Transcript Slide 1

Central Maine Power
Company
Local System Plan
Presentation
Planning Advisory Committee Meeting
November 17, 2011
1
1
1
Purpose of Local System Plan
Per Attachment K – Local, this LSP presentation:
• Describes projected improvements to non-PTF
that are needed to maintain reliable customer
service.
• Reflects:
– LSP Needs Assessments
– Corresponding transmission system planning studies
2
2
2
LSP Communication
• LSP is communicated to the PAC at an ISO-NE PAC RSP
meeting once a year.
– Separate meetings can be arranged if needed
• PAC, Transmission Customers, and other Stakeholders
have 30 days to provide written comments for
consideration to CMP
– CMP’s contact:
Curtis Beveridge
Manager System Planning
Central Maine Power Company
83 Edison Drive
Augusta, Maine 04336
(email: [email protected])
3
3
3
LSP Communication cont.
• Each PTO is individually responsible for
publicly posting and updating the status of its
respective LSP and the transmission projects
list on a website in a format similar to the
RSP project list
• The ISO-NE RSP project list contains links to
each individual PTO’s transmission project
list
• CMP’s LSP project list is located at:
http://www.cmpco.com/SuppliersAndPartners/Transmission
Services/CMPTransmissionSvc/lsp.html
4
4
4
CMP LSP Project List
•
Central Maine Power will update the LSP project list at least annually.
•
A presentation of the LSP will be made annually.
•
LSP Project List is a cumulative listing of proposed transmission solutions
intended to meet identified needs.
•
Similar to PTF projects in the RSP, the LSP project list contains a status of each
non-PTF project:
Concept-
Project is under consideration as a possible solution to a need, but little or no
analysis is available
Proposed-
CMP has determined that the project is an appropriate solution to a need, but
has not yet obtained internal budget approval
Planned-
Budgetary approval has been obtained
Under
Construction-
Project is approved and is under design/construction
In-Service-
Project is complete
5
5
5
CMP’s Local System Planning
Process
• All CMP system upgrades are determined in accordance with
Iberdrola USA Electric System Planning Manual.
• Planning studies can result from:
– Periodic Assessment of CMP’s 14 Local Planning Areas
– Load Growth
– Retail or Wholesale Customer Request
– Generator Interconnection Request
– System-Wide Contingency Analysis
• Studies may utilize both ISO-NE Library Base Cases and/or Local
CMP Base Cases.
• Generator Interconnections on the non-PTF Transmission System
are guided by the CMP Transmission & Distribution
Interconnection Requirements for Generation.
6
6
6
LSP Projects
Project
Origin
Major
Project
Bowman St
Substation
Augusta
Area Reliability
Study
Coopers Mills
Substation
Needs
Assessment
Projected
In-Service
Date
Status
Add 2nd 115/34.5
kV transformer
Bowman St 115/34.5
kV transformer
overloaded and low
34.5 kV bus voltage,
post-contingency
2011
Under Construction
Add 115/12.47 kV
transformer at
Coopers Mills
(Maxcy's)
Coordinate
w/MPRP
Voltage violations
following loss of
Maxcys 115/34.5 kV
transformer
2014
Proposed
Project
Description
7
7
7
LSP Projects
Project
Origin
Bath Area
Load Study
Major
Project
Line work
Project
Description
Needs
Assessment
Rebuild 34.5 kV
Sections 55 & 58
Overloaded under
single element
