Transcript Slide 1

Central Maine Power
Local System Plan
Presentation
Planning Advisory Committee Meeting
December 16, 2009
1
1
1
Purpose of Local System Plan
Per Attachment K – Local, this LSP presentation:
• Describes projected improvements to non-PTF
that are needed to maintain reliable customer
service.
• Reflects:
– LSP Needs Assessments
– Corresponding transmission system planning studies
2
2
2
LSP Communication
• LSP is communicated to the PAC at an ISO-NE PAC RSP
meeting once a year.
– Separate meetings can be arranged if needed
• PAC, Transmission Customers, and other Stakeholders
have 30 days to provide written comments for
consideration to CMP
– CMP’s contact:
David M. Conroy
Manager System Planning
Central Maine Power Company
83 Edison Drive
Augusta, Maine 04336
(email: [email protected])
3
3
3
LSP Communication cont.
• Each PTO is individually responsible for
publicly posting and updating the status of its
respective LSP and the transmission projects
list on a website in a format similar to the
RSP project list
• The ISO-NE RSP project list contains links to
each individual PTO’s transmission project
list
• CMP’s LSP project list is located at:
http://www.cmpco.com/SuppliersAndPartners/Transmission
Services/CMPTransmissionSvc/lsp.html
4
4
4
CMP LSP Project List
• Central Maine Power will update the LSP project list at least
annually.
• A presentation of the LSP will be made annually.
• LSP Project List is a cumulative listing of proposed transmission
solutions intended to meet identified needs.
• Similar to PTF projects in the RSP, the LSP project list contains a
status of each non-PTF project:
•
•
•
•
•
Concept
Proposed
Planned
Under Construction
In-Service
5
5
5
CMP’s Local System Planning
Process
• All CMP system upgrades are determined in accordance with
Central Maine Power Company Transmission Planning Criteria.
• Planning studies can result from:
– Periodic Assessment of CMPs 14 Local Planning Areas
– Load Growth
– Retail or Wholesale Customer Request
– Generator Interconnection Request
– System-Wide Contingency Analysis
• Studies may utilize both ISO-NE Library Base Cases and/or Local
CMP Base Cases.
• Generator Interconnections on the non-PTF Transmission System
are guided by the CMP Transmission & Distribution
Interconnection Requirements for Generation.
6
6
6
LSP Projects
Need
Load Growth/
Sub-Area Study
Load Growth/
Sub-Area Study
Load Growth/
Sub-Area Study
Load Growth/
Sub-Area Study
Projected
In-Service
Date
2011
2012
2012
2012
Major
Project
Portland
North
Area
Reliability
Study
Project
Status
Line work
Bishop Street
Substation
Falmouth
Substation
Solutions
Proposed
Several transmission
elements would experience
overloading under normal
operating and/or single
element contingency
conditions in 2011
Re-rate portions
of four 34kV
lines: S180A,
S102, S180,
S188
Proposed
Low voltages on Section
188 under single element
contingencies, violation of
25 MW loss of load criteria
Add 2-34 kV
breakers, add 5.4
MVAR capacitor
bank
Low Voltages on Section
180 under single element
contingencies, violation of
25 MW loss of load criteria
Add 2-34 kV
breakers
Low Voltages in the local
area under single element
contingencies
Add 5.4 MVAR
capacitor bank at
Freeport, E.
Deering, (2) N.
Gorham S/S
Proposed
Voltage
support
Needs Assessment
Proposed
7
7
7
LSP Projects
Need
Load Growth/
Sub-Area Study
Load Growth/
Sub-Area Study
Load Growth/
Sub-Area Study
Load Growth/
Sub-Area Study
Projected
In-Service
Date
2012
Major
Project
Portland
North
Area
Reliability
Study
(Cont)
Project
Line work
2013
Elm Street
Substation
2014
Swett Rd.
Substation
2015
East Deering
Substation
Status
Needs Assessment
Solutions
Proposed
Several transmission
elements would
experience overloading
under normal operating
and/or single element
contingency conditions in
2012
Rebuild portions
of two 34kV
lines: S180,
S188
Proposed
Transmission elements
experienced overloading
(Not needed if Raven
Farm is built for MPRP)
Bring S164 in/out
of Elm St, re-rate
S164A
Proposed
Low Voltages in the local
area under single
element contingencies
Add 2-34 kV
breakers, rebuild
S103
Proposed
Additional source needed
in the area
(Coordinate with MPRP)
115-34kV S/S,
115kV line from
Elm St.
