Transcript Document

ECENA 3rd Plenary meeting
September 18-19, 2008
Istanbul, Turkey
Kosova/o
1
IPPC Directive
•
Status of IPPC Transposition
Law on IPPC
(expected to be approved within this year)
•
•
•
•
•
•
Stakeholder involvement
Industries and other stakeholders are involved in the drafting of the IPPC legislation,
and their contributions have been taken into consideration.
Institutional structures for IPPC law implementation
Structures are in place at central level but not on the local level.
Inventory of IPPC Installations
A rough and approximate inventory of IPPC installations has been made and the
number of installations are approximately 30.
Timetable for IPPC Permitting
There is no strict timetable for granting integrated permits for installations
Best Available Techniques
There are neither tools nor a strategy for following the developments of BAT
Competencies and skills for issuing integrated permits
Plans are being prepared to improve the skills needed for issuing integrated permits.
2
Large Combustion Plants
Directive
• Transposition of LCP Directive –
Partly transposed
• Inventory of LCP installations
There are 9 LCP installation in Kosovo
• National Emission Reduction Plan, set ELVs or both
Both National Emission Reduction Plan and ELVs in place
• Competent Authorities
Ministry of Environment and Spatial Planning
• Systems to determine total emission values from existing LCPs
There are no systems in place
3
Seveso II Directive
•Transposition of Seveso II Directive
Partly transposed
•Inventory of Seveso II installations
Not yet but in process
•Competent Authorities/Tasks
Ministry of Environment and Spatial Planning- Planning in
case of accidents
Emergency Department-react in case of accidents
•Accident prevention policies -required
•Safety reports -required
4
Waste Landfill Directive
•
•
•
•
•
•
•
•
•
Transposition of Waste Landfill Directive –
Has been transposed
Number of landfills- There are 35 landfills
Landfill classification -26 municipality landfills, 9 industrial landfills
Strategy for reduction of BMW to landfills
At the moment there is no approved strategy, it is expected that MESP will finalize the strategy about
the administration of waste in Kosovo during the year 2009.
Target for reduction of BMW to landfills
Not yet determined
Criteria for waste to be accepted to landfills
Yes, only in landfills of municipal waste
Waste NOT accepted
Waste not accepted in the landfill are determined by Article 9 of the Administrative Directive about
administration of waste landfills
Landfill permits requisites -According to the Directive there are 9 municipal waste landfills (nonhazardous)
Landfill fees
Tariffs for acceptance of waste in landfills are determined by the Regulatory Office for Water and
Waste (according to this the average price is 7 Euro/tonne
5
Waste Incineration Directive
•Transposition of Waste Incineration Directive
Has been transposed
•Number of incineration and co-incineration plants
4(four) incinerator plants
•No. of permits issued
3 (three) environmental consents have been issued for three
incinerator plants
•Emission Limit Values
There is no Monitoring of EVL
6
Thank you for your attention !
www.mmph.org
7