contingency
conditions
Projected
In-Service
Date
2011
Status
Under Construction
8
8
8
LSP Projects
Project
Origin
Berwick Lebanon
Area Reliability
Study
Major
Project
Project
Description
Needs
Assessment
Bassett
Substation
New 34/12 kV
Bassett Substation
and 2nd 34.5 kV
transmission line to
Quaker Hill
Experiencing high
load growth,
thermal restriction
on Section 118
Berwick
Substation
New 34/12 kV
Berwick Substation
and 34.5 kV
transmission line to
Bassett
Load growth,
inadequate 34/12
kV capacity,
overloaded
distribution circuits
New Lebanon
Substation
Add new Lebanon
Substation and 34.5
kV transmission line
to Butler’s Corner
Load growth in
Lebanon area will
exceed area
capacity
Projected InService Date
Status
2011
Under
Construction
2013
Planned
Planned
2013
9
9
9
LSP Projects
Project
Origin
Project
Description
Needs
Assessment
Projected
In-Service
Date
Status
Install a 115 kV
bus-tie breaker at
Bath Substation
Severe Low Voltage
occurs with a Bath
115 kV bus-fault
2013
Proposed
Line work
Re-rate 34.5 kV
Section 76
Overloaded under
single element
contingency
conditions
2013
Proposed
Brunswick
Hydro
Substation
Upgrade
Brunswick Hydro
T1 34/12 kV
transformer
Overloaded under
normal operating
conditions
2013
Woolwich
Substation
Upgrade
Woolwich T1
34/12 kV
transformer
Overloaded under
normal operating
conditions
Topsham
Substation
Upgrade Topsham
T2 34/12 kV
transformer
Overloaded under
normal operating
conditions
Major
Project
Bath
Substation
Brunswick Topsham Area
Study
Proposed
2014
Proposed
2014
Proposed
10
10
10
LSP Projects
Project
Origin
Brunswick Topsham Area
Study
(Cont)
Major
Project
Project
Description
Topsham 115
kV Substation
Upgrade Topsham
115 kV T1 and T3
115/34.5 kV
transformers
Needs
Assessment
Overloaded under
single element
contingency
conditions
Projected
In-Service
Date
Status
2014
Proposed
11
11
11
LSP Projects
Project
Origin
Major
Project
Project
Description
Needs
Assessment
New (9.5 mile)
34.5 kV line from
Bridgton to
Kimball Road
Lakes Region
Area
Reliability
Study
Lovell Area
Upgrades
North
Limington
Upgrades
Install a 5.4 MVAR
capacitor bank at
Kimball Road
Projected
In-Service
Date
2015
Voltage violations
under contingent
system conditions
Install a 5.4 MVAR
capacitor bank at
Lovell
Status
Concept
2015
Concept
2015
Concept
Remove voltage
supervision for the
reverse power
relaying on Lovell
T1
Back feeding NH
under postcontingent
conditions creates
voltage and thermal
violations
2013
Two 34.5 kV
breakers, two 5.4
MVAR capacitor
banks
Voltage violations
under contingent
system conditions
2015
Proposed
Concept
12
12
12
LSP Projects
Project
Origin
Lakes Region
Area
Reliability
Study
(Cont)
Major
Project
Raymond
Area
Upgrades
Projected InService Date
Status
Voltage and
thermal violations
under contingent
system conditions
2015
Concept
Relocate Raymond 34
kV S/S
Room needed for
expansion
2015
Concept
New (4.5 mile) 34.5 kV
line from Raymond 115
kV to Raymond 34 kV
Voltage and
thermal violations
under contingent
system conditions
2015
Concept
New (6 mile) 34.5 kV line
from North Raymond to
Raymond 34 kV
Voltage and
thermal violations
under contingent
system conditions
2015
Project Description
Needs
Assessment
New North Raymond
115/34 kV S/S with a four
breaker ring bus and
115/34 kV transformer
and (10 mile) 115 kV
transmission line to
Surowiec
