Transcript Slide 1

Central Maine Power
Local System Plan
Presentation
Planning Advisory Committee Meeting
November 19, 2008
1
1
1
Local System Plan (LSP)
Communication
Per Attachment K – Local, this LSP presentation:
•
Describes projected improvements to non-PTF that are needed to maintain
reliable customer service.
•
LSP is presented at a Planning Advisory Committee meeting once a year
•
PAC, Transmission Customers, and other Stakeholders have 30 days to
provide written comments for consideration to CMP
– CMP’s contact:
David M. Conroy
Manager System Planning
Central Maine Power Company
83 Edison Drive
Augusta, Maine 04336
(email: [email protected])
2
2
2
LSP Communication cont.
• Each PTO is individually responsible for
publicly posting and updating the status of its
respective LSP and the transmission projects
list on a website in a format similar to the
RSP project list
• The ISO-NE RSP project list contains links to
each individual PTO’s transmission project
list
• CMP’s LSP project list is located at:
http://www.cmpco.com/SuppliersAndPartners/Transmission
Services/CMPTransmissionSvc/lsp.html
3
3
3
CMP LSP Project List
• Central Maine Power will update the LSP project list at least
annually.
• A presentation of the LSP will be made annually.
• LSP Project List is a cumulative listing of proposed transmission
solutions intended to meet identified needs.
• Similar to PTF projects in the RSP, the LSP project list contains a
status of each non-PTF project:
•
•
•
•
•
Concept
Proposed
Planned
Under Construction
In-Service
4
4
4
CMP’s Local System Planning
Process
• All CMP system upgrades are determined in accordance with
Central Maine Power Company Transmission Planning Criteria.
• Planning studies can result from:
– Periodic Assessment of CMPs 14 Local Planning Areas
– Load Growth
– Retail or Wholesale Customer Request
– Generator Interconnection Request
– System-Wide Contingency Analysis
• Studies may utilize both ISO-NE Library Base Cases and/or Local
CMP Base Cases.
• Generator Interconnections on the non-PTF Transmission System
are guided by the CMP Transmission & Distribution
Interconnection Requirements for Generation.
5
5
5
LSP Projects
Need
Projected
In-Service
Date
Major
Project
Load Growth/
Sub-Area Study
June 2009
Boothbay
Area
Reliability
Study
Load Growth/
Sub-Area Study
Project
Status
Needs Assessment
Solutions
Newcastle
Substation
Under
Construction
Several transmission
elements could overload
under normal operating
conditions in 2010
Add 2nd
transformer,
re-rate five
34.5 kV lines,
add 115 kV
breakers, add
5.4 MVAR
capacitor bank
May 2009
Edgecomb
Substation
Under
Construction
Potential widespread low
voltage, post-contingency
Add 34.5 kV
breakers, add
5.4 MVAR
capacitor bank
Load Growth/
Sub-Area Study
February
2009
Boothbay
Substation
Under
Construction
Potential Low Voltage,
post-contingency
Add 5.4 MVAR
capacitor bank
Load Growth/
Sub-Area Study
December
2008
Damariscotta
Substation
Under
Construction
Potential Low Voltage,
post-contingency
Add 3.6 MVAR
capacitor bank
6
6
6
LSP Projects
Need
Projected
In-Service
Date
Load
Growth/
Sub-Area
Study
2010
Load
Growth/
Sub-Area
Study
Major
Project
Augusta
Area
Reliability
Study
Project
Status
Needs Assessment
Solutions
Line Reratings
Proposed
Several transmission
elements could overload
under normal operating
conditions
Re-rate 34 kV line
Sections 39 & 41
2011
Bowman St
Substation
Proposed
Potential Bowman St
115/34.5 kV transformer
overloaded and low
voltage post-contingency
Add 2nd 115 115/34.5
kV transformer
Load
Growth/
Sub-Area
Study
2011
Maxcys
Substation
Proposed
Low voltages following
loss of Maxcys 115/34.5
kV transformer
Add second
transformer at Maxcys
Load
Growth/
Sub-Area
Study
December
2008
Coordinate w/MPRP
Augusta
East Side
Substation
Under
Construction
115 kV Line Section 88
fault results in loss of
115/34.5 kV supply at
Augusta East Side and
low voltages
Replace Augusta East
Side 115 kV switch
with a circuit breaker
7
7
7
LSP Projects
Need
Projected InService Date
Major
Project
Project
Status
Needs Assessment
Solutions
Load Growth/
Sub-Area
Study
2011
Berwick Lebanon
Area
Reliability
Study
Bassett
Substation
Proposed
Experiencing high load growth,
thermal restriction on Section
118
Add 2nd 34.5
kV line from
Quaker Hill to
Bassett, new
Bassett S/S
Load Growth/
Sub-Area
Study
2013
Berwick
Substation
Proposed
Load growth, inadequate
transformer capacity
Add 34.5 kV
transmission
line Bassett to
Berwick, new
Berwick S/S
Load Growth/
Sub-Area
Study
2012
New
Lebanon
Substation
Proposed
Load growth in Lebanon area will
exceed area capacity
Add new
Lebanon S/S,
add 34.5 kV
transmission
line from
Butler’s Corner
Load Growth/
Sub-Area
Study
2010
High St
Substation
Proposed
Thermal restrictions on
transmission elements
Re-rate S114,
S112A, S114A
& S185
8
8
8
LSP Projects
Need
Projected
In-Service
Date
Major
Project
Project
Status
Needs Assessment
Solutions
Load Growth/
Sub-Area Study
2010
Camden
Substation
Proposed
Low voltage
Add 5.4 MVAR
capacitor bank
Load Growth/
Sub-Area Study
2011
CamdenRockland
Area
Reliability
Study
Park St
Substation
Proposed
Low voltage
Add 5.4 MVAR
capacitor bank
Load Growth/
Sub-Area Study
2011
Meadow Rd
Substation
Proposed
Low voltage
Add 10.8 MVAR
capacitor bank
Load Growth/
Sub-Area Study
2012
Highland
Substation
Proposed
Need for postcontingent support in
the area provided by a
new 34 kV line.
