Pallatana-Bongaigaon
Transmission System
Generation Project Summary
 Pallatana (726.6 MW) : being implemented by OTPC
– Unit - 1 : Dec-2011
– Unit - 2 : March-2012
 Bongaigaon (750 MW) : being implemented by NTPC
– Unit - 1 : July-2012
 Beneficiaries
– Constituents of North Eastern Region
2
Pallatana - Bongaigaon Transmission System
 Trans. System Under NETC (JV of OTPC, PG & NER States)
– Pallatana – Silchar – Bongaigaon 400kV D/c line
 Trans. System (Under POWERGRID)
– BTPS - Bongaigaon 400kV D/c line
– Silchar – Badarpur(PG) Sw. Stn. interconnecting 132kV D/c line
– Silchar – Srikona 132kV D/c
– Silchar – Hailakandi 132kV D/c
– Pallatana - Surajmaninagar 400kV D/c line (charged at 132kV)
– Silchar – P. K. Bari (TSECL) 400kV D/c line (charged at 132kV)
– Silchar – Melriat (New) 400kV D/c line (charged at 132kV)
– Melriat (New) – Melriat(Mizoram) interconnecting 132kV D/c line
– Silchar - Imphal(New) 400kV D/c line (charged at 132kV)
– LILO of Loktak- Imphal(PG) 132kV S/c line at Imphal(New)
– LILO of Kathalguri-Misa 400kV (op. at 220kV) S/c at New Mariani
3
Pallatana - Bongaigaon Transmission System

Trans. System (Under POWERGRID
-Contd.)
– Mariani(new)-Mokokchung (PG) 220kV D/c line
– Mokokchung (PG)-Mokokchung (Naga) 132kV D/c (Zebra
cond.)
– Pasighat – Roing 132kV S/c line (on D/c tower)
– Roing – Tezu 132kV S/c line (on D/c tower)
– Tezu – Namsai 132kV S/c line (on D/c tower)
– 2x200MVA, 400/132kV New S/s at Silchar
– 2x50MVA, 132/33kV New S/s at Melriat New (upgradable to
400kV)
– 2x50MVA, 132/33kV New S/s at Imphal New (upgradable to
400kV)
– 220kV New Switching S/s at Mariani
– 2x50MVA, 220/132kV New S/s at Mokokchung
– 2x15 MVA, 132/33kV New S/s at Roing
– 2x15 MVA, 132/33kV New S/s at Tezu
– 2x15 MVA, 132/33kV New S/s at Namsai
4
Pallatana - Bongaigaon Transmission System
(under scope of other agencies)

NTPC
–
400/220kV, 2x315MVA transformers at BTPS (NTPC) switchyard
–
220kV Connectivity between NTPC and AEGCL switchyard
–
2 nos. of 400kV line bays for BTPS – Bongaigaon 400kV D/c line

OTPC
–
–
–
–
–
400/132kV, 2x100MVA transformers at Pallatana switchyard
2 nos. of 400kV line bays for Pallatana-Silchar 400kV D/c line
2 nos. 132kV line bays for Pallatana-Surajmaninagar 132kV D/c (upgrad. to 400kV)
50MVAR line reactor in each ckt of Pallatana-Silchar 400kV D/c line at Pallatana end
80MVAR bus reactor at Pallatana Generation Switchyard.