Concept
13
13
13
LSP Projects
Project
Origin
Lewiston Auburn Area
Reliability
Study
Major
Project
Project
Description
Needs
Assessment
Projected
In-Service
Date
Leeds
Substation
Build a new Leeds
115/34.5 kV
distribution
substation
Voltage violations
and overloaded
transformer at
Turner
Line work
Change protection
settings on
Section 72
34.5 kV line
overload postcontingency
2013
Great Falls
Substation
Replace Section
148 cable into
Great Falls
Substation
34.5 kV line
overload postcontingency
2013
Gulf Island
Substation
Upgrade Gulf
Island 115/34.5 kV
T1 transformer
Transformer
overloaded with load
growth, coordinate
with MPRP
reinforcements
2020
Status
Under Construction
2012
Proposed
Proposed
Concept
14
14
14
LSP Projects
Project
Origin
Major
Project
Needs
Assessment
Projected
In-Service
Date
Add 5.4 MVAR
34.5 kV capacitor
bank
Low voltage
2011
Add 3.6 MVAR
34.5 kV capacitor
bank
Low voltage
2013
Meadow Rd
Substation
Add two 5.4 MVAR
34.5 kV capacitor
banks
Low voltage
2011
Line Work
Add 1 mile 34.5 kV
line to separate
Section 51 (Warren
– Waldoboro)
Voltage and thermal
violations under
contingent system
conditions
(Not needed if NTA
is approved)
2013
Park St
Substation
Midcoast Area
NTA Analysis
(the Camden Rockland
Area Reliability
Study)
Project
Description
Status
Under Construction
Proposed
Under Construction
Proposed
15
15
15
LSP Projects
Project
Origin
Major
Project
Boothbay
Upgrades
Midcoast Area
NTA Analysis
(Cont)
Mason
Upgrades
Project
Description
Needs
Assessment
Projected
In-Service
Date
Status
Add a 2.7 MVAR
capacitor bank at
Boothbay
Low voltage
2013
Proposed
Power Factor
Correction at
Boothbay Harbor
12 kV
Low voltage
2013
Proposed
34.5 kV line
overload postcontingency
2013
Proposed
2013
Proposed
2013
Planned
Relay
Modifications on
Section 25 at
Mason
Line Work
Rebuild 34.5 kV
Section 23
Voltage violations
under contingent
system conditions
(Not needed if NTA
is approved)
Coopers Mills
Upgrades
Upgrade Coopers
Mills T1 115/34 kV
Transformer
overloaded postcontingency
16
16
16
LSP Projects
Project
Origin
Projected
In-Service
Date
Status
2015
Proposed
Rebuild 34.5 kV
Section 181
Overloaded under
single element
contingency
conditions
(Not needed if NTA
is approved)
2015
Proposed
Rebuild a portion
of 34.5 kV Section
180
Overloaded under
single element
contingency
conditions
2015
Proposed
Major
Project
Project
Description
Raven Farm
Expansion
(115/34.5 kV)
New 115 kV bus
with four breaker,
breaker-and-a-half
configuration.
Also, install a
115/34 kV
transformer and
34.5 kV line to
Elm Street
Portland
Area NTA
Analysis
Line work
Needs
Assessment
Voltage and thermal
violations under
contingent system
conditions
(Not needed if NTA
is approved)
17
17
17
LSP Projects
Project
Origin
Portland
Area NTA
Analysis
(Cont)
Major
Project
Red Brook
Project
Description
Upgrade Red
Brook T1 to a
30/50 MVA
Needs
Assessment
Transformer
overloaded under
contingent system
conditions
(Not needed if NTA
is approved)
Projected
In-Service
Date
Status
2015
Proposed
18
18
18
LSP Projects
Project
Origin
Portland North
Area Reliability
Study
Major
Project
Project
Description
Needs
Assessment
Projected
In-Service
Date
Status
Under Construction
Line work
Re-rate portions of
34kV line Section
102
Thermal violations
under normal
operating and
contingent system
conditions
2011
Bishop Street
