Philosophy
 The Work Program always considers Safety as the first
priority;
 Efficiency and Capacity works are prioritised based on
the greatest common benefit, and priorities are agreed by
the group;
 The Safety and Efficiency balance is considered; and
 The work program is aligned with ICAO Policies and
Plans
ASIOACG WG – Dubai – May 2013
Process




Identify (Desired Operational Outcome)
Analyze (Constraints or gaps that need to be overcome)
Plan (Solution)
Adapt (Monitor and Review)
ASIOACG WG – Dubai – May 2013
Identify





Identify desired operational outcome
Problem on ATC and/or Operator
Efficiency enhancement.
Area in the region
Timing in the day and/or year
ASIOACG WG – Dubai – May 2013
Analyse
 Determine the Constraints or gaps that need to be
overcome
 Determine root cause and related factors
 Determine Adaptable ASBU concept.
 Measure the required level.
 What item need to be considered for achieve ASBU
concept.
ASIOACG WG – Dubai – May 2013
Plan





Adaptable technology and technique
Evaluate requirement for ANSP and Airline
Assign tasks to ANSP and Airline
Schedule detail tasks.
Agree priority
ASIOACG WG – Dubai – May 2013
Adapt
 Monitor the process and track the tasks
 Evaluate the result of works.
 Check further requirement of enhancement.
ASIOACG WG – Dubai – May 2013
Policy Discussion
 Include in ASIOACG Terms of Reference?
ASIOACG WG – Dubai – May 2013
Questions, Discussion & Agreement
Refer to Discussion Paper –Capacity Enhancement Development Policy