8
8
8
LSP Projects
Need
Load Growth/
Sub-Area Study
Load Growth/
Sub-Area Study
Load Growth/
Sub-Area Study
Load Growth/
Sub-Area Study
Projected
In-Service
Date
2015
Major
Project
Portland
North
Area
Reliability
Study
(Cont)
Status
North
Yarmouth
Substation
Skowhegan
Area
Reliability
Study
Line work
Proposed
Proposed
Solutions
Reliability Concerns under
single element
contingencies
115-34kV S/S,
115kV line to
Gray and
Freeport, 2-34
kV breakers at
Gray and
Freeport
Voltage support is needed
Add 5.4 MVAR
capacitor bank
Additional voltage support
is needed
Add an
additional 5.4
MVAR
capacitor bank
Transmission element
experienced overloading
under single element
contingency conditions
Re-rate S73
Proposed
Prides Corner
Substation
2018
Needs Assessment
Proposed
Swett Road
Substation
2017
2011
Project
9
9
9
LSP Projects
Need
Load Growth/
Sub-Area Study
Load Growth/
Sub-Area Study
Load Growth/
Sub-Area Study
Projected
In-Service
Date
2012
Major
Project
Skowhegan
Area
Reliability
Study
(Cont)
Project
Status
Needs Assessment
Solutions
Voltage
Support on
S83
Proposed
Low Voltages in the local
area under single element
contingencies
20 MVAR Cap
Bank
Additional source needed in
the area, distribution
circuits being overloaded
34/12kV S/S,
34kV line from
Weston S/S,
34kV breaker
at Weston
Reliability Concerns under
single element
contingencies
2nd 115/34kV
xfmr, tap S241
with new
115kV line
Transmission elements
experienced overloading
under single element
contingency conditions
Rebuild S55 &
S58
Norridgewock
Substation
2012
Lakewood
Substation
2013
Proposed
Proposed
Bath Area
Load Growth
2011
Line work
Proposed
10
10
10
LSP Projects
Need
Projected
In-Service
Date
Major
Project
Load Growth/
Sub-Area Study
June 2009
Boothbay
Area
Reliability
Study
Load Growth/
Sub-Area Study
Project
Status
Needs Assessment
Solutions
Newcastle
Substation
In-Service
Several transmission
elements would
experience overloading
under normal operating
conditions in 2010
Add 2nd
transformer,
re-rate five
34kV lines,
add 115
breakers, add
5.4 MVAR
capacitor bank
May 2009
Edgecomb
Substation
In-Service
Widespread low voltage
Add 34 kV
breakers, add
5.4 MVAR
capacitor bank
Load Growth/
Sub-Area Study
February
2009
Boothbay
Substation
In-Service
Low Voltage
Add 2.7 MVAR
capacitor bank
Load Growth/
Sub-Area Study
December
2008
Damariscotta
Substation
In-Service
Low Voltage
Add 3.6 MVAR
capacitor bank
11
11
11
LSP Projects
Need
Projected
In-Service
Date
Load
Growth/
Sub-Area
Study
2011
Load
Growth/
Sub-Area
Study
Major
Project
Augusta
Area
Reliability
Study
Project
Status
Needs Assessment
Solutions
Line Reratings
Proposed
Several transmission
elements overloaded
under normal operating
conditions
Re-rate 34 kV line
Sections 39 & 41 to
212°F thermal limit
2011
Bowman St
Substation
Proposed
Bowman St 115/34 kV
transformer overloaded
and low 34 kV bus
voltage post-contingency
Add 2nd 115 34 kV
transformer
Load
Growth/
Sub-Area
Study
2013
Maxcys
Substation
Proposed
Low voltages following
loss of Maxcys 115/34 kV
transformer
Add second 14 MVA
115/34 kV transformer
at Maxcys.
