OpenSG Closing Plenary Oct 22nd, 2009 Agenda • • • • • • SG Conformity SG Communications SG Systems SG Security Feedback Next Meeting.
Download ReportTranscript OpenSG Closing Plenary Oct 22nd, 2009 Agenda • • • • • • SG Conformity SG Communications SG Systems SG Security Feedback Next Meeting.
OpenSG Closing Plenary Oct 22nd, 2009 Agenda • • • • • • SG Conformity SG Communications SG Systems SG Security Feedback Next Meeting SG Conformity • Key accomplishments – Defined scope and charter with unanimous agreement – Established guiding principles – Agreed on formation and prioritization of 3 TFs: • Edge Conformity (ADE/ADR/HAN) • SG Security Conformity • AMI ENT Conformity (Not currently prioritized) • Next steps – kick off task forces and establish weekly calls and • Next encounter data/time (tele./webinar/f2f) – To be announced via the general listserve SG Communications • Key accomplishments – OpenSG PAP #1 and #2 requirements • Identified 21 top level SG applications and 15 potential actors for each • Worked through 4 of the applications end to end and created over 100 high level functional requirements – Organization • Scope/Charter discussion SG Communications • Next steps – OpenSG PAP #1 and #2 • • • • Complete walkthrough of top level actions Align requirements by actor interfaces Distill communications requirements Face to face at Grid-Interop in Denver (mid November) – Organization • Task Groups per Knoxville session discussion • Weekly conference calls SG Communications • Next encounter data/time (tele./webinar/f2f) – Plan for next week to continue PAP #1 and #2 requirements generation SG Systems • Key accomplishments – Updated SharePoint – Electronic Balloting Process – Task Forces (next slides) • Next steps – (Next Slides) SG-Systems Task Forces & Service Teams SG-Systems WG Chair: Brent Hodges Co Chair: Greg Robinson AMI-Ent TF OpenADE TF OpenADR TF OpenHAN TF Chair: Wayne Longcore Co-Chair: Greg Robinson Chair: Dave Mollerstuen Co-Chair: Steve Van Ausdall Chair: Albert Chiu Co-Chair: Ed Koch Chair: Erich Gunther Co-Chair: Underway Underway With NAESB Underway Underway With NAESB Use Case Team Chair: Ralph Martinez Co-Chair: Kay Stefferud SRS Team Chair: Joe Zhou Planning Collaboration With SE 2.0 & OASIS Collaboration With SE 2.0 Planning Planning Collaboration With SE 2.0 & OASIS Collaboration With SE 2.0 Underway Underway Collaboration With SE 2.0 & OASIS Collaboration With SE 2.0 Service Definitions Team Chair: Jerry Gray Co-Chair: Shawn Hu Interoperability Testing Team Chair: Randy Lowe Co-Chair: Xiaofeng Wang Security Team Chair: Darren Highfill SG Systems – AMI-Enterprise • Key accomplishments – Industry Best Practice Approved: • • • • • Use Cases System Requirements Specification (SRS) Methodology Services Ready to submit to SDO (IEC TC57 WG14) • Next steps • Participate in IEC61968-9 interoperability testing • Analyze and incorporate security requirements • Update and ballot next release Service Definition Team • Key accomplishments – Approval of the Service Definition Artifacts • Next steps – Build the roadmap • Open a model for access/collaboration • Baseline the artifacts • Plan new work, e.g. OpenADE, sharing with WG14 • Next encounter data/time (tele./webinar/f2f) – Service Definition con call: 10/28 2PM SG Systems - OpenADE • Key accomplishments – Agreement on 1.0 version of Use Case document • Next steps – Work on SRS, service definitions – Reference / prototype implementations • Next encounter data/time (tele./webinar/f2f) – Weekly meetings, every Thursday @noon Mtn. SG-Systems - OpenHAN • Leadership – Chair and co-chair – lead teleconferences • • • • Chair – Mary Zientara (Reliant) Co-chair – Steve Van Ausdall (Xtensible) Co-chair – Charles (Google) Co-chair – Charlie (GE) • Define scope and charter • Use cases – common team – Focused on format and capture • but still need content and selection for our purposes in OpenHAN • • • • • Business level requirements – in OpenHAN? Provide input to SEP 2.0 (and others as requested) Analysis – update SRS requirements table Conformance tasks Security tasks SG-Systems - OpenADR Suggest DR Use Case Matrix uc Use Case Matrix DR Signals Use Cases Diagram - (NAESB Smart Grid Task Force) The purpose of this diagram is to show all relevant use cases under the scope of NIST PAP09 (Standard DR Signals) and shall cover DR programs at both the wholesale and retial market level. The focus of the use cases are interactions between the Smart Grid Domains defined by the NIST Smart Grid Interoperability Standards Roadmap. 