Assam
–
2x315MVA, 400/220kV New Substation at Azara
–
LILO of Silchar-Bongaigaon 400kV D/c line at Azara
–
LILO of Agia-Guwahati 220kV D/c line at Azara
–
63MVAR line reactor in Silchar-Azara 400kV line at Azara end
–
63MVAR bus reactor at Azara

Meghalaya
–
LILO of one ckt of Silchar-Bongaigaon 400kV D/c line at Byrnihat
–
2x315MVA, 400/220kV New Substation at Byrnihat
–
50MVAR line reactor in Silchar-Byrnihat 400kV line at Byrnihat end
–
63MVAR bus reactor at Byrnihat

Tripura
–
2x50MVA, 132/33kV substation at Surajmaninagar (upgradable to 400kV)
–
Monarchak – Surajmaninagar 132kV D/c
–
Monarchak – Rabindranagar 132kV D/c
–
Surajmaninagar – P. K. Bari 400kV D/c to be charged at 132kV
–
132kV S/s at Rabindranagar
5
Transmission System for Pallatana & Bongaigaon TPS
400 kV
220 kV
132 kV
ARUNACHAL
PRADESH
JV Company
POWERGRID
REYING
Assam (AEGCL)
Meghalaya (MeSEB)
Tripura (TSECL)
ANINI
YINGKIONG
ALONG
SANGRAM
ROING
Ch
ar
ge
DAPORIJO
d
at
TEZU
CHAPAKHOWA
kV
33
PASIGHAT
ZIRO
RUPAI
NAMSAI
MAKUM(II)
NIGLOK
TINSUKIA
NEW DBGRH
MIAO
DIGBOI(III)
DIBRUGARH
LIKABALI
RANGANADI
ar
ge
SEPPA
Ch
arg
d
at
33
kV
at 3
3kV
KHUPI
GO
NAHAR
LAGUN
ITANAGAR
G
NAMRUP
ZEBRA
BIHPURIA(II)
BORNAGAR(II)
PATHSALA(II)
SALAKATI
GOSAIGAON
DEPOTA
BAGHTY
TITABOR(III)
GOLAGHAT
GOLAGHAT NEW(3)
DOYANG
SAMAGURI
SARUPATHAR(II)
WOKHA
DIPHU BOKAJAN
TUENSANG
KAMPUR(III)
DIMAPUR
LUMDING
G
IN
LONGPI
DIMAPUR
NEW KOHIMA
)
UMTREW
NAGALAND
MISA
NAGAON
G
IN
TR
(S
ASSAM
MOKOKCHUNG
(POWERGRID)
MOKOKCHUNG
JAKHALABANDHA
TEZPUR(N)(II)
DHING(II)
AMINGAON
)
kV
KAMALPUR SIPAJHAR
BTPS
/33
I
KOKRAJHAR
SISHUGRAM
20
G
P.BAZAR(II)
(2
(UG CABLE)
AZARA
KAHILIPARA
EN
AR
GMC AR
(STRINGING)
AG
KAMAKHYA
N
J.N
SONAPUR
AGIA
SARUSAJAI
BILASIPARA
DISPUR
GAURIPUR
CHANDRAPUR
MATIA
JAGIROAD
MIRZA(II)
BOKO
DARANGGIRI(III)
TULI
MARIANI
BOKAKHAT
B.CHARIALI NER PP
ROWTA
RANGIA
NAZIRA
MARIANI (New)
JORHAT(W)
GOHPUR
JORHAT
NALBARI
DHALIGAON
BARPETA(II) HAJO(II)
KHONSA
LAKWA
NORTH
LAKHIMPUR
MAJULI
BORGONG(II)
EPIP-I
EPIP-II
PFUTSERO
MELURI
BAITHALANGSHU(II)
KIPHIRE
LANKA
NONGPOH
KOHIMA
SONPUR(II)
UMIAM-I
KYRDEMKULAI
TURA
SHILLONG
NEHU
UMRANGSO
JOWAI
NANGAL
BIBRA
KOPILI
KHANDONG
MAWNGAP
AMPATI
132k
V
(SHILLONG-PG)
MEGHALAYA
KHLIEHRIAT
CHERRAPUNJI
KARONG
400k
V at
UMIAM-4
BYRNIHAT
KHLIEHRIAT
MANIPUR
KALAIN(III)
UKHRUL
HAFLONG
IMPHAL
(PG)
YUREMBAM
SRIKONA
400kV at
PANCHGRAM
