VAMSADHARA PROJECT (Water Availability : 57.50TMC, Ayacut proposed: 2,55,510Acs) STAGE-II STAGE-I • Completed in 1977 • Ayacut 1,48,230 Acs. • Main Left Canal : 104.24Kms. PHASE-I In Progress • Estimated cost : 124.00 Crs. • Utilisation : 12.499 TMC • Ayacut : 62, 280 Acs • Funding : AIBP • I.P created 6/05 : 40,000 Acs • I.P to be created by 6/06 : 22,280 Acs PHASEII All 3 Packages (EPC) are awarded and works are in progress • Utilisation : 20 TMC •Total Ayacut : 45,000 Acs. •Target Date for completion : 24 Months. VAMSADHARA PROJECT RIGHT MAIN CANAL (PHASE-I OF STAGE-II) Project to be completed in 2 years period Ayacut = 14,231 Acres GOTTA BARRAGE (StageI) LEFT MAIN CANAL (LMC) RESERVOIR VAMSADHARA RIVER Utilisation = 17.841 TMC ( STAGE – I COMPLETED) KM 104.24 VAMSADHARA RIVER KM 0.00 RIGHT MAIN CANAL (RMC) ( Phase-I of Stage – II) KM 37 KM 52.973 HEAD REGULATOR CM & CD WORKS, DISTRIBUTARIES, FIELD CHANNELS Head Regulator :Completed Right Main Canal Length : 52.973 KM Completed : 37 KM Progress (Balance) : 15.973 KM Distributaries PROGRESS (6/2006) COMPLETED : 40 Nos. Completed : 18 Nos. Progress : 22 Nos. TARGET DATE OF COMPLETION : 7/2006 VAMSADHARA PROJECT RIGHT MAIN CANAL (PHASE-I OF STAGE-II) Project to be completed in 2 years period 1 PROJECT PROFILE : To Construction of Vamsadhara Project Right Main Canal (PhaseI of Stage-II) to irrigate an ayacut of 62,280 acres. 2 Administrative Sanction 3 FINANCIAL : Rs. 123.936 Crs. Vide G. O. Ms. No. 115, Dt: 14-8-2000 Funding Agency : AIBP (51.61 Crs.) Estimate Cost : Rs. 86.811 Crs. Budget provision Expenditure of the project 1994 - 2004 : Rs. 44.26 Crs. 2004 – 2005 : Rs. 18.75 Crs. 2005 – 2006 : Rs. 10.98 Crs. Cum. Exp. : Rs.73.99 Crs. 4 Utilisation : 12.499 TMC 5 Drinking water : 3.26 lakh population 6 Ayacut New : 62,280 acres IP created as on 2005-2006 : 40,000 acrses Balance IP to be created Khariff : 22,280 acres VAMSADHARA FLOOD FLOW CANAL PHASE II OF STAGE-II GOTTA BARRAGE VAMSADHARA RIVER SIDE WEIR (300M) KATRAGADA (V) 8000 C/s FLOOD HEAD REGULATOR Stage – II, Phase – II Link Canal (4.053 Km) (Hiramandalam Reservoir to Gotta Barrage) HIGH LEVEL CANAL 30 Km FLOW CANAL 34.10 Km SINGIDI BALANCING RESERVOIR (Cap : 0.069 TMC) FFC (34.100 Km) Ayacut 20,000 Acres PARAPURAM BALANCIG RESERVOIR (Cap: 0.606TMC) HIRAMANDALA M BALANCIG RESERVOIR 19.05 TMC 5000 Acres Ayacut : 20,000 acres To Irrigate 1) Stage-II Phase-II (FFC) Balancing Barrage 45,000 Ac. 2) Supplementing 5 TMC from Hiramandalam Reservoir to Gotta 3) To supplement to right main canal VAMSADHARA PROJECT RIGHT MAIN CANAL (PHASE-II OF STAGE-II) 1 PROJECT PROFILE 2 Administrative Sanction Construction of Vamsadhara Project Flood Flow canal formation of : Hiramandalam Reservoir (Phase-II of Stage-II) to irrigate an ayacut of 45,000 acres Rs. 933.90 Crs. Vide G. O. Ms. No. 33, : Dt: 25.2.2005 3 No. of EPC Packages : 3 Nos. 4 Agreement value of 3 Packages : Rs. 492.82 Crs. 5 Budget Provision : Rs.158.50 Crs. 6 Expenditure of the project 7 Ayacut 8 Land Acquisition 2006-2007 : 2004-2005 : Rs. 7.38 Crs. 2005-2006 : Rs. 50.63 Cs Cum. Exp. : Rs. 58.025 : 45,000 acres Required : 10519 acres Acquired : 1331 acres 9 Estimated cost of LA : Rs.87 Crs. 10 Estimated cost of R & R : Rs.587 Crs. 