Transcript Slide 1

Flow Diagram of Yadiki Canal System (PABR Stage-II)
(Not to Scale)
Yadiki Left Branch Canal
20 Km.
75 Cusecs
Yadiki Canal
(Kristipadu Left Canal)
180 Cusecs
(7500 Ac.)
17.375 Km(7500 Ac.)
18.755 Km
M.P.N.C 58.725 Km &
Lakshmipalli Vanka
9.50 Km (500 Cusecs)
River Pennar
Kristipadu Right Canal
M.P.R. Dam
30 Cusecs
11.525 Km. (3000 Ac.)
Yadiki Right Branch Canal
Kristipadu
Regulator
Kristipadu Left branch Canal
(45 Cusecs)
8.00 Km.
(4500 Ac.)
Canal
Kristipadu Right Canal
(275 Cusecs)
4.675 Km
320C/s 6.590 Km
7.386 Km
9.301 Km
(18500 Ac.)
Pendekallu Reservoir
Pendekallu Supply Channel
(230 Cusecs)
25.00 Km.
Cap. 0.65 TMC
9.50 Km.
Kristipadu Right Branch Canal 10.340 Km.
(45 Cusecs)
AYACUT DETAILS
1)
yadiki Canal ( Left canal ) -
18,000 ac
2)
Kristipadu Right Canal -
9,000 ac
3)
Pendekallu Reservoir Canal - 18,500 ac
4)
Chagallu Barrage Canal -
4,500 ac
Total -
50,000 ac
(4500 Ac.)
Link Channel
11.00 Km.
INDEX
Package No. 31 Package No. 32 Package No. 33 -
River Pennar
Chagallu Barrage
Cap. 1.5 TMC
Chagallu Barrage Right Canal
45 Cusecs
16.00 Km. (4500 Ac.)
To be
finalised
YADIKI CANAL SYSTEM (PABR STAGE – II)
1.
To draw 5 TMC water from MPR dam
PROJECT PROFILE
To irrigate 50,000 Acres
 To
complete the balance work
: 3 packages
Cost of the project (EPC Packages): Rs.
450.00Crs
O. Rt. No. 45, Dt: 10-1-2005 for
: G.
Rs. 536.00 Crores
2
Admn. Sanction
3
No. of EPC Packages
:
3 (1 Package yet to be finalised)
4
Agreement value of packages (2 Nos.)
:
Rs. 348.9 Crs
5
Budget Provision
:
Rs. 150.00 Crs
6
Expenditure of the Project
2004-05 (including ongoing works) :
7
Utilisation
8
Ayacut
9
Land Acquisition
Rs. 27.39 Crores
2005-06
:
Rs. 53.49 Crores
Cum. Exp.
:
Rs. 80.88 Crores
:
5 TMC
New :
50,000 Acres
Required :
6066.47 Acres
Requisitione :
d
Acquired :
4904.74 Acres
622.62 Acres
YADIKI CANAL SYSTEM (PABR STAGE – II)
10
11
12
Estimate cost of R & R
Paid
Mob. Adv.
Target Date
: Under Preparation
Recovered
2004-05
: Rs. 17.45 Crs
--
2005-06
: Rs. 9.03 Crs.
--
TOTAL
: Rs. 26.48 Crs
--
: 9/2007
PABR STAGE-II (YADIKI CANAL SYSTEM)
Agt. Value & Date Agt. Period
Name of the
contractor
PKG No.
Description
31
Construction of Head sluice to MPR Dam,
Widening & lining of MPNC incl.
CM&CD, IMP to Lakshmipalli vanka and
Yadiki canal system.
32
Pendekallu Bal. Res. Incl of supply
channel, dist sys, CM&CD works
Rs. 104.40 Crores
17-03-05
30 months
M/s KCL-JCCG (J.V),
Hyd
33
Const of Chagallu barrage across Pennar
incl of Dist. System
Rs. 244.50 Crores
26-03-05
30 months
M/s Navayuga
Transtroy (J.V), Hyd
Tenders Recalled 3rd time on 2-11-2005
No response
Instructions awaited from ENC (Irrigation)
TOTAL Rs. 348.90 Crores.
PABR STAGE-II (YADIKI CANAL SYSTEM)
Package No.32 / Cat – I
i.
ii.
Formation of Pendekallu Balancing Reservoir
Name of the Contractor : M/s KCL-JCCG(JV),
(0.65 TMC) with supply channel irrigation
Agreement Amount
: Rs.104.40 Crs.
canal and distributary system for 18500 Ac.
Agreement Date
: 17-3-2005
Supply and Erection of Radial and Stop log
Period of Completion
: 30 Months
gates and Gantry crane to Chagallu Barrage.
Target Date of completion: 9/2007

Investigation
: Completed

Designs
: Under approval

Execution
: Under Progress

EXPENDITURE
: Rs. 22.39 Crs. (inc. mob. adv. Rs.9.12 Crs.) against Rs. 104.40
Crs.
 2004-05
: Rs. 5.22 Crs. (Mob. Adv.)
 2005-06
: Rs. 17.17 Crs. (Inc. Mob. Adv. Rs. 3.9 Crs.)
PABR STAGE-II (YADIKI CANAL SYSTEM)
Package No.33 / Cat – I
i.
Construction of Chagallu Barrage (1.50 TMC)
Name of the Contractor
(JV),
structures, distributaries to create I.P. of 4500
Agreement Amount
: Rs.244.50 Crs.
Agreement Date
: 26-3-2005
Supply and fixing of Radial gates, stop log
Period of Completion
: 30 Months
gates, walk way bridge and Gantry Crane.
Target date of completion : 9/2007
Ac.
ii.
: M/s Navayuga-Transstroy

Investigation
: Completed

Designs
: Under approval

Execution
: Works in progress

EXPENDITURE
: Rs. 40.29 Crs. (mob. adv. of Rs. 17.36 Crores) against Rs. 244.50
Crs.
2004-05
: Rs. 12.23 Crs. (Mob. Adv.)
2005-06
: Rs. 28.06 Crs. (Inc. Mob. Adv. Rs. 5.13 Crs.)

Land Acquisition
: Required 3978 Ac , Acquired – 35.16 Acs

Bottle Necks
: Land acquisition
PABR STAGE-II (YADIKI CANAL SYSTEM)
Package No.31 / OC
Tenders Recalled 3rd time on 2-11-2005
No response
Instructions awaited from ENC (Irrigation)
Land Acquisition : 2,149 Acres
Category – II : 2 or 3