19-04-0024-00-0000-proposed-changes-to-802-p-and-p.ppt

Download Report

Transcript 19-04-0024-00-0000-proposed-changes-to-802-p-and-p.ppt

July 2004
doc.: IEEE 802.19-04/0024r0
IEEE 802.19
Wireless Coexistence TAG
Proposed Changes to 802
Policies and Procedures
Steve Shellhammer
[email protected]
Submission
Slide 1
Steve Shellhammer, Intel Corporation
July 2004
doc.: IEEE 802.19-04/0024r0
IEEE 802.19/04-0010r4
6.6 Coexistence
For a wireless project to be authorized, the WG is
required to produce a Coexistence Assurance (CA)
document to be submitted with their draft unless
there is a compelling reason to omit this step.
– Working Group will submit a CA document with the draft
– Working Group will not submit a CA document
If no CA document, state reason:
_________________________
Submission
Slide 2
Steve Shellhammer, Intel Corporation
July 2004
doc.: IEEE 802.19-04/0024r0
IEEE 802.19/04-0010r4
Procedure 11
PROCEDURE FOR APPROVAL TO FORWARD A
DRAFT WIRELESS STANDARD
In the process of preparing for Sponsor Ballot, the WG
shall provide the coexistence assurance (CA)
document to the 802.19 TAG no less than 60 days
prior to requesting that the LMSC SEC send the draft
to sponsor ballot. The LMSC recommends that the
WG provide the CA document to 802.19 prior to WG
letter ballot.
The TAG shall give its technical comments on the CA
document within 45 days after receipt.
The 802.19 TAG will evaluate if the CA methodology
was applied appropriately and reported correctly. The
LMSC shall make the final determination on whether
the coexistence necessary for the standard or
amendment, as defined by the WG, has been met.
Submission
Slide 3
Steve Shellhammer, Intel Corporation
July 2004
doc.: IEEE 802.19-04/0024r0
TAG Letter Ballot
• The 802.19 Coexistence TAG held a
letter ballot to submit proposed 802 P&P
changes (802.19/04-0010r4) to the
Executive Committee.
• The letter ballot was approved
unanimously
– Yes
– No
– Abstain
Submission
10
0
0
Slide 4
Steve Shellhammer, Intel Corporation
July 2004
doc.: IEEE 802.19-04/0024r0
Potential Changes
• Require CA document at WG letter
ballot, and updated CA document at
Sponsor Ballot
• Restrict requirement to standards in
unlicensed bands
• 802.19 TAG to offer its technical
recommendations
• Drop the Sixth Criteria
Submission
Slide 5
Steve Shellhammer, Intel Corporation
July 2004
doc.: IEEE 802.19-04/0024r0
Plan going Forward
• Meet one-on-one with EC members to
discuss their issues with proposed
changes
• Update document to address issues
• Potentially, make a motion on Friday to
hold a EC letter ballot on proposed P&P
changes.
Submission
Slide 6
Steve Shellhammer, Intel Corporation