Commissioning Needs
• Working Decay Solenoid – Stands.. — MLI installation done — Pumped down over the weekend — Cooldown commencing today
Huge Progress Made
— Many thanks to Mike Courthold, Matt Hills, Willie Spensley and Co. — Watch over Easter – cold by week from Wednesday? — Worth bringing in PSI expert for Quench Protector o
Who is coming? When will they be here?
• Working target – Stands.. — one in R78 for demo — one in ISIS for data April 6, 2009 Commissioning Needs-Coney 2
Issues
• Detectors – — luminosity monitor o o
Brunel & Paul Soler working on this Case for it will be made by Alain Blondel at video conference
— Tracker cryostats o o
Cryostat 1 He leak gone – see discussion by Malcolm Ellis Install emergency shutoff valves on cryostats – this week
o
Install exhaust filter – this week
— CKOV o o o
New temp and humidity monitoring device installed Need network connection and power in the DSA – have temporary HV power supply crate died – replaced w/new one – testing now
• Get Decay Solenoid magnet-on lights working — reposition light on top of turret; check light in ISIS vault – will be done
this week
April 6, 2009 Commissioning Needs-Coney 3
Issues
• Documentation inventory/overhaul - — Instructions for shifters – things are in flux, old documentation
needs updating
— Safety – need all relevant documents in one obvious place • Computing — Need network connections to progress in Hall — Still cannot print on OKI printer in R76 — Need Windows PC in MLCR – done next week — Need connection to GRID from MLCR – in progress • Need beamline magnet on to test alarm handler — Pressure regulators installed on Q7-9, water pipe connections made in
trench ongoing
— Water restored to magnets – end of this week April 6, 2009 Commissioning Needs-Coney 4