SILCHAR
BADARPUR
PILAPOOL
KARIMGUNJ(II)
HAILAKANDI
DULLABCHERA
V
at
400k
V
V
at
V
2k
13
IMPHAL
(New)
YAINGANGPOKPI
NING
0k
40
JIRIBAM
LOKTAK
400kV
kV
at 132
DHARMNAGAR
CHURACHANDPUR
CHANDEL
400k
V
KAILASHAHAR
KONGBA
KAKCHING
V
2k
13
0k
40
PURBA
KANCHANBARI
at 13
2kV
132kV
at 13
2kV
SILIGURI
BIRPARA
ALIPURDUAR
DHEKIAJULI(II)
SIBSAGAR
SONARI
SONABIL
TANGLA(II)
CHANGLANG
DEOMALI
DHEMAJI
TEOK(II)
BALIPARA
BALIPARA(I)
MARGHERITA
KATHALGURI
SILAPATHAR
H
UK
AM
NIRJULI
NECHIPHU
BONGAIGAON
BORDUBI
MORAN
GERUKAMUKH
ed
KAMENG
BHALUKPONG
JAIRAMPUR
JONAI
ZEBRA
TAWANG
(LHAO) C
h
LOWER
SUBANSIRI
KAMALPUR
400kV
kV
at 132
KUMARGHAT
BODHJUNG
MUNU
KHOWAI
AMBASSA
HAIZAMARA
JIRANIA
AGARTALA
GBPP
BARAMURA
KOLASIB
SURYAMANINAGAR
AGARTALA
AGAR-NEW
UDAIPUR
ROKHIA
MELRIAT
MONARCHAK
RABINDRANAGAR
Luangmual
ZEMABAWK
KHAWZAWL
BAGAFA
SAITUAL
W.PHAILENG
CHAMPAI
TRIPURA
at
ged
char
BELONIA
AIZWAL(PG)
MELRIAT
(NEW)
charged at 132kV
PALLATANA
66kV
MIZORAM
SERCHIP
SABROOM
MARPARA
E. LUNGDARE
LUNGLEI
CHARGED AT 33 KV, TO BE CHARGED AT 132KV
LUNGSEN
LUWNGTLAI
TLABUNG
SAIHA
6
ARUNACHAL
PRADESH
Pallatana- Bongaigaon Transmission System
(Under the Scope of POWERGRID)
REYING
d
ge
ar
Ch
TAWANG
(LHAO) C
ha
rg
ed
at
LOWER
SUBANSIRI
LIKABALI
RANGANADI
NAHAR
LAGUN
ITANAGAR
DEOMALI
ZEBRA
NAMRUP
TEOK(II)
NORTH
LAKHIMPUR
NAZIRA
MARIANI (New)
TULI
P.BAZAR(II)
(UG CABLE)
KAMAKHYA
CHANDRAPUR
MATIA
KYRDEMKULAI
SHILLONG
(Mawlai)
t
.a
(4
kV
LANKA
BYRNIHAT
(Killing)
JALUKI
KIPHIRE
KOHIMA
PEREN
UMRANGSO
MARAM
op
NEHU
KOPILI
KHANDONG
SHILONG-NEW
NONGSTOIN
NEW KOHIMA
PFUTSERO
MELURI
KHLIEHRIAT
MAWNGAP
ISHAMATI
MYNKRE
CHERRAPUNJI
KARONG
132k
V
JOWAI
KHLIEHRIAT
TAMENGLONG
MANIPUR
KALAIN(III)
Gamphjol
UKHRUL
(Keithelmanbi)
IMPHAL(New)
HAFLONG
SRIKONA
PANCHGRAM
SILCHAR
BADARPUR
PILAPOOL
KARIMGUNJ(II)
HAILAKANDI
DULLABCHERA
V at
132k
V
at
IMPHAL(PG)
V
2k
13
RENGPANG
KONGBA
THOUBAL
NING
MOREH
KAKCHING
LOKTAK
CHURACHANDPUR
KAILASHAHAR
TIPAIMUKH
P.K.BARI
132k
V
CHANDEL
V at
KUMARGHAT
MONU
BADARGHAT
V
JIRIBAM
KAMALPUR
AGBPP
JIRANIA
BODHJUNG NAGAR
AGARTALA
40
(POWERGRID)
DHARMNAGAR
KHOWAI
HAIZAMARA
0k
BADARPUR JIRIBAM(MANIPUR)
400k
YAINGANGPOKPI
YUREMBAM
400k
AMPATI
MEGHALAYA
00
V)
0k
22
DIMAPUR
(PG)
LUMDING
BAITHALANGSHU(II)
V at
UMIAM-4
NANGAL
BIBRA
GANOL
EPIP-I
EPIP-II
UMT-NEW
NONGPOH
UMIAM-I
SONPUR(II)
MENDIPATHAR
)
G
IN
G
LONGPI
UMTREW
TURA
(Rongkhom)
DIMAPUR