•New 34 kV
transmission line to
Meadow Rd
•Add 1 mile 34.5 kV
line to separate
Warren – Waldoboro
line
9
9
9
LSP Projects
Need
Projected
In-Service
Date
Major
Project
Load Growth/
Sub-Area
Study
2008 & 2009
Load Growth/
Sub-Area
Study
2009
LewistonAuburn
Area
Reliability
Study
Load Growth/
Sub-Area
Study
2012
Project
Status
Needs Assessment
Solutions
Line
Re-ratings
Under
Construction
Potential 34.5 kV line
overloads for normal
operating conditions
Re-rate five 34 kV
lines: Sections 41, 45,
46, 50, & 72
Hotel Road
Substation
Proposed
Potential postcontingency low
voltages & overload of
Hotel Rd 115/34.5 kV
transformer
Install 2nd 115/34 kV
transformer & 115 kV
breaker at Hotel Road
Gulf Island Lewiston
Lower
Substations
Planned
Overloading of Lewiston
- Auburn Downtown
Transmission Corridor
Reinforce Gulf Island
– Lewiston Lower
transmission system
via new 115 kV
transmission line.
Coordinate w/MPRP
Load Growth/
Sub-Area
Study
2009
Leeds
Substation
Planned
Low voltage and
transformer loading at
Turner
Leeds 115/34.5 kV
substation
10
10
10
LSP Projects
Need
Projected
In-Service
Date
Major
Project
Project
Status
Needs Assessment
Solutions
Load Growth/
Sub-Area Study
2011 & 2012
Saco Bay
Area
Reliability
Study
New Ross
Road &
Goosefare
Substations
Planned
Additional 115 kV
transformer capacity and
voltage support is needed
in the Saco Bay Area.
Loss of Section 193
violates CMP’s loss of
load criterion.
New 115 kV doublecircuit line from
Louden to Old
Orchard Beach
New 115/34.5 kV
Substation in Old
Orchard Beach
Load Growth/
Sub-Area Study
June 2010
Section 174
Planned
34.5 kV line overload &
condition
Rebuild Section 174
Load Growth/
Sub-Area Study
2013
2nd Portland
Loop
Concept
Support load growth in the
Portland-North Area
Study started.
Potential for a 115
kV transmission line
from Yarmouth to
East Deering with
115/34.5 kV S/S
Portland North
Area
Reliability
Study
Coordinate w/MPRP
11
11
11
LSP Projects
Need
Projected
In-Service
Date
Load Growth/
Sub-Area Study
2012
Major
Project
Project
Mid-Coast
Reliability
Study
Belfast
Breakers
Status
Proposed
Needs
Assessment
Solutions
Loss of Section 86
exceeds CMP’s loss
of load criterion and
results in low voltages
•Add 115 kV breakers at
Belfast
•Build ~ 1 mile 115 kV
tap line
•Add 10.8 MVAR 34.5
kV capacitor bank
•Coordinate w/MPRP
Generator
Interconnect
2009
ISO-NE
Queue #
138
Under
Construction
Meet Interconnection
Request & Implement
PPA requirements
•Rebuild Bigelow
Substation
•Wyman Hydro Sect
215 termination
•Re-rate Sect 215
•Several area capacitor
banks
Generator
Interconnect
2009
ISO-NE
Queue #
197 RH
Concept
Request to connect
55 MW to CMP 34.5
kV Section 54 north
of Rumford 115 kV
Substation
Undergoing System
Impact Study
12
12
12
LSP Projects
Need
Projected
In-Service
Date
Generator
Interconnect
2012
Generator
Interconnect
Major
Project
Project
Status
Needs Assessment
Solutions
ISO-NE
Queue #
272
Concept
Interconnection Request for
100 MW to CMP 115 kV
Section 222 north of
Wyman Hydro Substation
Undergoing
Feasibility Study
2012
ISO-NE
Queue #
272
Concept
Interconnection Request for
68 MW to CMP 34.5 kV
Section 54 north of
Rumford 115 kV Substation
Undergoing
Feasibility Study
Generator
Interconnect
2009
ISO-NE
Queue #
215 LF
Concept
Interconnection Request for
75 MW to CMP 34.5 kV
Section 59 north of
Rumford 115 kV Substation
Undergoing
System Impact
Study
Generator
Interconnect
2010
ISO-NE
Queue #
244 HP
Concept
Interconnection Request for
156 MW to CMP 115 kV
Section 215
Undergoing
Feasibility Study
13
13
13