Transcript Document
U.S. Dept of Energy CHP Deployment Program Claudia Tighe, CHP Deployment Program Manager, Sept. 16,2014 FIFTH ANNUAL FEDERAL ENERGY WORKSHOP & DEFENSE ENERGY PARTNERSHIP FORUM | PAGE 2 President’s Executive Order 13624: 40GW of new CHP by 2020 Achieving this goal would: – Increase total CHP capacity in the U.S. by 50 percent in less than a decade – Save energy users $10 billion a year compared to current energy use – Save one quadrillion Btus (Quad) of energy — the equivalent of 1 percent of all energy use in the U.S. – Reduce emissions by 150 million metric tons of CO2 annually — equivalent to the emissions from over 25 million cars – Result in $40-$80 billion in new capital investment in manufacturing and other U.S. facilities over the next decade Source: DOE/EPA, CHP: A Clean Energy Solution, August, 2012, www1.eere.energy.gov/manufacturing/distributedenergy/pdfs/chp_clean_energy_solution.pdf FIFTH ANNUAL FEDERAL ENERGY WORKSHOP & DEFENSE ENERGY PARTNERSHIP FORUM | PAGE 3 DOE CHP Technical Assistance Partnerships Key Activities: • Market Opportunity Analysis. Supporting analyses of CHP market opportunities in diverse markets including industrial, federal, institutional, and commercial sectors • Education and Outreach. Providing information on the energy and non-energy benefits and applications of CHP to state and local policy makers, regulators, end users, trade associations, and others. • Technical Assistance. http://eere.energy.gov/manufacturing/ distributedenergy/chptaps.html Providing technical assistance to end-users and stakeholders to help them consider CHP, waste heat to power, and district energy/Microgrid with CHP in their facility and to help them through the development process from initial CHP screening to installation. FIFTH ANNUAL FEDERAL ENERGY WORKSHOP & DEFENSE ENERGY PARTNERSHIP FORUM | PAGE 4 DOE CHP Technical Assistance Process Screening and Preliminary Analysis Quick screening questions with spreadsheet payback calculator. Feasibility Analysis Uses available site information. Estimate: savings, Installation costs, simple paybacks, equipment sizing and type. Investment Grade Analysis 3rd Party review of Engineering Analysis. Review equipment sizing and choices. Procurement, Operations, Maintenance, Commissioning Review specifications and bids, Limited operational analysis Market Opportunity 50 Existing CHP vs. Technical Potential Capacity (GW) 45 40 CHP Technical Potential 35 Existing CHP Capacity 30 25 20 15 10 5 0 Source: ICF internal estimatesFIFTH (2013)ANNUAL FEDERAL ENERGY WORKSHOP & DEFENSE ENERGY PARTNERSHIP FORUM | PAGE 6 Example DOE CHP Technical Assistance: Army National Guard 27 ARNG Sites Contacted 8.7 MW of Tech Potential at 16 Sites 23 Sites Provided with Assistance 16 Sites Received One or more Qualification Screenings 2.0 MW had payback <10 years at 3 sites FIFTH ANNUAL FEDERAL ENERGY WORKSHOP & DEFENSE ENERGY PARTNERSHIP FORUM | PAGE 7 22 FIFTH ANNUAL FEDERAL ENERGY WORKSHOP & DEFENSE ENERGY PARTNERSHIP FORUM | PAGE 8