19-04-0027-00-0000-july-2004-closing-report.ppt

Download Report

Transcript 19-04-0027-00-0000-july-2004-closing-report.ppt

July 2004
doc.: IEEE 802.19-04/0027r0
IEEE 802.19
Wireless Coexistence TAG
July 2004
Closing Report
Steve Shellhammer
[email protected]
Submission
Slide 1
Steve Shellhammer, Intel Corporation
July 2004
doc.: IEEE 802.19-04/0027r0
Proposed 802 Policies and Procedures for
Coexistence Assurance (1)
• Presented P&P changes at Sunday
Evening 802 Rules meeting
• Modified proposed changes based on
feedback from executive committee
• As requested, presented proposed 802
P&P changes to several wireless WGs
– 802.11
– 802.15
– 802.16
Submission
Slide 2
Steve Shellhammer, Intel Corporation
July 2004
doc.: IEEE 802.19-04/0027r0
Proposed 802 Policies and Procedures for
Coexistence Assurance (2)
• Motion at Friday closing EC meeting to
hold EC letter ballot on proposed P&P
changes. Motion passed 13/0/1
• Next step is to hold 30-day EC letter
ballot
• Then make necessary text changes in
response to EC letter ballot comments
• Motion at November Plenary to accept
802 P&P changes
Submission
Slide 3
Steve Shellhammer, Intel Corporation
July 2004
doc.: IEEE 802.19-04/0027r0
Coexistence Assurance Methodology
• First draft of Coexistence Assurance
(CA) methodology was presented.
Submission
Slide 4
Steve Shellhammer, Intel Corporation
July 2004
doc.: IEEE 802.19-04/0027r0
Liaisons
• Established liaisons with two of the
wireless working groups
• 802.11
– Colin Lanzl
• 802.15
– Tom Siep
• 802.16 is considering establishment of a
liaison with 802.19
Submission
Slide 5
Steve Shellhammer, Intel Corporation
July 2004
doc.: IEEE 802.19-04/0027r0
Plans for September
• Review comments from EC letter ballot
and make appropriate changes to the
text
• Additional submissions on CA
Methodology document
Submission
Slide 6
Steve Shellhammer, Intel Corporation