11 Mob. Advance : Paid Recovered 2004-05 : Rs.6.93 Crs. -- 2005-06 : Rs.17.68 Crs. -- Total : Rs.24.61 Crs. -- VAMSADHARA PROJECT STAGE-II, PHASE-II (EPC SYSTEM) CATEGORY- II Agreemen t concluded date PKG No. Description Name of Contractor Bid /Agrt. Amount Rs in Crs. 87 Investigation, Design, Estimation & Construction of Side Weir, Head Regulator, Flood Flow Canal 14.205 Km, (0.00Km to 14.205Km) formation of Singidi Balancing Reservoir, CM & CD Works, Distributories, field Channels etc M/s Harvins Constructions Pvt. Ltd., 72.64 24-3-2005 88 Investigation, Design, Estimation & Excavation of Flood Flow Canal 19.895Km (from14.205 Km. to 34.1 Km.) formation of Parapuram Balancing Reservoir including construction of CM & CD Works, Balancing Reservoirs, Distributaries, Field Channels etc M/s Srinivasa Constructions Ltd 66.68 17-3-2005 OPEN CATEGORY OC Investigation, Design, Estimation of Earth Dam for Hiramandalam reservoir to storage capacity of 19.05 TMC of water and construction of surplus arrangements, construction of left head sluice for link canal to a discharge of 4000C/s on EPC Turn Key System M/s. Soma Patel Enterprises Ltd. (JV) .353.50 TOTAL: 492.82 Crs. 5/2005 VAMSADHARA PROJECT Package No.87/CA-II : Construction of side channel and excavation of Flood Flow Canal from Km.0.00 to Km.14.205 Investigation : Name of the Contractor Constructions Agreement Amount Agreement Date Period of Completion Date of Completion : M/s. Harvins : Rs. 72.64 Crs. : 24-03-2005 : 2 Years (8 Mile stones) : 3/2007 14.205 km Completed Approved (14.205 km against 14.205 km) Designs - Canals : in progress (Structures) Execution : 0.3 Km length No. of Machinery : Deployed 72 Nos. Expenditure : 2004-2005 - Rs. 3.6 Crs. 2005-2006 - Rs. 6.67 Crs. Cum. Exp. Mob. Adv. only – Rs. 10.27 Crs. Land Acquisition : Required 828 Acres, Acquired: 278 Acres VAMSADHARA PROJECT Package No.88/CA-II : Excavation of Flood Flow Canal from Km.14.205 to Km 34.10 and lining for a length of 15.44Kms and construction of Balancing Reservoir at Parapuram (Village) Name of the Contractor Pvt.Ltd. Agreement Amount Agreement Date Period of Completion Date of Completion : M/s. Srinivasa Const. : Rs. 66.68 Crs. : 17-03-2005 : 2 Years(8 Mile Stones) : 3/2007 Investigation : Completed (19.895 km) Designs (Canals) : Approved 19.895 kms Designs (Structures) : in progress Execution : 0.8 Km length against 19.895 Km No. of Machinery Deployed : 50 Nos. Expenditure : 2004-2005 Rs. 3.33 Crs. 2005-2006 Rs. 10.19 Crs. Cum. Exp. Inc. mob. Adv. Rs. 13.52 Crs. Land Acquisition : Required 1463 Acres, Acquired: 586 Acres VAMSADHARA PROJECT Hiramandal Reservoir : Formation of Earth Dam for Hiramandal Reservoir to store a capacity of 19.05 TMC of water. Name of the Contractor Agreement Amount Agreement Date Period of Completion Date of Completion : M/s. Soma-Patel ASI-JV : Rs. 353.504 Crs. : 31-03-2005 : 3 Years (12 Mile Stones) : 3/2008 Investigation : Completed Designs (HPs) : Approved 7.08 Km against 54.00 Km Structures : Under progress Execution : in progress No. of Machinery deployed : 6 Nos. Expenditure : 2004-2005 Land Acquisition Rs. 0.45 Crs. 2005-2006 Rs. 33.77 Crs. Cum. Exp. Inc. mob. Adv. Rs. 34.21 Crs. : Required 8228 acres, acquired 467 acres