Substation
Add 2-34 kV
breakers on
Section 188
Violation of 25 MW
loss of load criterion
2011
Rebuild portions
of 34.5 kV line
Section 188
Thermal violations
under normal
operating and
contingent system
conditions
2012
Under Construction
2013
Proposed –
Pending NTA
conclusion
Line work
Line work
Re-rate/rebuild
portions of 34kV
line Section 180A
Thermal violations
under normal
operating and
contingent system
conditions
(Not needed if NTA
is approved)
Under Construction
19
19
19
LSP Projects
Project
Origin
Portland North
Area Reliability
Study
(Cont)
Major
Project
Project
Description
Needs
Assessment
Projected
In-Service
Date
Status
Voltage
support
Add two 2.7 MVAR
capacitor banks at
Freeport
Voltage violations
under contingent
system conditions
2013
Proposed
Voltage
support
Add two 5.4 MVAR
capacitor banks at
North Windham
S/S
Voltage violations
under contingent
system conditions
2013
Proposed
Bishop Street
Substation
Add a 5.4 MVAR
capacitor bank
Voltage violations
under contingent
system conditions
2013
Bring S164 in/out of
Elm St, re-rate
S164A
Thermal violations
under contingent
system conditions
(Not needed if
Raven Farms 115
kV is built)
2013
Elm Street
Substation
Proposed
Proposed –Pending
NTA conclusion
20
20
20
LSP Projects
Project
Origin
Major
Project
Line work
Portland North
Area Reliability
Study
(Cont)
Falmouth
Substation
Project
Description
Needs
Assessment
Projected
In-Service
Date
Status
Rebuild Section
103
Could overload under
normal operating
and/or single element
contingency conditions
in 2010
2013
Planned
2013
Proposed –Pending
NTA conclusion
Add two 34.5 kV
breakers
Voltage and 25 MW
loss of load criteria
violations under
contingent system
(Not needed if hybrid
NTA is approved)
Swett Rd.
Substation
Add two 34 kV
breakers
Low Voltages in the
local area under single
element contingencies
East Deering
Substation
115-34 kV
substation with
115 kV line from
Raven Farm.
Additional source
needed in the area
(Not needed if NTA is
approved)
2014
2015
Proposed – Pending
Lakes Region Area
Reliability Study
results
Proposed –Pending
NTA Analysis
21
21
21
LSP Projects
Project
Origin
Major
Project
North
Yarmouth
Substation
Portland North
Area Reliability
Study
(Cont)
Swett Road
Substation
Prides Corner
Substation
Project
Description
Needs
Assessment
New 115/34kV
S/S tapped from
Sect 166, and
14.8 mi 34.5 kV
line to Gray &
Freeport with
breakers
Voltage violations
under contingent
system conditions
Add 5.4 MVAR
capacitor bank
Add an additional
5.4 MVAR
capacitor bank
Projected
In-Service
Date
2015
Proposed –Pending
NTA Conclusion
2016
Proposed – Pending
Lakes Region Area
Reliability Study
results
2018
Proposed –Pending
NTA Conclusion
(Not needed if hybrid
NTA is approved)
Voltage violations
under contingent
system conditions
Voltage violations
under contingent
system conditions
Status
(Not needed if hybrid
NTA is approved)
22
22
22
LSP Projects
Project
Origin
Saco Bay
Area
Reliability
Study
Major Project
Project
Description
New Vallee Lane
Substation
New 115/34.5 kV
Substation in Old
Orchard Beach
and 115 kV
double-circuit line
from Louden to
Old Orchard
Beach
New Goosefare
Substation
Needs
Assessment
Additional 115 kV
transformer capacity
and voltage support is
needed in the Saco
Bay Area. Loss of
Section 193 violates
CMP’s 25 MW loss of
load criterion.
