As on 27.06.2012 - Ministry of Development of North Eastern Region

Download Report

Transcript As on 27.06.2012 - Ministry of Development of North Eastern Region

PRESENTATION
ON
ACTION PLAN OF NORTH EASTERN
STATES IN RESPECT OF MINISTRY
OF ROAD TRANSPORT AND
HIGHWAYS
1
NATIONAL HIGHWAYS IN NORTH EASTERN
REGION AT A GLANCE
• North Eastern States comprise Arunachal Pradesh, Assam,
Manipur, Meghalaya, Mizoram, Nagaland, Sikkim and Tripura.
2
State wise National Highways and
length
• Arunachal Pradesh : 52, 52A, 153, 229, 52B Ext, 37 Ext. &
315A. [2027 km]
• Assam : 31, 31B, 31C, 36, 37, 37A, 38, 39, 44, 51, 52, 52A, 52B,
53, 54, 61, 62, 127B, 151,152, 153, 154 & 315A [2940 km]
• Manipur : 39, 53, 102A, 102B, 137, 150 & 155 [1317 km]
• Meghalaya : 40, 44, 51, 62 & 127B [1171 km]
• Mizoram : 44A, 54, 54A, 54B, 150, 154& 502A [1027 km]
• Nagaland : 36, 39, 61, 150 & 155 [494 km]
• Sikkim : 31A & 310 [149 km]
• Tripura : 44, 44A [400 km]
3
Comparison with National
Average
• TOTAL NH LENGTH • IN NE STATES
-
76818 KM
9525 KM (12.40%)
ALL INDIA NE REGION
• Length (km) /
1000 sq km
• Length (km) /
lakh population
23.4
38.82
7.5
60.54
4
Major Road Development Programme in
NE Region
• NHDP-II (East-West Corridor)
• NHDP-III
• Special Accelerated Road Development
Programme in North East (SARDP-NE)
– Phase ‘A’
– Arunachal Pradesh Package of Roads and
Highways
– Phase ‘B’ (approved for DPR preparation only)
5
Major Road Development
Programs in North East Region
Jorging
Bishing
Pango
Jido
Anini
ARUNACHAL
PRADESH
Singa
Migging
Sarkam Point
CHINA
Tato
Yingkiong
Bile
CHINA
52
Taliha
GANGTOK
Namchi
Melli
Sivoke
Silliguri
Bagdogra
Seppa
Menla
Jaldhaka
31
Chalsa
52A
Udalguri
31C
WEST
BENGAL Srirampur
Rowta
52
Kokrajhar
Barpeta
31B
Goalpara
Boxirhat
Chaigaon
Dudhnai Boko
Paikan
31
Morigaon
37
Jorabat
MEGHALAYA
Tura
51
40
62
Williamnagar
Baghmara
Mawthabah
ASSAM
54
36
Lumding
Shillong
Bypass
44E
40
61
NAGALAND
Phek
155
150
Athibung
Khelema
`
KOHIMA
Zhamai
Maram
150
Ukhrul
39
44
40
Tuensang
Zunheboto
Dimapur
Haflong
Wakhaji
Shankshak
Tamenglong
Yaingpokpi
Dalu
62
53
151
SHILLONG
Km 10 – 18
of NH 154
BANGLADESH
53
39
150
54
154
Kukital
Jiribam
Silchar
Bypass
Palel
Tengnoupal
Km 95 – 118 of
NH 54
Kailasahar
Chandel
150
44
Seling
44A
IMPHAL
Moreh
LEGEND :-
Kumarghat
Manu
AGARTALA
MYANMAR
MANIPUR
Silchar
Badarpur
153
Changlang
Khonsa
Longleng
Peren
54
Jowai
Bypass
Nongstoin
Pangsu Pass
Panchao
Wokha
39
Daboka
Vijaynagar
Namchik
38
155
Mokokchung
Diphu
Barapani
Mawshynrut
36
Nagaon
36
37
Dhubri
Silghat
37
Baihata
Charali
52B
Mon
Golaghat
Numaligarh
37A
`
153
52B
61
Merangkong
Tezpur
Baska
152
Kanubari
Jhanji
52
Balipara
31A
Bimlapur
37
52
52A
GUWAHATI
Rangpo
Dibrugarh
Bypass
North
Lakhimpur
Hoj
Yupia
NATHULA
Ranipul
Singtam
Naya Bazar
52B
Potin
Tashigaon
Mahadevpur
Bogibeel bridge
with NHAI
Makum
Akajan
52
Ziro
Nechipu
BHUTAN
Sadia
Dhola
229
Lumla Tawang
Hawai
37
Jonai
Pahumara
Mangan
Gyalshing
229
Daporijo
Koloriang
