VELIGONDA PROJECT 1. Teegalem Canal (48.15 km) 62,000 Ac 2. EMC (199 km) 2,45,000 Ac 3. Udayagiri Canal 52,000 Ac In fall 4. West Branch Canal 51,000 Ac Regulator 5. Supplementation 27,500 Ac TOTAL 4,38,000 Ac Nallamalasagar FRL +244.00m Cap. 53.85 TMC Approach Channel 100 m PACKAGE-2 Foreshore of Srisailam Reservoir MDDL +834 ft FRL +885 ft Teegaleru Canal (27.33 cumecs) Flood Flow Canal 48.15 km Sunkesula Gap62000 Ac Gottipadia Gap(PACKAGE- Tunnel 328 Cumecs 3) 18.80 km BL +842 ft PACKAGE-1 Peddi Reddipally Reservoir FRL +188m Cap. 2.023 TMC Kakarla GapEastern Main Canal 23.20 km Link Channel 9.6 km PACKAGE-4 GB Reservoir FRL +254.5 m Cap. 0.415 TMC km 24.45 2,45,500 Ac 199 km Lift I Turimella Reservoir0.00 FRL +235 m Cap. 2.453 TMC Udayagiri Branch Canal 17.5 km 52000 Ac Lift II Western Branch Canal Lift III (51,000 Ac) Under progress Racherls Tank FRL +237.3 m Western Canal 22.70 km VELIGONDA PROJECT 1 Project Profile: Kollamvagu foreshore on Right bank of Srisailam Reservoir near Markapur, Prakasam District 2 Administrative Sanction : G. O. Ms No. 120, Dt: 9-7-04 for Rs. 765 Crs. and G. O. Ms. No. 164, Dt: 8-10-2004 for Rs. 469.49 Crs for Sunkesula & Gottipadiya Gaps. 3 No. of EPC Packages : 4 No 4 Agreement value of 4 packages : Rs.1465.90 Crs. 5 Budget provision for 2006-07 : Rs.289.50 Crs. 6 Expenditure of the project 2004 – 05 : Rs. 41.77 Crs. 2005 – 06 : Rs. 175.80 Crs. Cum. Exp. 7 : Rs. 217.57 Crs : Utilisation Ultimate Utilisation : 43.50 TMC Ayacut : 4,38,000 acres Utilisation : 14 TMC Drinking Water : 4 lakh population Ayacut : 1,19,000 acres Phase I 8 Ayacut 9 Land Acquisition Required : 11,453 acres Requisitioned : 11,195 acres Acquired 10 : 2,920 acres : 3621 acres of land identified and handed over Forest land to forest department afforestation. 11 Area under Submergence of the project (in acres) No. of families likely to be displaced : Stage I for Ultimate stage Forest : 3621 6426 Govt. : 4673 9953 Patta : 6780 29990 Total : 15074 46369 : Stage I : 2504 compensatory Ultimate stage 2848 12 Estimated Cost of LA (Phase I) : Rs.112.00 Crs. 13 Estimated Cost of R & R : Rs. 332.62 Crs. 14 Clearances : Site clearance accorded. Environmental clearance proposal 15 Mob. Advance (Rs. in Crores) : Paid 2004-05 : 31.66 -- 2005-06 : 72.90 8.38 Total : 104.56 16 Target date of completion Recovered : 8/2008 8.38 VELIGONDA PROJECT CATEGORY-I Name of Contractor Bid Amount Rs. in Crs. Agreemen t concluded Period of completion 1 Tunnel, Approach channel M/s Sabir-SEW-Prasad (JV) 624.60 20-08-2005 36 Months 2 Feeder channel, Sunkesula Dam, tegaleru canal M/s. GayatriJayaprakash (JV) 254.50 09-11-2004 30 Months 3 Gottipadia gap, Gottipadia canal M/s Lareson & Turbo Ltd 380.00 08-11-2004 30 months 4 Kakarla Dam, Eastern Main Canal M/s SCL-BSCPL (JV) 206.80 20-08-2005 36 Months TOTAL 1465.90 PK GN O Description VELIGONDA PROJECT Pkg.No. 1 : Construction of Tunnel from TBM from Kollamvagu in the foreshore of Srisailam Reservoir up to Guntur – Kurnool road including construction of head regulator, approach channel, exit channel. Name of the Contractor : M/s. Agreement Amount : Rs. 624.60 Crs. Agreement Date : 20-08-2005 Period of completion : 36 Months (12 milestone Target date of completion : 8/2008 SABIR,SEW&PRASAD(JV) Investigation : in progress Designs : yet to be started Execution : Yet to be started Expenditure : Land Acquisition : Required 65.86 Acres, Acquired 45.86 Acres Bottlenecks : Forest clearance is awaited 2005-2006 - Rs. 31.45 Crs. (Inc. Mob. Advance) VELIGONDA PROJECT Pkg.No. 2 : Closing of Sunkesula Gap, excavation of feeder channel and Teegaleru canal including construction of CM & CD works and distributary system for 62,000 Ac. Name of the Contractor : M/s. Gayatri-Jayaprakash (J Agreement Amount : Rs. 254.50 Crs. Agreement Date : 09-11-2004 Period of completion : 30 Months (10 milestone Target date of completion : 8/2007 Investigation : Completed Designs : yet to be started Execution : in progress Qty. of earth work done : 55,000 cum against 61,10,000 cum. Expenditure : 2004-2005 - Rs. 12.73 Crs. 2005-2006 Cum. Exp. Inc. Mob. Adv. only Land Acquisition - Rs. 42.76 Crs. - Rs. 55.49 Crs. : Required 6317 Acres, Acquired 378 Acres VELIGONDA PROJECT Pkg.No. 3 : Closing of Gottipadia Gap and excavation of Gottipadia canal including construction of CM & CD works and distributary system for 9500 Ac. Name of the Contractor Ltd., : M/s. Larsen & Toubro Agreement Amount : Rs. 380.00 Crs. Agreement Date : 08-11-2004 Period of completion : 30 Months (10 milestone Target date of completion : 8/2007 Investigation : Completed Designs : in progress Execution : in progress Qty. of EW done : 369829.22 cum against 326250 cum Qty. of concrete work done : 52,653 CuM against 108958 CuM. Expenditure Land Acquisition : 2004-2005 - Rs. 18.93 Crs. 2005-2006 - Rs. 55.30 Crs. Cum. Exp. Inc. Mob. Adv. only - Rs. 74.23 Crs. : Required 3899.02 Acres, Acquired 1303.28 Acres VELIGONDA PROJECT Name of the Contractor Agreement Amount Agreement Date Period of completion Target date of completion Pkg.No. 4 : Closing of Kakarla Gap by construction of NOF dam, excavation of link canal and part of eastern canal together with distributary system including CM & CD works for 47,500 Ac. Investigation : 18.90 Km length against 53.26 Km Designs : in progress Execution : Yet to be started Qty. of earth work done : 35,000 cum against 86,350 cum Expenditure : 2005-2006 : M/s. SCL – BSCPL (JV) : Rs. 206.80 Crs. : 20-08-2005 : 36 Months (12 milestone : 8/2008 - Rs. 17.80 Crs. (Inc. Mob. Advance) Land Acquisition : Required 2716.56 Ac., Acquired 171.45 Ac. Tunnel : Decision has to be taken for the ultimate stage i.e, 2nd tunnel of 9.2 M M dia to 11 M dia. dia are increasing the existing tunnel of 7