Transcript Slide 1
WELCOME PRESENTATION ON IDENTIFICATION OF POTENTIAL WATERWAYS IN NORTH EAST INDIA Made by RITES India Ltd in IWT meeting at Guwahati in November, 2011 SEQUENCE OF PRESENTATION • • • • • • • • • • MAP OF POTENTIAL WATERWAYS IN THE NORTH EAST STATES MAP OF RIVER BARAK GRID SYSTEM POTENTIAL WATERWAYS IN TRIPURA POTENTIAL WATERWAYS IN MEGHALAYA POTENTIAL WATERWAYS IN MIZORAM POTENTIAL WATERWAYS IN MANIPUR MAP OF RIVER BRAHMAPUTRA GRID SYSTEM POTENTIAL WATERWAYS IN ARUNACHAL PRADESH POTENTIAL WATERWAYS IN NAGALAND POTENTIAL WATERWAYS IN ASSAM Potential Waterways in North East States INDIA CHINA (TIBET) ARUNACHAL PRADESH SIKKIM Jia Bharali BHUTAN Subansiri NEPAL SADIYA Buri Dihing Brahmaputra R DHUBRI Brahmaputra ASSAM MEGHALAYA Protocol Route KARIMGANJ Barak MANIPUR LAKHIPUR MYANMAR Ashuganj TRIPURA Loktak Lake DHAKA MIZORAM WEST BENGAL BANGLADESH KOLKATA • Barak River Grid System • Brahmaputra River Grid System Sizu Mines Barak River Grid System MEGHALAYA Mawet Gasuapara LCS Baghmara LCS Nungba Ranikor Barak Lakhipur MANIPUR Protocol Route Ashuganj Karimganj Tlangkhang Protocol Route Zirania DHAKA Rajiv Nagar MIZORAM Udaipur Sonamura Dapchhuah Tlabung DEMAGIRI Tuichawng LCS Delta Area Chittagong Kawrpuichhuah KOLKATA Silchar Tipaimukh TRIPURA Tut BANGLADESH Loktak Lake POTENTIAL WATERWAYS IN TRIPURA Haora 28 km River Start End Length (km) Gumti Maharani Barrage Sonamura 54 Hoara Zirania Joynagar 28 Salient Features of Rivers of Tripura River Start End Length Capacity Draft Navigability (km) (tons) (m) Period Commodity Gumti Maharani Barrage Sonamura 54 2-5 0.6 6 months (monsoon period) Border trade and local cargo Hoara Zirania Joynagar 28 2-5 0.6 6 months (monsoon period) Border trade and local cargo A View of River Gumti at Udaipur A View of River Haora at Agartala Ashuganj Port in Bangladesh on Unloading of Heavy Equipment of the Banks of Meghana River ONGC Power Plant MOVEMENT OF OVER DIMENSIONED CARGO BY ROAD FROM ASHUGANJ PORT IN BANGLADESH TO PALTANA (TRIPURA) - ONGC POWER PLANT POTENTIAL WATERWAYS IN MEGHALAYA Simsang Kynshi River Start End Length (km) Kynshi / Jadukota Borsora / Ranikor Mawet 35 Simsang Baghmara Siju 35 Jingiram Phulbari Dhubri 20 Salient Features of Rivers of Meghalaya River Start End Length (km) Kynshi / Jadukota Borsora / Ranikor Mawet 35 Capacity (tons) Draft (m) Navigability Period Commodity 50 (lean) 2 -10 (lean) Lean coal / limestone / boulders 5 -15 (flood) Flood 10 - 15 (lean) 0.3-0.6 (lean) Lean 50 – 100 (flood) 3 – 4 (flood) Flood 10 (lean) 100 -200 (flood) 0.5 Lean 10 Flood 100 (flood) Simsang Jingiram Baghmara Phulbari Siju Dhubri 35 20 coal / limestone / boulders Ferry service and local cargo View of River Simsang towards Siju mines Simsang/Someshwari River in Netrakona district of Bangladesh View of the River Kynshi / Jadukota at Ranikor Ghat View of River Kynshi upstream of Road Bridge at Ranikor Barges at Phulbari Terminal in River Jingiram POTENTIAL WATERWAYS IN MIZORAM swa hale R. D ri 0 10 20 30 40 50 Km River Start End Length (km) Karnafuli / Khawthlan gtuipui Tlabung Rajiv Nagar 180 Tuichawng Kawrpuic hhuah Tuichawng 135 Tut Dapchhhu Tlangkhang (Tlawng / ah Dhaleswari) 55 ASSAM Bairabi MANIPUR R. Tlawng AIZAWL Tlabung R. Tuipai ng R. Tuicha Tuichawng TLABUNG Tuichawng LUNGLEI KAWRPUICHHUAH Kawrpuichhuah i ipu mtu hhi C R. m t u i p ui hhi R. C Tuichwang R. Mengpui BANGLADESH MYANMAR i imtuipu R. Chh R ic . Tu R. Karnafuli ng haw ng ua air Ph R. DEMAGIRI RANGMATI R. Mat R. De R .K R. Kau uip ngr u MIZORAM thla haw Khawthlangtuipui R. Tiau Rajiv Nagar R. Tuivawl SAIRANG DAPCHHUAH R. Tuirini R. Tut R. Langkain TRIPU RA MAMIT R. Tuir TLANGKHANG ial Tlangkhang T u t Dapchhhuah Rajiv Nagar AIZAWL R. Tuivai R. Serlui BAIRABI Potential Waterways Map of Rivers in Mizoram R. Tuichawng R. Khawthlangruipu R. Tut Salient Features of Rivers of Mizoram River Start End Length Capacity (km) (tons) Draft (m) Navigability Period Commodity Karnafuli / Khawthlan gtuipui Tlabung Rajiv Nagar 180 2-5 0.6 6 months (monsoon period) Border trade and local cargo Tuichawng Kawrpuic hhuah Tuichawng 135 2-5 0.6 6 months (monsoon period) Ferry service and local cargo Tut Dapchhhu Tlangkhang (Tlawng / ah Dhaleswari) 55 2-5 0.6 6 months (monsoon period) Ferry service and local cargo Ferry Ghat on River Karnafuli at Demagiri in India IWT Vessels on Karnafuli River at Chittagong POTENTIAL WATERWAYS IN MANIPUR Nungba Tipaimukh River Start End Length (km) Barak Extension Nungba Tipaimukh 60 Loktak lake Ferry services 110 Salient Features of Rivers of Manipur River Start End Length (km) Capacity (tons) Draft (m) Navigability Period Commodity Barak Extension Nungba Tipaimukh 60 10 – 15 0.8 6 months (monsoon period) Local cargo 110 2-5 0.8 Round the year Passengers and local cargo Loktak lake Ferry services Ferry Point at Loktak Lake – Karang Island A view of River Barak near Nungba town Brahmaputra River Grid System CHINA (TIBET) Anupam Pasighat Parasuramkund HEP Gerukamukh Brahmaputra Joyapur Naginimara ASSAM Numaligarh 92 Jia Bharali Dikhow Bhalukpung Yangnyu Jagibhaktagaon MEGHALAYA Samjuran BANGLADESH MYANMAR Waterways in Arunachal Pradesh Dibang Anupam Brahmaputra confluence 90 Lohit Parasuramkund Brahmaputra confluence 100 Siang Pasighat 50 Subansiri Gerukamukh Brahmaputra confluence Brahmaputra confluence Ferry services on River Dibang • Anupam to Anupam circuitus route (80 km) • Malek to Bomjur (10 km) •Bizari to Jial (10km) 111 Bomjur Malek Bizari Jial Anupam Pasighat Komilaghat Sika Bamin HEP Sadiya HEP Gerukamukh 111 Ferry services on River Siang • Sika bamin to Namsing • At Komilaghat HEP Ferry services on River Lohit • Saikhowa Ghat to Parasuramkund (75 km) • Tezu to Medo • Digaru to Alubari • Shivaji Nagar to Tezugham FERRY SERVICE IN SIANG RIVER Pasighat Anupam • SUBANSIRI Salient Features of Rivers of Arunachal Pradesh River Start End Length (km) Capacity (tons) Draft (m) Navigability Period Commodity Dibang 40 km upstream of proposed Dibang Power project 50 km downstream of the dam 90 300 1.2 Round the year Construction material for proposed power projects and local cargo Lohit Parasuramkund Brahmaputra confluence 100 300 1.2 Round the year Construction material for proposed power projects and local cargo Siang Pasighat Brahmaputra confluence 50 200 1.2 Round the year Ferry services for local cargo / passengers Subansiri Gerukamukh Brahmaputra confluence 111 200 1.0 6 to 8 months Ferry services for local cargo / passengers and Construction material POTENTIAL WATERWAYS IN NAGALAND Naginimara Numaligarh Yangnyu River Start End Length (km) Dhansiri Samjuran Numaligarh 110 Dikhu / Dikhow Yangnyu Naginimara 52 Samjuran Salient Features of Rivers of Nagaland River Start End Length Capacity (km) (tons) Dhansiri Samjuran Numaligarh 110 Dikhu / Dikhow Yangnyu Naginimara 52 Draft (m) Navigability Period Commodity 10-15 0.8 6 months (monsoon period) Minerals, cement, local cargo 10-15 0.8 6 months (monsoon period) Minerals, cement, local cargo POTENTIAL WATERWAYS IN ASSAM Joyapur 40 Bhalukpung 52 Jia Bharali NW1 PROTOCOL ROUTE Numaligarh Yangnyu Jagibhaktagaon Samjuran PROTOCOL ROUTE BARAK Bairabi NAGALAND • • • • • • • Dhaleswari / Katakhal Jia Bharali Buri Dihing Disang Dikhow Dhansiri Kopili Salient Features of Rivers of Assam River Start End Length (km) capacity (tons) Draft (m) Navigability Period Cargo Potential Dhaleswari / Katakhal Bairabi Barak confluence (Katakhal) 125 10 (Katakhal) 0.6 6 months (Flood season) Food grain, fertilizer, iron, steel, cement Jia Bharali Bhalukp ung Brahmaputra confluence 60 200 1.0 6 to 8 months Local cargo / passengers and Construction materials Buri Dihing Joyapur Brahmaputra confluence 80 200 1.2 8 to 10 months Industrial cargo, ferry services Salient Features of Rivers of Assam River Kopili Start End Jagibhakta Brahmaputra gaon confluence Length (km) capacity (tons) Draft (m) Navigability Period Cargo Potential 50 100 0.8 6 to 8 months (Flood season) Industrial cargo, ferry services Disang NH 37 crossing Brahmaputra confluence 25 100 0.8 6 to 8 months (Flood season) Industrial cargo, ferry services Dikhow Sibsagar Brahmaputra confluence 40 100 0.8 6 to 8 months (Flood season) Industrial cargo, ferry services Dhansiri Numali garh Brahmaputra confluence 25 100 1.0 6 to 8 months (Flood season) Industrial cargo, ferry services River Dikhow near Sibsagar River Dhaleswari / Tlawng at Sairang