Roing
Pasighat
Bame
ITANAGAR
SIKKIM
Pangin
Along
AIZAWL
Champai
TRIPURA
54
44
MIZORAM
1. Arunachal Package
2. SARDP NE, Phase- A
3. SARDP NE, Phase- B
4. East West Corridor
5. NHDP III
5. NH/Roads
6. Completed stretches)
(In-Progress under SARDP-NE )
AIZAWL
54B Theriat
Sabroom
Lunglei
NH Network
Demagiri
54
Road serving Kaladan
Project
54A
Saiha
Tuipang
with PWD
with BRO
NH yet to be Entrusted
NHAI
7
Projects Taken up by NHAI in NE States
Programme
Length(km)
Cost (Rs. Crore)
NHDP (Phase-II)
East West Corridor
670
6000
NHDP (Phase-III)
on BOT(Toll) Basis
110
400
(SARDP-NE)
On BOT (Annuity) basis
394
3945
Total
1182 Km
10345
BRIEF ON EAST WEST CORRIDOR
PROJECTS IN ASSAM
Total length in Assam
= 670 km
Starts from Silchar (km 306.25 of NH-54) and ends at
Assam/West Bengal Border (km 0 of NH-31C) Srirampur
Passes through Silchar, Maibong, Lumding, Daboka, Nagaon,
Sonapur, Guwahati, Nalbari and Bijni
Four laning completed
= 18 km (Guwahati Bypass)
To be awarded after completion of
2 laning by State PWD (progress 70%) =
31 km
 Under Implementation
= 621 km
Status of Four Laning Works on EW corridor
Under Implementation
4-laned completed up to March, 10
= 621 km
(26 packages)
= 126.0 Km
4-lane completed in the year 2010-11
=
4-lane completed in the year 2011-12
= 104.0 Km
4-lane completed in the year 2012-13
=
4.46 Km
Total 4-laning completed up to May, 12
=
394.46km
Balance length
= 226.54 Km
Target for the year 2012-13
= 104 Km
Target for the year 2013-14
= 122.54 Km
160.0 Km
Continued
• The stretch of 31 km from Balachera to Herangajo is being
widened from single lane to two lanes by the State PWD.
Clearance for Borail Wild Life and Borail Reserve forest is
awaited. Four laning would be done after completion of two
lane by PWD, Assam.
• Most of the contracts were awarded in November/December
2005.
• All the contractors had mobilized to site and works are in
progress except in 5 contract packages in NC Hills district
where the work has been stopped by the previous contractors
since April’2008 due to non-handing over of encumbrance
free site and law & order situation. All the five civil packages
of NC Hills district had been foreclosed and re-awarded.
• Entire East West Corridor is targeted for completion by March,
2013 except the five packages of NC Hills district re-awarded
for the balance work targeted for completion March, 2014.
Status of NHDP (III) Projects in Meghalaya
State
Meghalaya
NH
44
Total
Stretch
Length
(km)
Cost for 2laning
(Rs. crore)
JowaiMeghalaya/
Assam Border
(Ratachhera)
102
390.7
102
390.7
Remarks
Work awarded on
20th March, 2012 to
M/s
Simplex
Infrastructure Pvt.
Ltd., Kolkatta and
concession
agreement signed on
05.06.2012.
14
Status of SARDP – NE Projects on BOT (Annuity)
Stretch
NH
Length
(km)
TPC
(Rs. Cr.)
Present status
JorabatBarapani
40
62
536
Shillong Bypass
40
44
50
226
Financial closure achieved on
12.01.11. Physical Progress of
about 39.56% achieved so far.
