AS9102 First Article Inspection Report TR-826 REV / - 01/21/2014 PAGE 1 First Article Inspection Requirements Industry AS9102 Rev A - Aerospace First Article Inspection Requirement The Marvin.
Download ReportTranscript AS9102 First Article Inspection Report TR-826 REV / - 01/21/2014 PAGE 1 First Article Inspection Requirements Industry AS9102 Rev A - Aerospace First Article Inspection Requirement The Marvin.
AS9102 First Article Inspection Report TR-826 REV / - 01/21/2014 PAGE 1 First Article Inspection Requirements Industry AS9102 Rev A - Aerospace First Article Inspection Requirement The Marvin Group TR-826 REV / - 01/21/2014 PAGE 2 First Article Inspection DEFINITION FIRST ARTICLE INSPECTION (FAI): A complete, independent, and documented physical and functional inspection process to verify that prescribed production methods have produced an acceptable item as specified by engineering drawings, planning, purchase order, engineering specifications, and/or other applicable design documents. Ref AS9102 Rev A The Marvin Group TR-826 REV / - 01/21/2014 PAGE 3 First Article Inspection Purpose Provides objective evidence that: All design and specification requirements are • understood • accounted for • verified • and documented Validates “as designed” configuration when produced • as planned • as tooled • as manufactured The Marvin Group TR-826 REV / - 01/21/2014 PAGE 4 First Article Inspection When should FAI be performed? • Full FAI • • • • New part introduction New supplier or new location of manufacture Lapse in production for more than 2 years When required by MEC or Customer • Partial (Delta) FAI • Design change • Change in the method of manufacture (e.g. Tooling, Processes, Special Process Sources, Location, Numerical Control Program). • Following significant incident or trend of non-conformance The Marvin Group TR-826 REV / - 01/21/2014 PAGE 5 First Article Inspection What does it apply to? • Assemblies • Sub-assemblies • All levels of detail “make to print” parts purchased directly or within assemblies • including castings and forging • All castings and forgings The Marvin Group TR-826 REV / - 01/21/2014 PAGE 6 First Article Inspection What does it apply to? cont NO FAI REQUIRED FOR: Standard Parts Product listed on Qualified Products List (QPL) The Marvin Group TR-826 REV / - 01/21/2014 PAGE 7 First Article Inspection What is included? • Verification of all design characteristics • Material and Special Process Certifications • Manufacturing Process Verification • Nonconformance resolution The Marvin Group TR-826 REV / - 01/21/2014 PAGE 8 First Article Inspection Forms AS9102 Form 1: Part Number Accountability shall be used to identify the part that is being first article inspected (FAI part) and associated subassemblies or detail parts. AS9102 Form 2: Product Accountability – Raw Material, Specifications and Special Process(s), Functional Testing shall be used if any material, special processes or functional testing are defined as a design requirement. AS9102 Form 3: Characteristic Accountability, Verification and Compatibility Evaluation shall be used to record actual measurement inspection of the FAI part for every design characteristic on the drawing, including notes. The Marvin Group TR-826 REV / - 01/21/2014 PAGE 9 AS9102 Form 1 – Part Number Accountability 1. Part Number 2. Part Name 3. Serial Number 4. FAI Report Number 5. Part Revision Level 6. Drawing Number 7. Drawing revision level 8. Additional Changes 9. Manufacturing Process Reference 10. Organization Name 11. Supplier Code 12. P.O. Number 13. Detail FAI 14. Baseline Part Number including revision level Assembly FAI a) b) Full FAI Partial FAI Reason for Partial FAI: if above part number is a detail part only, go to Field 18 if above part number is an assembly, go to the “INDEX” section below. INDEX of part numbers or sub-assembly numbers required to make the assembly noted above. 15. Part Number 16. Part Name 17. Part Serial Number 18. FAI Report Number YELLOW or LIGHT GREY fields – MANDATORY BLUE or DARK GREY fields – CONDITIONALLY information required. WHITE fieldsThese – OPTIONAL information required. REQUIRED. fields must be completed when required. 1) Signature indicates that all characteristics are accounted for; meet drawing requirements or are properly documented for disposition. 2) Also indicate if the FAI is complete per Section 5.4: 19. Signature By FAI complete FAI not Complete 20. Date 21. Reviewed By 22. Date 23. Customer Approval 24. Date Form 1, 9102 Rev A, Date: Oct 24, 2003 TR-826 REV / - 01/21/2014 PAGE 10 AS9102 Form 1 – Part Number Accountability (Top of Form) 1. Part Number 2. Part Name 3. Serial Number 4. FAI Report Number 5. Part Revision Level 6. Drawing Number 7. Drawing revision level 8. Additional Changes 9. Manufacturing Process Reference 10. Organization Name 11. Supplier Code 12. P.O. Number Box14.1.FullPart Number theincluding FAIrevision part. FAI Baselineof Part Number level Partial FAI Box 2. Name of the part as shown on Assembly FAI Reason for Partial FAI: Box 3. Serialthe number of the FAI part if drawing. a) if above part number is a detail part only, go to Field 18 b) if above part number Box is an assembly, to the “INDEX” section below. No. is the Part. 4.goThe Report applicable. INDEX of part numbers or sub-assembly numbers required to make the assembly noted above. 