Millennium Bridge
Group 12
Introduction


Opened 10th June 2000
Span 325m Suspension Bridge
What Happened and
Consequences



Swaying of up to
70mm
Panic and
discomfort
Bridge closed 12th
June 2000
Technical Factors
Contributing to the Disaster



Horizontal Forces
cause oscillation
Synchronous
Lateral Excitation
Accentuated
oscillation
Lessons To Be Learned
From the Disaster



Passive Damping
Viscous Dampers
and Tuned Mass
Dampers
Avoid 1.5Hz
natural freq when
building bridges!!