Financial closure achieved on
07.02.11 . Physical Progress
of about 50% achieved so
far.
Jorhat – Demow
37
81
889
RFQ re-invited on 08.06.2012
Demow –
Dibrugarh
37
46
536.29
RFQ re-invited on 08.06.2012
Numaligarh –
Jorhat
37
51
659.47
RFQ re-invited on 08.06.2012
Dimapur Kohima
39
81
902
RFQ will be invited by July,
2012
SPECIAL ACCELERATED
ROAD DEVELOPMENT
PROGRAMME IN NORTH
EAST (SARDP-NE)
16
Objectives of SARDP-NE
• Upgrade National Highways connecting State Capitals to
2/ 4 lane;
• To provide connectivity of all 88 District Headquarter
towns of NER by at least 2-lane road;
• Provide road connectivity to backward and remote areas
of NE region to boost socio - economic development;
• Improve roads of strategic importance in border area;
• Improve connectivity to neighboring countries
17
SARDP-NE at a Glance
Phase ‘A’
(EPC component)
Phase ‘A’
(roads approved ‘in-principle’)
-
3213 km (Rs 12821 cr)
-
886 km ( Rs 8948 cr)
Total Phase ‘A’
-
4099 km (Rs 21769 cr)
Arunachal Pradesh Package as
per Cabinet decision dt 9.1.2009
-
2319 km (Rs 11919 cr)
Total Phase ‘A’ & Arunachal
Package
-
6418 km (Rs 33688cr)
Phase ‘B’
-
3723 km (Rs. 64 crore approved for
DPR preparation only)
Total of SARDP-NE
-
10141 km (Rs. 33752 cr)
(NH 4798km (47%), SR (5343km(53%))
18
State-wise road length distribution
under SARDP-NE
Length in km
STATE
SARDP-NE Phase 'A'
Arunachal Pradesh Package
of Roads and Highways
SARDP-NE Phase 'B'
Grand Total
NHs
SR/GS
Total
NH
SR/GS/
Strtg
Total
NH
SR/GS/
Strtg
Total
NH
SR/GS/
Strtg
Total
Arunachal
Pradesh
52
212
264
1346
835
2181
0
931
931
1398
1978
3376
Assam
1179
177
1356
126
12
138
0
285
285
1305
474
1779
Manipur
39
166
205
0
0
0
0
202
202
39
368
407
Meghalaya
259
526
785
0
0
0
161
201
362
420
727
1147
Mizoram
221
100
321
0
0
0
416
272
688
637
372
1009
Nagaland
81
350
431
0
0
0
622
169
791
703
519
1222
Sikkim
80
505
585
0
0
0
0
68
68
80
573
653
Tripura
130
22
152
0
0
0
86
310
396
216
332
548
Total
2041
2058
4099
1472
847
2319
1285
2438
3723
4798
5343
10141
SR: State Road; GS: General Staff roads & Strtg: Strategic roads
19
Progress of SARDP-NE
Phase ‘A’
Arunachal Package
Item
Hybrid BOT
(Annuity)
Total
1543km
3213 km
886 km *
4099 km
(Rs 12821 cr) (Rs 8948 cr) (Rs 21769 cr) (Rs 6808 cr)
776 km
(Rs 5111 cr)
776 km
(Rs 5111 cr)
558 km
2259 Km
2391 Km
132 Km
(Rs 9160 cr) (Rs 1026cr) (Rs 10186 cr) (Rs 2699 cr)
774 km
(Rs 5111 cr)
1332 km
(Rs 7810 cr)
Nil
40 km
EPC
Total Length (km)
Works sanction/
awarded
In principle
incl. BOT
Total
EPC
3723 km (Rs 17996 cr)
Roads completed
Target for completion
818 km
34 km
852 km
March, 2015 for ongoing works
40 km
June, 2016
* Out of 886 km NHAI is implementing 39 4 km on BOT(Annuity), MoRT&H 140 km on BOT(Annuity) & 347km on EPC
20
Performance of SARDP-NE
Sanctions/Awards
Year
Financial (Rs. Crore)
Length
completed
(km)
Allocation
Expenditure
Length (km)
Cost
(Rs. Crore)
2006-07
501
1285
Preliminary
550
450
2007-08
240
615
150
700
652
2008-09
187
835
290
1000
637
2009-10
188
1070
156
1200
676
2010-11
1615
9439
146
1500
1065
2011-12
992
4752
150
1950
1940
Total
3723
17996
892
6900
5420
21
Quarterly Targets for 2012-13 for SARDP-NE
including Arunachal Pradesh Package.
