Office of Geriatrics & Extended Care
State Veterans Home
Construction Grant Program
Thomas Graves
Office of Geriatrics and Extended Care,
Patient Care Services,
Department of Veterans Affairs Central Office
State Home Construction Grant Program
 Introduction
 History
 The Grant Process
State Home Construction Grant Program
 Introduction
– State Home Construction Purpose
• To construct State Home facilities for furnishing
domiciliary or nursing home care to veterans
• To expand, remodel, or alter existing buildings for
furnishing domiciliary, nursing home, adult day health,
or hospital care to veterans in state homes
State Home Construction Grant
Program
History
 Between 2000-2010 VA Awarded:
– $2.22 Billion in construction grants
– 51 Bed Creation Projects (5,745 Beds)
– 7 Bed Replacement Projects (1,322 Beds)
 FY 2012 budget = $100 million
 Authorized via 38 USC § 8131-8137
– Regulated via 38 CFR § 59
4
American Reinvestment and Recovery Act
$150 Million in ARRA grants to upgrade or
construct new State Veterans Homes
 20 States received funding
– AL, AZ, CT, FL, GA, IA, IL, IN, MI, MN, MO, NC, NJ, NY, OH
OR, PA, TX, UT, VA.
 34 Projects would not have received funding if ARRA
was not available.
 8 of the projects created 996 new beds for Veterans
5
State Home Construction Grant Program
 2011 Priority List
– 94 total projects in all priority groups
– 49 Priority 1 Projects (has state matching funds)
• 45 were offered funding letters
• 3 Deferred to a subsequent year
• 2 have not been offered a funding letter
– Eligible 2012 projects are in the approval process
State Home Construction Grant Program
 State Home Construction Grant Process
–
–
–
–
–
Timeline
Pre-Award
Award
Post-Award
Close Out
State Home Construction Grant
Program
Timeline for 3 Priority Lists
FY 2010 Priority List
Conditional grants have their final requirements
due 180 Days after SECVA grants conditional
approval (varies)
Sept
Nov
Dec
Feb
Mar
15 Apr
We are
here
July
30 Sept
FY 2011 Priority List
Sept
Nov
Dec
Feb
Mar
15 Apr
6 July
30 Sept
July
30 Sept
FY 2012 Priority List
Sept
Nov
Dec
Feb
Mar
15 Apr
State Home Construction Grant
Program
Pre-Award
 Begin application on Grants.gov
– Mail originals to VA
 Review Community Living Center design with
state
 Deadline for Initial Application is April 15th
–
–
Must have A1-A18 of check list complete and approved or project will not be
placed on Priority List
Send VA scope, must have A1-A18 of check list complete and approved or
project will not be placed on Priority List
 Submit certification of state matching funds by
August 15th to be placed in priority group 1
9
State Home Construction Grant
Program
Award – Funding Eligibility:
 Must rank in priority group 1 on priority list
– Ranking is determined by statutory and regulatory
requirements.
– Life safety projects are ranked above all others
 Integration of Community Living Center design
 Fall in the funding range
 Will receive a funding or non-funding letter each
Fiscal Year from VA
10
State Home Construction Grant
Program
Award – Conditional Approval
 Should Submit items B1 - B5D by July 6th
 Have 180 calendar days after Secretary signs
conditional approval to submit remaining items for a
final award
 Funds set aside but not available
11
State Home Construction Grant
Program
Award – Final Award
 Submit items B1 - B7J by July 6th
–
–
–
–
Final Drawings
Bid Tabulations
Final Budget
Contractor: Excluded Parties List system (EPLS)
 Secretary VA signs grant award
 Funds are available
12
State Home Construction Grant
Program
Post-Award:
 Payments begin: Request payment in Health and
Human Services’ Payment Management System
– SF-271 must match 424c exactly
– You can not increase total funding after grant award
 For new bed projects: Once construction is
approximately 70% complete, the State should
inquire about the VA recognition process
 Grant close out should be completed before
recognition is completed
13
State Home Construction Grant
Program
Closeout:
 Submit a request for a final grant program review
– Generally, VA will request construction
photographs
 Submit evidence the State has complied with the
Single Audit Act requirements
 Submit the Post-Grant Requirements, VA Form 100388-13
 Cannot receive the final payment until grant close
out requirements are met
14
State Home Construction Grant Program
 Lessons learned / Helpful hints
– Paper Work Reduction
• No need for multiple copies
• Cover letters are not required
• 2 signed copies of MOA
– All documents must have FAI# and date
• Especially the 424C
– Scanned files should be named to describe content
• FAI#, location, what it is, date
• Example: FAI 40-030 Clinton 271 pmt 5 9.24.10.pdf
• FAI 40-030 Clinton B2d Historical 1.24.10.pdf
– Do not include multiple documents in one scanned file
– Keep projects separate in correspondence
State Home Construction Grant Program
 Lessons learned / Helpful hints
– We got lots of questions on drawings: This is
what you send
• 2 Half-size set of drawings
• 2 spec books
• 1 CD of drawings and specifications
– State matching funds
• You need the Form: 10-0388-6
• You need proof the state has them
– Copy of budget or act: some type of proof
State Home Construction Grant Program
 Lessons learned / Helpful hints
– To get on the priority list you must have A1
through A18 on the check list completed
– Each year you must have an updated budget
– Each year you must have an updated declaration
of state matching funds: form and proof
– Grant Applications: Scope and must be robust
enough to justify the funding.
State Home Construction Grant
Program
Staff
 Tom Graves: [email protected]
 Program Analyst: Vacant
 Presidential Management Fellow: On rotation
 Program Support:
 Christina Dempsey: [email protected]
– George Washington University Graduate Student