Monthly Management Report
February 2012.
Submitted By Facility Management Team
Monthly Report-(Jul 2011)
1
EXECUTIVE - SUMMARY
 This report is a review on our performance during the last Month and is
2
an attempt to analyse and evaluate our service delivery and make a
progressive step forward with improvement plan.
 The following points are put forward for review
1.
Scope and nature of services
2.
Proposed manpower distribution.
3.
Availability of manpower.
4.
Major incidents summary.
5.
Initiative taken.
6.
Initiatives planned for next month.
7.
Power failure analysis
8.
Monthly HSD consumption.
9.
DG- Generated power KWH.
10. EB power consumption.
11. Average power consumption EB+DG.
12. Suggestions and requirements.
13. Transition pending works.
14. Help desk, Complaint register.
1.Scope & Nature of Services
BMS
ETP & Ultra Pure
water system
Electrical
CeNSE-Facility
Management
Help desk
HVAC
Plumbing
3
2.PROPOSED MANPOWER DISTRIBUTION
1
1
2
4
1
3
3
4
FM
TECHNOLOGIST
CHILLER OPERATOR
PLUMBER
ELECTRICIAN
BMS OPERATOR
ASST.TECHNICIAN
3.Availability of Manpower
DESIGNATI
ON
Plane
d
July
August
Septem
ber
Octob
er
Novem
ber
Decem
ber
Januar
y
Februa
ry
Facility
Manager
1
1
1
1
1
1
1
1
1
Technologi
st
3
3
3
3
3
3
3
3
3
Electrician
4
0
2
3
3
4
4
4
4
Chiller
operators
1
0
1
1
1
1
1
1
1
BMS
operator
3
0
1
1
1
1
1
1
1
Plumbers
1
0
0
0
0
1
1
1
1
Asst.Techni
cian
2
0
2
2
2
2
1
2
2
Total
15
4
10
11
11
13
12
13
13
5
4.Major Incidents Summary
6
Date
Location
Details
Failure analysis
12-2-12
Clean room
17:30 Hrs FFU Db tripped , Over load,
earth leak current. MCB re seted.
Due to over load/earth leak FFU DB mcb
tripped.
29-2-12
BMS room
Methane gas cabinet cosmos GLD
alarm detected
At 11:25 Hrs, in methane gas cabinet
cosmos GLD red led glow (Gas leak
alarm) also we found near the both stair
case side corridor some pungent smell.
(Not in the gas cabinet corridor)
5.Initiatives taken
 3-2-12 – DG training program done.
 6-2-12 – Sprinkler jockey, main pumps tested.
 7-2-12- DG fuel injection pipe line changed by NK diesel
person..
 8-2-12- Over head tank water pump & Drain water pump
repaired.
 13-2-12- Defective tubes are removed from fab building as
instructed by Mr.Adinarayana murthi.




15-2-12- Dedicated earthling for film room equipments done.
17-2-12- PCW tank filled with DI water.
18-2-12- Chiller ,monthly PPM maintenance schedule done.
28-2-12- PCW pump which was not working due to bearing
problem got repaired.
7
6.Initiatives Planned for next month
 Fire evacuation training for users and staff.
 Signage fitting for fire exit plan for clean room.
 AHU planned preventive maintenance.
8
7.POWER FAILURE ANALYSIS
9
DATE
FROM
TO
TOTAL
10-02-2012
14:25,16:50
14:50,17:00
35 Mins
17-02-2012
9:55
13:35
220 Mins
28-02-12
11:40
12:15
35 Mins
TOTAL HRS
4:50 Hrs
8.MONTHLY HSD CONSUMPTION
10
9.DG Generated Power KWH
11
10. EB Power Consumption
12
11.AVERAGE POWER CONSUMPTION
EB+DG
13
12.Suggestions and Requirements
•Shelters to be provided for DGs & Fire pump house to avoid rain
water and leaves come inside the DG cabin & Raw water tank in side.
•FPS & FAS system to be commissioned as early as possible to face any
crisis in the building.
•PC with internet connection and telephone to be provided for
maintenance team.
•Chemical storage area to be separated with partition.
•Safety shoes to be provided for all maintenance staffs.
14
13.Transition – Pending works
•
15
14.Help desk, Complaints register
FACILITY HELP DESK COMPLAINT DETAILS
CeNSE
COMPLAIN COMPLAIN
DATE TIME
Location
T GIVEN BY T NO:
03022012
07022012
08022012
09022012
Uma
13:0
ELE-2-3Harikrishna
0
12-0001
n
Mr.R
16:3
ELE-7-2Dwarakana
0
12-0001
than
Mr.R
11:3
ELE-8-2Dwarakana
0
12-0001
than
10:4 Mr.R
ELE-9-20 Dwarakana
12-0001
than
NATURE OF COMPLAINT
SF-33
Power failure
SF-13
Lighting problem
SF-31
Socket and lighting problem
SF-31
15/2/ 16:2 Mr.S R
2012 0 Chaitanya
3rd floor
ELE-15-2physics
12-0001
lab
23/2/ 10:3 Dr.R N
2012 0 Naraharni
PA-23-212-0001
27/2/ 11:0 Mr. A
2012 0 Murthy
Utility
ELE-27-2building
12-0001
area
16
CLOSED
GF
To change the 15amps socket to the
UPS power
Raw power problem
To check the PA system in power room
Water sump motor is not working
ATTENDED
BY
DATE TIME
03022012
02072012
02082012
02092012
Srijith,
14:1
Krishna
5
kumar
REMARKS
MCB was
tripped.Completed
17:0 Kumar,Rajes Starter problem.fixed the
0 h
new starter
12:0
0
Rajesh
MCB was tripped
12:0 Kumar,bene
0 esh
Completed
15/2/ 15:3
Kumar
2012 0
23/2/ 11:3 Thyaguanan
2012 0 d
27/2/ 12:0
Kumar
2012 0
MCB was tripped
Completed
Power point problem.It
solved and completed
Thanks
17
by,