Q1
Physical Completion (km)
Sanction of
works
Cummulative Targets
Q2
Q3
Q4
0
12
135
300
Length (km)
146
509
799
1980
Amount
(Rs in crore)
607
3250
4912
11470
22
Statewise Targets for sanction during 2012-13
under SARDP-NE including Arunachal Pradesh
Package.
Sl.
No.
1
2
3
4
5
6
7
8
States
Length (km)
Arunachal Pradesh
Assam
Manipur
Meghalaya
Mizoram
Nagaland
Sikkim
Tripura
Total
952
263
58
387
0
0
190
130
1,980
Cost
(Rs. Crore)
5,461
2,244
240
2,306
0
0
829
390
11,470
23
Yingkiong
Roads covered for
improvement in
Arunachal Pradesh
under SARDP-NE
Aalong
Daporijo
Anini
GORGING
BISHING
Roing
JIDO
PONGO
Koloriang
Tezu
SINGA
MIGGING
SAKRAM POINT
LUNGTE
TATO
BILE
Seppa
MARIYUNG
PANGIN
Bomdila
Tawang
BAME
JONAI
229
LUMLA
Yupia
ZORAM
TASHIGAONG
Potin
AKAJAN
NORTH
LAKHIMPUR
CHOWKHAM
SADIA
52
DHOLA
MAHADEVPUR
RUPAI
52B
TINSUKIA
NAMCHIK
JAIRAMPUR
Lalpul
DIBRUGARH
PANGSU PASS
153
BIMLAPUR
Hoj
NECHIPU
37
Ext
229
PAKA
Being improved to 2 lane by
BRO under China Study
Group(CSG)
Koronu
Paya
TAHILA
Ziro
229
BOMJIR
52
SIBSAGAR
BANDER DEWA
ITANAGAR
52B
KANUBARI
52B
Changlang
HOLONGI
BALIPARA
GOHPUR
Pasighat
LEGEND :A. Roads under Arunachal Package
To Srirampur
NUMALIGARH
Khonsa
SILGHAT
Baihata
Charali
GUWAHATI
NAGAON
TO
SILCHAR
ROUTE OF 4 LANE CONNECTIVITY
OF ITANAGAR WITH EAST WEST
CORRIDOR AT NAGAON
Road stretches proposed on Annuity basis
B. Roads under Phase ‘A’
C. Roads under Phase ‘B’
Work in going on in stretch
Other National Highways
East West Corridor
DISTRICT HEADQUARTER TOWN
Hawai
Details of sanctions in the North Eastern States entrusted to
State PWDs under NH(O) in the last five years
States
2007-08
2008-09
2009-10
2010-11
2011-12
No.
Amount
(Rs. In
Crores)
No.
Amount
(Rs. In
Crores)
No.
Amount
(Rs. In
Crores)
No.
Amount
(Rs. In
Crores)
No.