Coordinate w/MPRP
Load
Growth/
Sub-Area
Study
December
2008
Augusta
East Side
Substation
In-Service
115 kV Line Section 88
fault results in loss of
115/34 kV supply at
Augusta East Side and
low 34 kV bus voltages
Replace Augusta East
Side 115 kV motor
operated air break
switch with a circuit
breaker
12
12
12
LSP Projects
Need
Projected InService Date
Major
Project
Load Growth/
Sub-Area
Study
2010
Load Growth/
Sub-Area
Study
2011
Berwick Lebanon
Area
Reliability
Study
Load Growth/
Sub-Area
Study
2013
Load Growth/
Sub-Area
Study
2013
Project
High St
Substation
Bassett
Substation
Berwick
Substation
Status
Needs Assessment
Solutions
Planned
Thermal restrictions on
transmission elements
Re-rate S114,
S112A, S114A
& S185
Planned
Experiencing high load growth,
thermal restriction on Section
118
New Bassett
S/S
Proposed
Experiencing high load growth,
thermal restriction on Section
118
Add 2nd 34 kV
line from
Quaker Hill to
Bassett
Proposed
Load growth, inadequate 34/12
kV capacity, overloaded
distribution circuits
Add 34 kV
transmission
line Bassett to
Berwick, new
Berwick S/S
13
13
13
LSP Projects
Need
Projected
In-Service
Date
Major
Project
Project
Status
Needs Assessment
Solutions
Load Growth/
Sub-Area Study
2014
Berwick Lebanon
Area
Reliability
Study
(Cont.)
New
Lebanon
Substation
Proposed
Load growth in Lebanon
area will exceed area
capacity
Add new Lebanon
S/S, add 34 kV
transmission line from
Butler’s Corner
Load Growth/
Sub-Area Study
2011
Camden
Substation
Proposed
Low voltage
Add 5.4 MVAR
capacitor bank
Load Growth/
Sub-Area Study
2011
CamdenRockland
Area
Reliability
Study
Park St
Substation
Proposed
Low voltage
Add 5.4 MVAR
capacitor bank
Load Growth/
Sub-Area Study
2011
Meadow Rd
Substation
Proposed
Low voltage
Add 10.8 MVAR
capacitor bank
Load Growth/
Sub-Area Study
2012
Highland
Substation
Proposed
Increased reliability to
meet planning loss of
load criteria by splitting
Section 51 (Warren –
Waldoboro).
Add 1 mile 34.5 kV
line to separate
Warren – Waldoboro
line
14
14
14
LSP Projects
Need
Projected
In-Service
Date
Major
Project
Project
Status
Needs Assessment
Solutions
Load Growth/
Sub-Area
Study
2013
CamdenRockland
Area
Reliability
Study
(Cont.)
Highland
Substation
Proposed
Need for postcontingent support in
the area provided by a
new 34 kV line.
New 34 kV
transmission line to
Meadow Rd
Load Growth/
Sub-Area
Study
2009
Line
Re-ratings
In-Service
34 kV line sections are
overloaded for normal
operating conditions
Re-rate five 34 kV
lines: Sections 41, 45,
46, 50, & 72
Load Growth/
Sub-Area
Study
2010
LewistonAuburn
Area
Reliability
Study
Hotel Road
Substation
UnderConstruction
Post-contingency 34 kV
low voltage problems &
overloading of Hotel Rd
115/34 kV transformer
Install 2nd 115/34 kV
transformer at Hotel
Road
Load Growth/
Sub-Area
Study
2010
Leeds
Substation
Planned
Low voltage and
transformer loading at
Turner
•Build a new Leeds
115/34 kV distribution
substation
15
15
15
LSP Projects
Need
Projected
In-Service
Date
Major
Project
Project
Status
Needs Assessment
Solutions
Load Growth/
Sub-Area Study
2012
LewistonAuburn
Area
Reliability
Study
(Cont.)
Gulf Island Lewiston
Lower
Substations
Planned
Overloading of Lewiston Auburn Downtown
Transmission Corridor
Reinforce Gulf
Island – Lewiston
Lower transmission
system via new 115
kV transmission line.
(Coordinate with
MPRP)
Load Growth/
Sub-Area Study
2012
Saco Bay
Area
Reliability
Study
New Vallee
Lane &
Goosefare
Substations
Planned
Additional 115 kV
transformer capacity and
voltage support is needed
in the Saco Bay Area.