IN
BOKO
ASSAM
NAGALAND
TUENSANG
KAMPUR(III)
JAGIROAD
TR
(S
MIRZA(II)
DARANGGIRI(III)
WOKHA
MISA
DIPHU BOKAJAN
SONAPUR
NAGAON
DISPUR
GAURIPUR
DOYANG
SAMAGURI
SARUPATHAR(II)
SARUSAJAI
(POWERGRID)
MOKOKCHUNG
GOLAGHAT
GOLAGHAT NEW(3)
TEZPUR(N)(II)
DHING(II)
AMINGAON
V)
KAMALPUR SIPAJHAR 33k
/
I
SISHUGRAM
20
G
(2
KAHILIPARA
EN
AR
GMC AR
G
A
N
J.N
33kV
AGIA
BILASIPARA
TITABOR(III)
JAKHALABANDHA
66kV op at
(STRINGING)
DEPOTA
MOKOKCHUNG
AMBASSA
KOLASIB
TELIAMARA
BARAMURA
GOKULNAGAR
ROKHIA
UDAIPUR
PALLATANA
MONARCHAK
AIZWAL(PG)
MELRIAT
SURYAMANI
(NEW)
UDAIPUR
Luangmual
NAGAR
GUMTI
MELRIAT
ZEMABAWK
7
KHAWZAWL
RABINDRANAGAR
(SONAMURA)
BAGAFA
rg
cha
BELONIA
132kV
BTPS
ZEBRA
BAGHTY
400k
AZARA
KOKRAJHAR
ROWTA
MARIANI
BOKAKHAT
B.CHARIALI NER PP
400kV at
SILIGURI
BIRPARA
ALIPURDUAR
BALIPARA(I)
DHEKIAJULI(II)
JORHAT(W)
JORHAT
BORGONG(II)
SONABIL
TANGLA(II)
HAJO(II) NALBARI
DHALIGAON
BARPETA(II)
KHONSA
SONARI
LAKWA
NORTH
LAKHIMPUR
MAJULI
BIHPURIA(II)
SALAKATI
KATHALGURI
CHANGLANG
SIBSAGAR
NIRJULI
GOHPUR
GOSAIGAON
BORDUBI MARGHERITA
SILAPATHAR
KH
MU
GA
GO
DHEMAJI
BALIPARA
BORNAGAR(II)
PATHSALA(II)
RANGIA
JONAI
JAIRAMPUR
MORAN
GERUKAMUKH
NECHIPHU
BONGAIGAON
MIAO
DIGBOI(III)
DIBRUGARH
t 33
kV
KHUPI
NAMSAI
RUPAI
TINSUKIA
NEW DBGRH
ed
a
BHALUKPONG
MAKUM(II)
NIGLOK
KAMENG
33
kV
TEZU
CHAPAKHOWA
ZIRO
SEPPA
Cha
rg
BOMDILA
ROING
PASIGHAT
DAPORIJO
kV
33
at
kV
kV (Charged at 132 kV)
kV
kV
YINGKIONG
ALONG
SANGRAM
400
400
220
132
ANINI
ed
TRIPURA
W.PHAILENG
SAITUAL
CHAMPAI
Minimum Trans. System required with 1st unit of Pallatana
 Trans. System Under NETC (JV of OTPC, PG & NER
States)
– Pallatana - Silchar 400kV D/c line
 Trans. System (Under POWERGRID)
– Pallatana - Silchar 400kV D/c line
– 2x200 MVA, 400/132kV new S/s at Silchar
– Silchar - Badarpur(PG) 132kV D/c line
– Silchar - Srikona (Assam) 132kV D/c line
– Silchar - Hailakandi(Assam) 132kV D/c line with
LILO of Panchgram-Dullabhchera 132kV S/c line of
AEGCL to connected it with Silchar-Hailakandi
132kV D/c line so as to form Silchar - Panchgram
and Pallatana - Silchar 132kV lines (as agreed in
NERPC)
8
Trans. System likely to be commissioned with 2nd unit of
Pallatana (scheduled in March-2012)
 Trans. System Under NETC (JV of OTPC, PG & NER States)
– Silchar - Bongaigaon 400kV D/c line
 Trans. System (Under POWERGRID)
–
–
Pallatana - Surajmaninagar 400kV D/c line (to be operated at 132kV)