15. Part Number latest part 16. Part Name 17. Part Serial Number Report Number Box 5. The revision that affects the18. FAI part being first Box 6. The drawing number associated with articleBox inspected. Indicate ifissue there status is no revision. 7. Reference the of the the First Article Inspection part. Box 8. Reference Design, Engineering Note: The latest revision (Boxor 7)Manufacturing does engineering drawing. changes affecting the all FAIparts part,contained not reflected the current not always affect on abydrawing. drawing/ part revision level. 13. Detail FAI TR-826 REV / - 01/21/2014 PAGE 11 AS9102 Form 1 – Part Number Accountability (Top of Form) 1. Part Number 2. Part Name 3. Serial Number 4. FAI Report Number 5. Part Revision Level 6. Drawing Number 7. Drawing revision level 8. Additional Changes 9. Manufacturing Process Reference 10. Organization Name 11. Supplier Code 12. P.O. Number 13. Detail FAI 14. Baseline Part Number including revision level Assembly FAI a) b) Full FAI Partial FAI Reason for Partial FAI: if above part number is a detail part only, go to Field 18 if above part number is an assembly, go to the “INDEX” section below. INDEX of part numbers or sub-assembly numbers required to make the assembly noted above. 15. Part Number 16. Part Name 17. Part Serial Number 18. FAI Report Number Box 9. Reference the internalperforming works order. Box 10. Name of the organization the FAI . Box 11. Reference the supplier vendor code Box 12. Reference the Customer Contract number. Box 13. Check as appropriate. located on applicable P.O. Box 14. Check as appropriate. For Partial FAI provide the baseline drawing number, including issue status and the reason. i.e Change of manufacturing location, Non-Conformance, Process change, Design change etc. TR-826 REV / - 01/21/2014 PAGE 12 AS9102 Form 1 – Part Number Accountability (Top of Form) 1. Part Number 2. Part Name 3. Serial Number 4. FAI Report Number 5. Part Revision Level 6. Drawing Number 7. Drawing revision level 8. Additional Changes Boxes 15,10.16, 17 and 1811. Supplier – this section is only Organization Name Code 12. P.O. Number required if the Part Number in Box 1. is an Assembly with lower level parts. 13. Detail FAI 14. Full FAI Baseline Part Number including revision level 9. Manufacturing Process Reference Partial FAI Assembly FAI a) b) Reason for Partial FAI: if above part number is a detail part only, go to Field 18 if above part number is an assembly, go to the “INDEX” section below. INDEX of part numbers or sub-assembly numbers required to make the assembly noted above. 15. Part Number 16. Part Name 17. Part Serial Number 18. FAI Report Number Box 15. Reference all lower level parts, Box 16. Part name asstandards shown onorthe drawing/ including Box 17. Reference serial number of partsthe list. next levelthe sub-assembly Part Number. part if applicable. Box 18. A reference number that identifies the FAI package of the detail. TR-826 REV / - 01/21/2014 PAGE 13 AS9102 Form 1 – Part Number Accountability (Bottom of Form) Box20. 19.Date The name signature of the Box when and the FAI was prepared. Box 21. The name of the person who person who prepared the FAI. reviewed or approved the FAI package. Box 22. Date when the FAI was reviewed. Box 23. Customer Approval. Box 24. Date ofFAICustomer approval. 2) Also indicate if the FAI is complete per Section 5.4: complete FAI not Complete 1) Signature indicates that all characteristics are accounted for; meet drawing requirements or are properly documented for disposition. 19. Signature By 20. Date 21. Reviewed By 22. Date 23. Customer Approval 24. Date Form 1, 9102 Rev A, Date: Oct 24, 2003 TR-826 REV / - 01/21/2014 PAGE 14 AS9102 Form 2 – Product Accountability 1. Part Number 2 Part Name 5. Material or Process Name 6. Specification Number 3. Serial Number 7. Code 8. Special Process Supplier Code 4. FAI Report Number 9. Customer Approval Verification (Yes/No/NA) 10. Certificate of Conformance number Boxes 1 - 4 are repeated on all forms for convenience and traceability. 