MOM Report Linda R. Coney MICE Operations Manager University of California, Riverside MICO April 6, 2009

Download Report

Transcript MOM Report Linda R. Coney MICE Operations Manager University of California, Riverside MICO April 6, 2009

MOM Report

Linda R. Coney M ICE O perations M anager University of California, Riverside MICO April 6, 2009

Commissioning Needs

Working Decay Solenoid – Stands..MLI installation donePumped down over the weekendCooldown commencing today

Huge Progress Made

Many thanks to Mike Courthold, Matt Hills, Willie Spensley and Co.Watch over Easter – cold by week from Wednesday? Worth bringing in PSI expert for Quench Protector o

Who is coming? When will they be here?

Working target – Stands..one in R78 for demoone in ISIS for data April 6, 2009 Commissioning Needs-Coney 2

Issues

Detectors –luminosity monitor o o

Brunel & Paul Soler working on this Case for it will be made by Alain Blondel at video conference

Tracker cryostats o o

Cryostat 1 He leak gone – see discussion by Malcolm Ellis Install emergency shutoff valves on cryostats – this week

o

Install exhaust filter – this week

CKOV o o o

New temp and humidity monitoring device installed Need network connection and power in the DSA – have temporary HV power supply crate died – replaced w/new one – testing now

Get Decay Solenoid magnet-on lights workingreposition light on top of turret; check light in ISIS vault – will be done

this week

April 6, 2009 Commissioning Needs-Coney 3

Issues

Documentation inventory/overhaul -Instructions for shifters – things are in flux, old documentation

needs updating

Safety – need all relevant documents in one obvious placeComputingNeed network connections to progress in HallStill cannot print on OKI printer in R76Need Windows PC in MLCR – done next weekNeed connection to GRID from MLCR – in progressNeed beamline magnet on to test alarm handlerPressure regulators installed on Q7-9, water pipe connections made in

trench ongoing

Water restored to magnets – end of this week April 6, 2009 Commissioning Needs-Coney 4