The Millennium Bridge, London.ppt
Download
Report
Transcript The Millennium Bridge, London.ppt
The Millennium Bridge,
London
Group 12
William Pender
David Coyle
Eugene Frindunbekov
Shane Fanning
Introduction
First pedestrian
crossing in a decade
Opened 10th June
2000
Foster and Partners
Arup Engineers
100,000 people in first
hours
The Design
“Blade of Light”
Aluminium Lightweight
Lateral Suspension
Bridge
8 tensile cables
Two props
4m wide deck, joined
every 16m by
movement joints
Problems
Oscillation and
swaying
Larger amplitudes
than expected
Bridge closed after
two days
So, what happened?
Vertical force from
walking
Slight force in
horizontal direction
More pedestrians –
More Force
Change in stride
Force increases to
natural frequency
Wobbly Bridge
Remedial Action
Stiffen or Damping
Active or Passive
Damping
Viscous and Tuned
Mass Dampers
Summary
Was Designed to specification
Globally highlighted the problem with
light Bridges
Because these problems were not
widely publicised and not well known
by bridge engineers at the time
2 options for dynamic excitation