11. Functional Test Procedure Number 12. Acceptance report number, if applicable 13. Comments 14. Prepared By TR-826 REV / - 01/21/2014 15. Date PAGE 15 AS9102 Form 2 – Product Accountability (Top of Form) 1 . P a rt N u m b e r 2 P a rt N a m e 5 . M a te ria l o r P ro c e s s N am e 6 . S p e c ific a tio n Num ber 3 . S e ria l N u m b e r 7. Code 8 . S p e c ia l P ro c e s s S u p p lie r C o d e 4 . F A I R e p o rt N um ber 9 . C u s to m e r A p p ro v a l V e rific a tio n (Y e s /N o /N A ) 1 0 . C e rtific a te o f C o n form a n c e n um ber Box 5. Enter the name of the material or process Boxi.e. 6. Enter the material or process specification Alloy, Plate etc. Box Aluminium 7. Reference any Cadmium material code specified. Box 8.class Approved Sources Code Listed ‘make on ASL. number, and material form (Include from’ Box 9. Indicate if technical approval is required by the customer. Box 10. Reference any Certificate of Conformance number(s) materials, weld/ braze filler materials, standard catalogue e.g. Special Processhardware certification, etc).Raw material & Mill certification, Laboratory Reports etc. TR-826 REV / - 01/21/2014 PAGE 16 AS9102 Form 2 – Product Accountability (Bottom of Form) 1 1 . F u n c tio n a l T e s t P ro c e d u re N u m b e r 1 2 . A c c e p ta n c e re p o rt n u m b e r, if a p p lic a b le Box 11. Reference the Functional Test procedure Box 12. Reference the Functional Test report. as stated on the drawing. 1 3 . C o m m e n ts 1 4 . P re p a re d B y 1 5 . D a te Box 13. Comments – As applicable. Box 14. The name of the person who prepared this form. Box 15. Date when this form was completed. TR-826 REV / - 01/21/2014 PAGE 17 AS9102 Form 3 – Characteristic Accountability, Verification and Compatibility Evaluation 1. Part Number 2. Part Name Characteristic Accountability 5. 6. 7. Characteristic 8. Char Reference Designator Requirement No. Location 3. Serial Number 4. FAI Report Inspection / Test Results 9. Results 10. Designed Tooling 11. Non-Conformance Number 14. As required Boxes 1 - 4 are repeated on all forms for convenience and traceability. The signature indicates that all characteristics are accounted for; meet drawing requirements or are properly documented for disposition. 12. Prepared By TR-826 REV / - 01/21/2014 13. Date PAGE 18 AS9102 Form 3 – Characteristic Accountability, Verification and Compatibility Evaluation 1. Part Number 2. Part Name Characteristic Accountability 5. 6. 7. Characteristic 8. Char Reference Designator Requirement No. Location 3. Serial Number 4. FAI Report Inspection / Test Results 9. Results 10. Designed Tooling 11. Non-Conformance Number 14. As Required Box 5. Assign a unique number for each design Box 6. Reference the drawing zone Box 7. Reference any zoned characteristics i.e. Key characteristic. (include Sheet No. and Zone). Characteristics, Safety Critical etc. These are to be traceable to each Characteristic, drawing requirement. The signature indicates that all characteristics are accounted for; meet drawing requirements or are properly documented for disposition. 12. Prepared By TR-826 REV / - 01/21/2014 13. Date PAGE 19 AS9102 Form 3 – Characteristic Accountability, Verification and Compatibility Evaluation 1. Part Number 2. Part Name Characteristic Accountability 5. 6. 7. Characteristic 8. Char Reference Designator Requirement No. Location 3. Serial Number 4. FAI Report Inspection / Test Results 9. Results 10. Designed Tooling 11. Non-Conformance Number 14. As Required Box 9. Box 10. Record the tool identification number of specially Indicate measurements obtained for each design characteristic. Box 8. Indicate the specified requirement for the design designed tooling used as a media of inspection. Multiple characteristics shall be listed as individual reference values or list once with the Box 11. Record non-conformance document number if any characteristic i.e. Dimensional features with minimum and Box Record any addition information required. min. & max. of 14. measured values. If afound characteristic is found to be nondesign characteristic is non-conforming. maximum value of tolerance, Drawing notes, Specification conforming then the characteristic must be listed separately with the measured requirements value noted. etc. All drawing notes must be accounted for. Processes that require design verification must have statement of compliance recorded on the form i.e. Certification of Compliance – state ‘Accept’. Laboratory reports or Certificate of test must show specific values for requirements and actual results. The signature indicates that all characteristics are accounted for; meet drawing requirements or are properly documented for disposition. 12. Prepared By TR-826 REV / - 01/21/2014 13. Date PAGE 20 AS9102 Form 3 – Characteristic Accountability, Verification and Compatibility Evaluation 1. Part Number 2. Part Name Characteristic Accountability 5. 6. 7. Characteristic 8. Char Reference Designator Requirement No. Location 3. Serial Number 4. FAI Report Inspection / Test Results 9. Results 14. Measurement Equipment (FAI) 11. Non-Conformance Number 10. Designed Tooling Box 12. Name of the person who prepared this form. Box 13. Date when this form was completed. The signature indicates that all characteristics are accounted for; meet drawing requirements or are properly documented for disposition. 12. Prepared By TR-826 REV / - 01/21/2014 13. Date PAGE 21 First Article Inspection FAI Completion & Verification • Results compiled by person independent to process • Results reviewed independently and signed • Customer acceptance The Marvin Group TR-826 REV / - 01/21/2014 PAGE 22