Projected
In-Service
Date
2012
Status
Under
Construction
New 115/12 kV
substation in Saco
23
23
23
LSP Projects
Project
Origin
Skowhegan
Area
Reliability
Study
Major
Project
Project
Description
Needs
Assessment
Projected
In-Service
Date
Status
Line work
Re-rate Section
73
Overloaded under
single element
contingency
conditions
2011
Norridgewock
Source
Tap Section 73,
install 34/34 deltawye isolating
transformer for
new distribution
supply
Distribution circuit
becoming
overloaded, need a
new source
2012
Under Construction
Lakewood
Substation
Expansion
Loop Section 241
into a new 115 kV
ring bus with 2nd
115/34.5 kV
transformer
Voltage violations
under contingent
system conditions
2013
Under Construction
Under Construction
24
24
24
LSP Projects
Project
Origin
Major
Project
Needs
Assessment
Projected
In-Service
Date
Status
Re-rate portions of
34.5 kV line
Section 38.
Overloaded under
single element
contingency
conditions
2012
Planned
Belgrade
Source /
Hospital Feed
Install a 115/34 kV
transformer and
two 115 kV
breakers at North
Augusta with a
new 34.5 kV
distribution circuit
into the Belgrade
area.
Reliability and
voltage concerns on
a very long 34.5 kV
distribution circuit
out of Rice Rips;
need to bring in a
new source to shift
load. The addition of
a new hospital is
also driving these
upgrades.
2012
Planned
Line work
Re-conductor a
portion of 34.5 kV
line Section 56.
Overloaded under
single element
contingency
conditions
Line work
Waterville Winslow Area
Reliability
Study
Project
Description
2013
Proposed
25
25
25
LSP Projects
Project
Origin
Major
Project
Line work
Waterville Winslow Area
Reliability
Study
(Cont)
Line Work
Rice Rips
Substation
Project
Description
Re-rate portions of
34.5 kV line
Section 13.
Re-rate 34.5 KV
overhead portion
of Section 38B
Bring the new line
Section 241 in/out
of Rice Rips by
constructing 7
miles of new 115
kV Transmission.
Also, upgrade
Rice Rips into a 4breaker ring bus
with a second
115/34 kV
transformer.
Needs
Assessment
Overloaded under
single element
contingency
conditions
Overloaded under
single element
contingency
conditions
Voltage and thermal
violations under
contingent system
conditions
Projected
In-Service
Date
2013
2013
2014
Status
Proposed
Proposed
Proposed
26
26
26
LSP Projects
Project
Origin
Maintenance Reliability
Inspection
Major
Project
Project
Description
Bristol
Substation
Upgrade Bristol
T1
Bar Mills
Substation
Upgrade Bar Mills
T4
South China
Substation
Upgrade South
China T1
Needs
Assessment
Projected
In-Service
Date
Status
Overloaded under
normal operating
conditions
2012
2013
Planned
2012
Under Construction
Line work
Rebuild Sections;
5A, 48, 172, 187
These 34.5 kV line
sections are in very
poor condition and
need to be rebuilt to
improve reliability.
Vassalboro
Substation
Move Section 40
termination to
Vassalboro. Move
two 34.5 kV
breakers to
Vassalboro.
CMP Facilities at the
Fort Halifax
Substation are being
retired and moved to
the Vassalboro
Substation
Planned
27
27
27
LSP Generation Projects
Generator
ID
Project Description
Status
Projected InService Date
Current Progress
Interconnection Request for
50 MW Wind Farm to tap into
CMP 115 kV Section 270
north of Rumford 115 kV
Substation
Planned
2013
System Impact Study Complete
& interconnection agreement
executed
ISO-NE Queue
# 244
Interconnection Request for
117 MW Wind Farm to tie into
CMP Wyman Hydro
Substation
Proposed
2013
System Impact Study Complete
ISO-NE Queue
# 287
Interconnection Request for
33 MW Wind Farm to tie into
CMP 115 kV Line Section 229
between Rumford Substation
and Riley Substation
Planned
2013
Undergoing System Impact
Study
ISO-NE Queue
# 215
28
28
28
LSP Generation Projects
Generator
ID
Project Description
ISO-NE Queue
# 300
Interconnection Request for
20 MW Wind Farm to tie into
CMP 115 kV Line Section 229
between Rumford Substation
and Riley Substation
ISO-NE Queue
#310
Tied to
Queue #138
ISO-NE Queue
#333
Status
Planned
Projected InService Date
Current Progress
2013
System Impact Study Complete
Undergoing System Impact
Study
Interconnection Request for
45 MW Wind Farm to tie into
Customer owned 115 kV line
Section 267 north of Bigelow
Substation.