Surajmaninagar – P. K. Bari 400kV D/c to be charged at 132kV
 Trans. System (Under OTPC)
–
2x100 MVA, 400/132kV ICT at Pallatana
 Trans. System (Under Tripura Scope)
–
2x50MVA, 132/33kV substation at Surajmaninagar (upgradable to
400kV)
 Trans. System (Under Meghalaya Scope)
–
2x315MVA, 400/220kV substation at Byrnihat alongwith LILO of one
ckt. of Silchar – Bongaigaon 400kV D/c line
Note : In absence of Byrnihat S/s, upto 500 MW can be evacuated
through Silchar (2x200 MVA) and Pallatana (2x100 MVA) ICTs
9
Major Concerns
 Construction of new S/s at Surajmaninagar (Tripura)
–
–
–
Pallatana – Surajmaninagar 132kV D/c being constructed by
POWERGRID to provide alternate path for evacuation as well
as anticipated to be used for start-up power
New 2x50 MVA, 132/33kV S/s at Surajmaninagar required for
termination of Pallatana – Surajmaninagar 132kV D/c
Awarded by Tripura, needs to be expedited.
 Construction of new 400kV S/s at Byrnihat (Meghalaya)
–
–
–
–
2x315 MVA, 400/220kV S/s at Byrnihat to established by LILO
of one circuit of Silchar – Bongaigaon 400kV D/c line
Critical for smooth operation of 408 kms long Silchar –
Bongaigaon 400kV section
MeSEB signed agreement with POWERGRID for construction
of Byrnihat S/s as consultancy works
Scheduled to be completed in 30-36 months provided all
formalities like release of payment, hand over of land etc. are
completed at the earliest, which are still awaited
10
Major Concerns
 Construction of new 400kV S/s at Azara (Assam)
–
–
–
2x315 MVA, 400/220kV S/s at Azara to established by LILO of
Silchar - Bongaigaon 400kV D/c line
Critical for smooth operation of 408 kms long Silchar –
Bongaigaon 400kV section
Activities for construction yet to be started by Assam
 Strengthening beyond Bongaigaon
–
–
–
–
NER may have surplus during off-peak period (even though
entire power from Pallatana & Bongaigaon have been
allocated to NER states
Strengthening beyond Bongaigaon needs to be implemented
promptly for reliable transfer of power
POWERGRID is implementing re-conductoring of SiliguriPurnea 400kV D/c line, expected to be completed by March,
2012
Bongaigaon – Siliguri & Purnea – Biharsharif 400kV D/c lines
are being implemented under private sector and have been
awarded to M/s Sterlite. Implementation of the same needs to
11
be expedited
12