Somasila Project

Download Report

Transcript Somasila Project

SOMASILA PROJECT (2 years period)
SOUTH FEEDER CANAL (PKG 95)
Discharge : 353 Cuses
Ayacut
: 41,000 Ac.
Length
: 72.00Km
NELLORE
ANICUT
PENNA RIVER
KANDALERU
RESERVOIR
Capacity
Ayacut
FRL
• Head works, 3 main canals & Structures
•completed.
30Nos. Distributaries under the 3 canals are in progress and are to be completed by 3/2006.
: 68.05TMC
: 3Lakh Acres.
: + 279’
Poondi
Reservoir
• Lining works for all 3 Main Canals proposed in package 94, 95 & 96 for Rs.95Cr.
• The Project will be completed by 6/2006 & IP of 4.14 Lakh Acres (Stab. 2.75 Lakh acres + New 1.39 Lakh acres) will be created.
• Funded by AIBP.
BAY OF BENGAL
KANIGIRI RESERVOIR
SANGAM
ANICUT
SOMASILA RESERVOIR
Capacity : 78 TMC
FRL
:
330’(+100.58M)
Ayacut : 4.14L Acrs.
SOMASILA PROJECT
1
Project Profile: Across river Pennar at Somasila (V), Nellore (Dt.)
2
No. of EPC Packages
: 3 No
4
Agreement value of 3 packages
: Rs.94.87 Crs.
5
Budget provision for 200607
: Rs.150.00 Crs.
6
Expenditure of the project
2004 – 05 : Rs. 550.75 Crs.
2005 – 06 : Rs.
Cum. Exp.
7
Utilisation
8
Ayacut
9
: Rs. 595.03 Crs
: 48.54 TMC
New Ayacut
: 1,39,000 acres
Stabilisation
: 2,75,000 acres
Total
: 4,14,000 acres
Land Acquisition
Required
10
44.28 Crs.
Forest land
: 133.44 acres
Requisitioned
: 13.44 acres
Acquired
: 21.61 acres
: 636.90 acres for canals
12
13
Mob. Advance (Rs. in Crores)
Target date of completion
: Paid
Recovered
2004-05 : 1.83
--
2005-06 : 7.08
--
Total : 8.91
--
: 7/2006
SOMASILA PROJECT
PKG
No.
Description
Agt. Value &
Date
94
Providing cement concrete lining
of Kavali canal between KM 1.609
and KM 67.619
Rs. 36.603 Cr.
Dt: 23.3.05
95
Providing cement concrete lining
in bed and side slopes of somasila
project in between KM 11.4000 to
KM 74.725
Rs. 28.81 Cr
Dt:25.3.05
96
Providing cement concrete lining
of GK canal (NFC) between 13.00
and KM 72.920
Rs. 29.4643 Cr
Dt: 25.3.05
Agt. Period
Name of the
contractor
24 Months
M/s SRK Bhailal
Bhai, JV, Hyd
24 Months
M/s MSK –
SURYACON (JV),
Nellore
24 Months
M/s MSK –
SURYACON (JV),
Nellore
SOMASILA PROJECT
Pkg.No. 94/Cat-II : Easening of slops 1:5:1
providing cement concrete lining with paver
in bed and side slopes of Kavali canal of
Somasila Project in between Km.1.609 to
Km.67.619 including Investigation, Design
and estimation.
Name of the Contractor
(JV)
Agreement Amount
Agreement Date
Period of completion
Target date of completion
: M/s. S.r.K. Bhailal Bhai
: Rs. 36.60 Crs.
: 23-03-2005
: 24 Months(8 milestones)
: 3/2007

Designs
: HPs approved

Execution
: work not in progress due to water released into the canal

Qty. of earth work done : 70,000 cum against 7,27,907cum

Machinery
: Deployed 45 Nos. (Excavators-7, Tippers-19,paver-2,concrete mixers-4
Nos)


Expenditure
Bottle Neck
:
2004-2005
- Rs. 1.83 Crs.
2005-2006
- Rs. 1.83 Crs.
Cum. Exp. Mob. Adv. only
- Rs. 3.66 Crs.
: Forest clearance.
SOMASILA PROJECT
Pkg.No. 95/Cat-II : Construction of
distributary system of create irrigation
potential of 912 Acres including investigation,
design and estimation.
Name of the Contractor
Con(JV)
: M/s. M.S.K. Surya
Agreement Amount
: Rs. 28.81 Crs.
Agreement Date
: 25-03-2005
Period of completion
: 24 Months(8 months)
Target date of completion
: 3/2007

Investigation
: 63.325 Km length against 81.40 Km

Design
: 2.00 Km length against 81.40 Km

Execution
: 14 Kms length against 81.40 Kms.

Qty. of earth work done
: 3,37,000 cum against 10,23,380cum

Qty. of concrete work done
: 3000 cum against 61,990 cum

No. of Machinery
: 43 Nos. (Excavators-5, Tippers-4, pavers-4, concrete
Mixers-6)

Expenditure
:
2005-2006
- Rs. 4.83 Crs. (Inc. Mob. Adv.)

Land Acquisition
: Required 133.44 ac., Acquired 21.61 ac.

Bottle neck
: Forest clearance and land acquisition.
SOMASILA PROJECT
Pkg.No. 96/Cat-II : Easening of slops 1:5:1
providing cement concrete lining with paver
in bed and side slopes of G.K. Canal (NF.C) of
Somasila Project in between Km.13.00 and
Km.72.920 including Investigation, Design
and estimation.
Name of the Contractor
: M/s. M.K.S. Surya Const(JV
Agreement Amount
: Rs. 29.46 Crs.
Agreement Date
: 25-03-2005
Period of completion
: 24 Months(8 milestones)
Target date of completion
: 3/2007

Investigation
: Completed.

Designs
: In progress

Execution
: 9.73 Km length against 59.92 Kms.

Qty. of earth work done : 1,25,000 cum against 9,53,297 cum

Machinery
: Deployed 5 Nos. (Excavator-1, Tippers-4)

Expenditure
: 2005-2006

Forest land
: Required 148.26 acres

Bottle Necks
: Forest clearance
- Rs. 3.53 Crs. (Inc. Mob. Adv.)