob. Advance Recovered : Rs. 7.86 Crores
GALERU NAGARI SUJALA SRAVANTHI
Package No.49 / Cat – II
Name of Contractor
(P)Ltd
: Coramandal Prestcerte
i.
Agreement Amount
: Rs. 73.658 Crs.
Agreement Date
: 28-2-2005
Period of Completion
: 24 Months
Flood Flow Canal from Owk Reservoir to
Gandikota Reservoir including construction
of CM & CD works from Km.34.800 to Km.
52.300.
Target date of Completion: 2/2007
1
Investigation : Length in 17.4 KMs against 17.4 KMs - Completed
2
a) Designs approved length 17.4 in KMS against 17.4 KMS – Approved
3
a) Execution: Length in 13 KMs in progress against total length of 17.4 KM
4
a) Qty. of earth work done 43.8 Lakhs Cum against 57.26 Lakhs Cum.
b) Qty. of Concrete works done - Nil - Cum against 13 Nos of Structure Concrete.
5
6
No. of Machinery (Machinery wise) deployed ; Excavators -8,Tippers-12, Dozers-6, Compressors-10, Wagon
Drill-10.
Expenditure
: Rs. 50.60 Crs. (including advances Rs. 7.36 Crs. against Rs. 73.66 Crs.
2004-05
: Rs. 3.68 Crs. (Mob. Adv)
2005-06
: Rs. 46.92 Crs. (Inc. Mob. Adv. Rs. 3.68 Crs)
Mob. Advance Recovered : Rs. 7.36 Crores
Land Acquisition
: Required : 737 Acres ; Acquired : Nil, Acquired – 737 Acres