Concept
2012
Interconnection Request for
216 MW Wind Farm to tie into
CMP. Three potential
interconnection sites to be
studied.
Concept
2012
Undergoing Feasibility Study
29
29
29
LSP Generation Projects
Generator
ID
Project Description
ISO-NE Queue
#335
Interconnection Request for
25 MW biomass generator at
existing customer site.
ISO-NE Queue
#337
ISO-NE Queue
#350
Projected InService Date
Current Progress
Planned
2012
System Impact Study Complete
Interconnection Request to
true-up the existing
generating plant net output
and add a net increase of 26
MW at existing customer site,
Section 227.
Planned
2012
System Impact Study Complete
Interconnection Request to
interconnect into 3-Points of
interconnection
Concept
2013
Status
Undergoing Feasibility Study
ISO-NE Queue
#366
Interconnection Request for
13.4 MW increased capacity
at existing customer site.
Concept
2012
Undergoing System Impact
Study Study
ISO-NE Queue
#372
Interconnection Request for 3
MW increased capacity at
existing customer site.
Concept
2012 phase A
2013 phase B
Undergoing System Impact
Study
30
30
30
In-Service LSP Projects
Project
Origin
Augusta
Area Reliability
Study
Major
Project
Line work
Project
Description
Re-rate 34 kV line
Sections 39 & 41 to
212°F thermal limit
Needs
Assessment
Overloaded under
normal operating
conditions
Projected InService Date
2011
Status
In Service
31
31
31
In-Service LSP Generation
Projects
Generator
ID
Project Description
ISO-NE Queue
# 138
•Rebuild Bigelow Substation
•Wyman Hydro Substation
Upgrades
•Re-rate Sect 215
•Several area capacitor banks
ISO-NE Queue
# 290
System Impact Study
Complete
ISO-NE Queue
# 197
•New 115 kV line Section 270
(old Section 59)
•New Roxbury Substation
•Move 115/34 kV transformer
from Rumford to Roxbury
Status
In Service
In Service
Back-feed
10/15/11
In Service
Projected InService Date
Current Progress
2009
Met Developer’s
Interconnection Request &
Implemented the
Recommendations contained in
the I.3.9 Proposed Plan
Application
2011
Met Developer’s
Interconnection Request for 20
MW Wind Farm to tie into CMP
Woodstock Substation
2011
Met Developer’s
Interconnection Request to
connect 50.6 MW Wind Farm
to new CMP 115 kV Section 270
32
32
32
LSP Future Studies
Study
Portland North Area
Reliability Study
Mid-coast Area
Reliability Study
Lakes Region Area
Reliability Study
Southern Maine
Area Reliability
Study
Augusta Area
Reliability Study
Projected
Study
Date
Dec 2010
Dec 2010
2011
2012
2013
Status
Needs Assessment
Solutions
In Review
Re-affirm timing and need of
projects from the original study.
Re-assessing transmission
and NTA requirements
In Review
Re-affirm timing and need of
projects from the original study.
Re-assessing transmission
and NTA requirements
In Progress
Contingency processor showed
thermal and voltage violations
under single element contingencies
Conduct area reliability study
and assess possible system
upgrades
Concept
Contingency processor showed
thermal and voltage violations
under single element contingencies
Conduct area reliability study
and assess possible system
upgrades
Concept
Contingency processor showed
thermal and voltage violations
under single element contingencies
Conduct area reliability study
and assess possible system
upgrades
33
33
33
2011 LSP Presentation
QUESTIONS?
34
34
34