4.5.1 Monitor DR Ev ent (Bulk) 4.9 Operational Coordination betw een Transmission and Distribution and DR Resources «include» 4.7.1 Monitor DR Ev ent (Distribution) «include» Verison 0.1 Date: October 14, 2009 «extend» «extend» 4.6 Dispatch DR Instructions (Distribution) «include» «extend» «invokes» 4.5 Dispatch DR Instructions (Bulk Pow er) 2.0 Administrate Customer Entity for DR 1.0 Administrate DR Program «include» 3.0 Administrate DR Resource «precedes» 4.8 DR Resource Ev ent Execution «invokes» 4.7 DR Direct Load Control (Distribution) «invokes» 4.0 Execute DR Ev ent «precedes» 5.0 Post DR Ev ent Management «precedes» «include» «include» 1.1 Create DR Program «include» 1.3 Remov e DR Program 3.2 Administrate Distribution DR Resource 3.1 Administrate Bulk Pow er DR Resource 4.1 Notify DR Ev ent (Bulk Pow er) 4.3 Broadcast Pricing (Wholesale) for DR Purpose 5.1 Post DR Ev ent M&V (Wholesale) «include» «include» «include» «include» «include» «include» «include» 1.2 Udpate DR Program 3.1.1 Registor DR Resource 3.1.2 Declare DR Resource Status 3.1.3 Remov e DR Resource 4.1.1 Adv anced Notification for DR (Bulk Pow er) «include»«include» «include» 4.1.2 Update a DR Ev ent (Bulk Pow er) «include» «include» «include» «include» «include» 4.1.3 Cancel a DR Ev ent (Bulk Pow er) «include» «include» 4.2.1 Adv anced Notifiation for DR (Distribution) «include» «include» «include» «include» 4.2.2 Update a DR Ev ent (Distribution) «include» «include» 3.1.4 Administrate DR Asset (Direct) Administrate DER for DR Purpose 4.1.4 DR Resource Confirmation (Bulk Pow er) 4.2.4 DR Resource Confirmation (Distribution) 5.2 Post DR Ev ent M&V (Retail Regulated) 5.3 Post DR Ev ent &V (Retail - Deregulated) «include» 4.2.3 Cancel a DR Ev ent (Distribution) «include» «include» 3.1.5 DR Bidding «include» «include» 4.2 Notify DR Ev ent (Distribution) 4.4 Broadcast Pricing (Retail) for DR Purpose «precedes» «precedes» «precedes» 5.4 DR Ev ent Financial Settlement Use Case Development Accomplishments Use Case # Use case description Note 4.2 Notify DR Event SD and Interaction - Completed 4.2.1 Advanced Notification for DR SD and Interaction - Completed 4.2.2 Update a DR Event SD and Interaction - Completed 4.2.3 Cancel a DR Event SD and Interaction - Completed 4.2.4 DR Resource Confirmation SD and Interaction - Completed 4.7 Direct Load Control SD and Interaction - Completed 4.7.1 Monitor DR Event SD and Interaction - Completed DR Use Case Discussion Topics • 4.4 Broadcast “Pricing” (Retail) for DR Purpose – The term pricing will change to more generic • Reference Architecture • DR acknowledgement and confirmation • Advanced Notification for DR • Adding testing use case • DR Resource Confirmation (DR Resource, Asset, PHEV) • Direct Load Control – randomization, monitor protocol Next steps and next encounter date/time • Next steps – Refine use cases developed – Provide draft use cases to sub-group leader (Joe) by Friday, October 21st – Refine combined retail and wholesale use cases in the next two weeks – Finalized use case and framework document by first week of November – Continue to work with NAESB, NIST and OASIS on SRS and Service Definition • Next encounter date/time – Every Thursday joint conference call with NAESB (12-2:00 central time) – NAESB SGTF sub-group F2F meeting in New England If you have comments and/or wish to join and contribute to the OpenADR Task Force effort, please contact Albert Chiu or Ed Koch at [email protected] or [email protected] Attendee Feedback • • • • • • • • • • • Names, specific group and meeting Consistent dashboards across WGs for reporting More detailed agenda, better, earlier planning for F2F Realtime schedule time change mechanism at F2F Capture on phone attendance Real full- duplex polycomm type phones for conf calls New people better comms, glossary, terms, promote don’t be shy attitude. Online library ref Boot camps were a positive WGs need to tighten up scopes, ie. OpenHAN and Net, more groups means need for tighter coordination More formal joint sessions Web based agenda with links to open meeting etc. Next Meeting • Host is Florida Power & Light • Juno Beach, FL • January 18-21, 2010 – Boot camps on January 18 – Parallel sessions January 19-21 Hosting Opportunity • April 2010 Meeting…somewhere warmer? – Looking at DC or Raleigh • July 2010 Meeting…somewhere cooler? – Looking at San Francisco Area • Send email to Chris Knudsen: [email protected] Thank you! Safe return!