Transcript Slide 1
Flow Diagram of Yadiki Canal System (PABR Stage-II) (Not to Scale) Yadiki Left Branch Canal 20 Km. 75 Cusecs Yadiki Canal (Kristipadu Left Canal) 180 Cusecs (7500 Ac.) 17.375 Km(7500 Ac.) 18.755 Km M.P.N.C 58.725 Km & Lakshmipalli Vanka 9.50 Km (500 Cusecs) River Pennar Kristipadu Right Canal M.P.R. Dam 30 Cusecs 11.525 Km. (3000 Ac.) Yadiki Right Branch Canal Kristipadu Regulator Kristipadu Left branch Canal (45 Cusecs) 8.00 Km. (4500 Ac.) Canal Kristipadu Right Canal (275 Cusecs) 4.675 Km 320C/s 6.590 Km 7.386 Km 9.301 Km (18500 Ac.) Pendekallu Reservoir Pendekallu Supply Channel (230 Cusecs) 25.00 Km. Cap. 0.65 TMC 9.50 Km. Kristipadu Right Branch Canal 10.340 Km. (45 Cusecs) AYACUT DETAILS 1) yadiki Canal ( Left canal ) - 18,000 ac 2) Kristipadu Right Canal - 9,000 ac 3) Pendekallu Reservoir Canal - 18,500 ac 4) Chagallu Barrage Canal - 4,500 ac Total - 50,000 ac (4500 Ac.) Link Channel 11.00 Km. INDEX Package No. 31 Package No. 32 Package No. 33 - River Pennar Chagallu Barrage Cap. 1.5 TMC Chagallu Barrage Right Canal 45 Cusecs 16.00 Km. (4500 Ac.) To be finalised YADIKI CANAL SYSTEM (PABR STAGE – II) 1. To draw 5 TMC water from MPR dam PROJECT PROFILE To irrigate 50,000 Acres To complete the balance work : 3 packages Cost of the project (EPC Packages): Rs. 450.00Crs O. Rt. No. 45, Dt: 10-1-2005 for : G. Rs. 536.00 Crores 2 Admn. Sanction 3 No. of EPC Packages : 3 (1 Package yet to be finalised) 4 Agreement value of packages (2 Nos.) : Rs. 348.9 Crs 5 Budget Provision : Rs. 150.00 Crs 6 Expenditure of the Project 2004-05 (including ongoing works) : 7 Utilisation 8 Ayacut 9 Land Acquisition Rs. 27.39 Crores 2005-06 : Rs. 53.49 Crores Cum. Exp. : Rs. 80.88 Crores : 5 TMC New : 50,000 Acres Required : 6066.47 Acres Requisitione : d Acquired : 4904.74 Acres 622.62 Acres YADIKI CANAL SYSTEM (PABR STAGE – II) 10 11 12 Estimate cost of R & R Paid Mob. Adv. Target Date : Under Preparation Recovered 2004-05 : Rs. 17.45 Crs -- 2005-06 : Rs. 9.03 Crs. -- TOTAL : Rs. 26.48 Crs -- : 9/2007 PABR STAGE-II (YADIKI CANAL SYSTEM) Agt. Value & Date Agt. Period Name of the contractor PKG No. Description 31 Construction of Head sluice to MPR Dam, Widening & lining of MPNC incl. CM&CD, IMP to Lakshmipalli vanka and Yadiki canal system. 32 Pendekallu Bal. Res. Incl of supply channel, dist sys, CM&CD works Rs. 104.40 Crores 17-03-05 30 months M/s KCL-JCCG (J.V), Hyd 33 Const of Chagallu barrage across Pennar incl of Dist. System Rs. 244.50 Crores 26-03-05 30 months M/s Navayuga Transtroy (J.V), Hyd Tenders Recalled 3rd time on 2-11-2005 No response Instructions awaited from ENC (Irrigation) TOTAL Rs. 348.90 Crores. PABR STAGE-II (YADIKI CANAL SYSTEM) Package No.32 / Cat – I i. ii. Formation of Pendekallu Balancing Reservoir Name of the Contractor : M/s KCL-JCCG(JV), (0.65 TMC) with supply channel irrigation Agreement Amount : Rs.104.40 Crs. canal and distributary system for 18500 Ac. Agreement Date : 17-3-2005 Supply and Erection of Radial and Stop log Period of Completion : 30 Months gates and Gantry crane to Chagallu Barrage. Target Date of completion: 9/2007 Investigation : Completed Designs : Under approval Execution : Under Progress EXPENDITURE : Rs. 22.39 Crs. (inc. mob. adv. Rs.9.12 Crs.) against Rs. 104.40 Crs. 2004-05 : Rs. 5.22 Crs. (Mob. Adv.) 2005-06 : Rs. 17.17 Crs. (Inc. Mob. Adv. Rs. 3.9 Crs.) PABR STAGE-II (YADIKI CANAL SYSTEM) Package No.33 / Cat – I i. Construction of Chagallu Barrage (1.50 TMC) Name of the Contractor (JV), structures, distributaries to create I.P. of 4500 Agreement Amount : Rs.244.50 Crs. Agreement Date : 26-3-2005 Supply and fixing of Radial gates, stop log Period of Completion : 30 Months gates, walk way bridge and Gantry Crane. Target date of completion : 9/2007 Ac. ii. : M/s Navayuga-Transstroy Investigation : Completed Designs : Under approval Execution : Works in progress EXPENDITURE : Rs. 40.29 Crs. (mob. adv. of Rs. 17.36 Crores) against Rs. 244.50 Crs. 2004-05 : Rs. 12.23 Crs. (Mob. Adv.) 2005-06 : Rs. 28.06 Crs. (Inc. Mob. Adv. Rs. 5.13 Crs.) Land Acquisition : Required 3978 Ac , Acquired – 35.16 Acs Bottle Necks : Land acquisition PABR STAGE-II (YADIKI CANAL SYSTEM) Package No.31 / OC Tenders Recalled 3rd time on 2-11-2005 No response Instructions awaited from ENC (Irrigation) Land Acquisition : 2,149 Acres Category – II : 2 or 3