Amount
(Rs. In
Crores)
Arunachal
Pradesh
Assam
0
0
1
4.78
0
0
0
0
0
0
16
112.12
16
215.12
17
292.06
3
79.88
3
430.65
Manipur
3
37.97
4
30.38
9
132.22
0
0
10
34.57
7
43.87
9
81.78
7
137.55
0
0
3
21.72
Mizoram
5
21.95
5
40.26
11
63.82
0
0
4
45.89
Nagaland
13
47.08
9
57.9
1
8.42
1
93.68
0
0
Sikkim
-
-
-
-
-
-
-
-
-
-
Tripura
-
-
-
-
-
-
-
-
-
-
4
173.56
20
532.83
Meghalaya
Total
44 262.99
44
430.22 45 634.07
25
Allotment and expenditure in the North Eastern States
entrusted to State PWDs under NH(O) in the last five years
(in Rs. Crore)
States
2007-08
2008-09
2009-10
2010-11
2011-12
Allotment
Expenditure
Allotment
Expenditure
Allotment
Expenditure
Allotment
Expenditure
Allotment
Expenditure
Arunachal
Pradesh
Assam
6.00
5.65
1.10
1.10
0.0
0.00
7.00
0.00
0.0
0.0
86.00
86.59
90.0
86.30
172.00
200.51
172.00
171.67
230.0
197.04
Manipur
12.00
10.24
23.65
23.65
19.65
19.65
55.00
64.08
78.00
47.09
22.00
22.33
50.00
50.77
60.00
64.08
65.00
79.08
83.50
82.76
Mizoram
15.00
15.00
19.00
13.55
28.00
5.42
43.00
24.22
60.00
40.81
Nagaland
12.00
10.20
30.62
30.62
40.00
31.68
47.00
26.94
54.00
19.63
Sikkim
-
-
-
-
-
-
-
-
-
-
Tripura
-
-
-
-
-
-
-
-
-
-
Megha-laya
Total
153 150.01 214.37 205.99 319.65 321.34
389
365.99 505.5 387.33
26
Targets for 2012-13 the North Eastern States entrusted to
State PWDs under NH(O)
States
Sanction of
projects
Allocation/
Expenditure
Physical targets
(Widening/strengthening
/IRQP)
(in km)
(Rs in cores)
(Rs in cores)
Arunachal Pradesh
21.00
6.00
6.00
Assam
Manipur
236.00
96.00
225.00
62.00
105.38
41.00
Meghalaya
Mizoram
230.00
286.00
101.77
107.00
65.00
62.00
Nagaland
193.00
85.00
21.00
Sikkim
-
-
-
Tripura
-
-
-
Total
1062 Cr.
586.77 Cr.
300.38 km.
27
ISSUES REQUIRING SUPPORT OF STATE
GOVT.
• Expedite completion of Land Acquisition and utility shifting
prior to award of the project so that land is free from
encumbrance and will in turn expedite completion of the
project.
• To expedite Environment and Forest clearance wherever
necessary.
• To enhance the capacity of the State PWDs at the Division
level for effective implementation and monitoring of the
projects.
28
29
Length of roads included under Phase ‘A’ and Arunachal Package of SARDP-NE.
State
Arunachal
Pradesh (NH =
1472 km)
Program
me
NH length identified under the programme with
various Agencies (km)
Non NH length identified under the programme
with various Agencies (km)
PWD
BRO
NHAI
M/O
RT&H
Total
PWD
BRO
NHAI
M/O
RT&H
Total
Phase ‘A’
52
0
0
0
52
0
212
0
0
212
264
Arunachal
Package
448
140
0
748
1336
185
660
0
0
845
2181
500
140
0
748
1388
185
872
0
0
1057
2445
Phase ‘A’
568
270
201
140
1179
177
0
0
0
177
1356
Arunachal
Package
98
0
0
28
126
0
12
0
0
12
138
666
270
201
168
1305
177
12
0
0
189
1494
0
39
0
0
39
0
174
0
0
174
213
112
64
259
526
0
0
0
526
785
Sub Total
Assam
(NH = 2942 km)
Sub Total
Manipur (NH =
966 km)
Phase ‘A’
Meghalaya (NH =
810 km)
Phase ‘A’
Mizoram (NH =
927 km)
Phase ‘A’
Nagaland (NH =
494 km)
Phase ‘A’
Sikkim (NH = 45
km*)
Phase ‘A’
Tripura (NH = 400
km)
Phase ‘A’
TOTAL
GRAND TOTAL
83
Grand
Total
199
22
0
0
221
100
0
0
0
100
321
0
0
81
0
81
342
0
0
0
342
423
8
72
0
0
80
199
306
0
0
505
585
0
130
0
0
130
0
22
0
0
22
152
Phase ‘A’
910
533
394
204
2041
1344
714
0
0
2058
4099
Arunachal
Package
546
140
0
776
1462
185
672
0
0
857
2319
1456
673
394
980
3503
1529
1386
0
0
2915
6418
* Out of 95km length of NH-31A, 80km is included under Phase A of SARDP-NE, 50km is in West Bengal and 30km is In Sikkim