Loss of Section 193
violates CMP’s loss of
load criterion.
New 115 kV doublecircuit line from
Louden to Old
Orchard Beach
New 115/34.5 kV
Substation in Old
Orchard Beach
Load Growth/
Sub-Area Study
2010
Louden
Substation
Planned
34 kV line overload
Rebuild 34.5kV
Section 174
16
16
16
LSP Projects
Need
Projected
In-Service
Date
Major
Project
Load Growth/
Sub-Area Study
2012
Mid-Coast
Reliability
Study
Project
Belfast:
Breakers
Status
Proposed
Needs Assessment
Loss of Section 86
exceeds CMP’s loss of
load criterion and results
in low voltages
Solutions
•Add 115 kV
breakers at Belfast
•Build ~ 1 mile 115
kV tap line
•Add 10.8 MVAR
34.5 kV capacitor
bank
•Coordinate with
MPRP
17
17
17
LSP Generation Projects
Need
Projected
In-Service
Date
Major
Project
Project
Status
Needs
Assessment
Solutions
Generator
Interconnect
2009
ISO-NE
Queue #
138
In Service
Met Developer’s
Interconnection
Request &
Implemented the
Recommendations
contained in the I.3.9
Proposed Plan
Application
•Rebuild Bigelow
Substation
•Wyman Hydro
Substation Upgrades
•Re-rate Sect 215
•Several area capacitor
banks
Generator
Interconnect
2011
ISO-NE
Queue #
197
Planned
(CPCN in
Progress)
Request to connect
50.6 MW Wind Farm
to new CMP 115 kV
Line Section 270
•New 115 kV Line
Section 270 north of
Rumford 115 kV
Substation
•New Roxbury
Substation
•Move 115/34 kV
transformer from
Rumford to Roxbury
18
18
18
LSP Generation Projects
Need
Projected
In-Service
Date
Generator
Interconnect
2012
Generator
Interconnect
Generator
Interconnect
Major
Project
Project
Status
Needs Assessment
Solutions
ISO-NE
Queue #
272
Concept
Interconnection Request for
85 MW Wind Farm to tap
into CMP 115 kV Line
Section 222 north of
Wyman Hydro Substation
Undergoing
Feasibility Study
2011
ISO-NE
Queue #
215
Concept
Interconnection Request for
50 MW Wind Farm to tap
into new CMP 115 kV Line
Section 270 north of
Rumford 115 kV Substation
Undergoing
System Impact
Study
2010
ISO-NE
Queue #
244
Concept
Interconnection Request for
128.6 MW Wind Farm to tie
into CMP Wyman Hydro
Substation
Undergoing
System Impact
Study
19
19
19
LSP Generation Projects
Need
Projected
In-Service
Date
Generator
Interconnect
2010
Generator
Interconnect
Generator
Interconnect
Major
Project
Project
Status
Needs Assessment
Solutions
ISO-NE
Queue #
287
Concept
Interconnection Request for
34.5 MW Wind Farm to tie
into CMP Rumford IP
Substation
Undergoing
Feasibility Study
2012
ISO-NE
Queue #
290
Concept
Interconnection Request for
18 MW Wind Farm to tie
into CMP Woodstock
Substation
Undergoing
Feasibility Study
2011
ISO-NE
Queue #
300
Concept
Interconnection Request for
52.5 MW Wind Farm to tap
into CMP 115 kV Line
Section 229 between
Rumford Substation and
Riley Substation
Undergoing
Feasibility Study
20
20
20
LSP Future Studies
Major Project
Projected
Study
Date
Waterville/ Winslow
Area Reliability
Study
2010
Southern Maine
Area Reliability
Study
Lakes Region
Area Reliability
Study
Status
Needs Assessment
Solutions
Concept
Contingency processor showed
thermal and voltage violations under
single element contingencies
Conduct area reliability study
and assess possible system
upgrades
2010
Concept
Contingency processor showed
thermal and voltage violations under
single element contingencies
Conduct area reliability study
and assess possible system
upgrades
2010
Concept
Contingency processor showed
thermal and voltage violations under
single element contingencies
Conduct area reliability study
and assess possible system
upgrades
21
21
21