Transcript Slide 1
PACKAGE3 LEFT HEAD SLUICE Under Execution LEFT EARTH DAM 4197M LEFT LINK CHANNEL 540M 500M EXISTING REGULATOR EXISTING LEFT MAIN CANAL 64,000 ACRES RESERVOIR FRL +105.00M SPILLWAY CAPACITY 2.52 TMC 117M RIGHT LINK CHANNEL 210 M RIGHT HEAD SLUICE RIGHT EARTH DAM 4197M EXISTING Km. 107.00 RIGHT CANAL THOTAPALLY BARRAGE SCHEME 1 PROJECT PROFILE : Construction of barrage Across river Nagavali near Totapalli (V), Vizianagaram (Dist.) [ 500 m upstream of existing anicut] 2 : G. O. Ms. No. 114, I & CAD, Dt: 31-07- Administrative Sanction 2003 for Rs. 450.23 Crores 3 4 No. of EPC Packages : 2 Nos Non EPC Packages : 2 Nos. Agreement value of above packages : Rs. 313.87 Crs. (EPC Rs.289.90 Crs. + Non EPC Rs.23.97 Crs.) 5 Budget provision for 200607 6 Expenditure of the project : Rs.165.00 Crs. 2004 – 05 : Rs. 117.84 Crs. 2005 – 06 : Rs. 36.25 Crs. Cum. Exp. 7 Utilisation 8 Ayacut : Rs. 154.09 Crs : 15.867 TMC New Ayacut : 1,20,000 acres Stabilisation : 64,000 acres Total : 1,84,000 acres 9 Land Acquisition Required : 10097 acres Requisition : 6876 acres Acquired : 2163 acres 10 Estimated cost of L.A. : Rs.106 Crs 11 Estimate cost of R & R (to be sanctioned) : Rs.40.17 Crs. 12 Clearances : All CWC clearances obtained 13 Mob. Advance (Rs. in Crores) Paid 2004-05 : 15.57 2005-06 : -- Total : Rs. 15.57 Crs. Recovered -1.19 Rs. 1.19 Crs. THOTAPALLY BARRAGE SCHEME PKG No. Description Awarded Bid Amount Rs. in Crs. NonEPC-1 Construction of Spill way Regulator across Nagavali River from Km.4.197 to Km.4.314, Vijayanagaram Dist. M/s. Prasad & Co.(PW) 11.12 NonEPC-2 Right Earth Dam from Km.4.5 to Km.8.0 including construction of Right Head Sluice at Km.6.680 M/s. Prasad & Co.(PW) 12.85 EPC-1 Formation of Left side earth dam from Km.0.00 to Km. 4.10 including left side head sluice and formation of new state high way Excavation of right main canal and its distributary system from Km.0.00 to Km.52.45 M/s. Skanska Cementation India Ltd., Mumbai. 119.88 EPC-2 Earth work excavation of Right main canal from km 52.45 to km. 107, CM & CD works and it’s distributaries & field channels M/s. Maytas-NCC(JV) 170.02 THOTAPALLY BARRAGE SCHEME Non-EPC-1: Construction of Spill way Regulator across Nagavali River from Km.4.197 to Km.4.314, Vijayanagaram Dist. Name of the Contractor Agreement Amount Agreement Date Period of Completion : M/s. Prasad & Co.(PW) : Rs. 11.12 Crs. : 16-03-2004 : 18 Months(9 Mile Stones (Now proposed as 25 Month Target Date of Completion : 4/2006 Investigation : Completed Designs : Completed Execution : in progress Qty. of earth work done : 70,000 cum against 79,900 cum. Qty. of concrete work done : 38563 cum against 44,700 cum. No. Machinery deployed : 10 Nos. (Excavators 2 Nos., Tippers 6 Nos., Generators 2 Nos. etc) Expenditure : 2004-2005 2005-2006 Cum. Inc. Mob. Adv. only Land Acquisition : Completed - Rs. 1.96 Crs. - Rs. 6.36 Crs. - Rs. 8.34 Crs. THOTAPALLY BARRAGE SCHEME Non-EPC-2 : Right Earth Dam from Km.4.5 to Km.8.0 including construction of Right Head Sluice at Km.6.680 Name of the Contractor Agreement Amount Agreement Date Period of Completion Target Date of Completion Investigation : Completed Design : Completed Execution : 3.50 Km against 3.50 Km Structures : M/s. Prasad & Co.(PW) : Rs. 12.85 Crs. : 04-06-2004 : 18 Months (6 Mile Stone : 12/2005 : 1 No Against 1 No. Qty. of earth work done Qty. of concrete work done : 1081 cum against 8370 cum. No. of Machinery Nos. etc) : Deployed 38 Nos. (Excavators 4 Nos., dozers 2Nos., Tippers 30 Expenditure : Land Acquisition : 10,10,000 cum against 11,68,405 cum 2004-2005 2005-2006 Cum. Inc. Mob. Adv. only - Rs. 6.22 Crs. - Rs. 8.61 Crs. - Rs. 14.83 Crs. : Required 119.22 Acres, Acquired 119.22 THOTAPALLY BARRAGE SCHEME EPC-1 : Formation of Left side earth dam from Km.0.00 to Km. 4.10 including left side head sluice. Excavation of right main canal and its distributary system from Km.0.00 to Km.52.45. Name of the Contractor Cementation Mumbai. Agreement Amount Agreement Date Period of Completion Stones) Target Date of Completion : M/s. Skanska India Ltd., : Rs. 119.88 Crs. : 25-10-2004/21-3-2005 : 36 Months (12 Mile : 3/2008 Investigation : Completed Designs approved : 23.57 KM length against 66 KM. (Right main canal) Execution : in progress Qty. of earth work done : 45,000 cum against 15,00,000 cum. No. of Machinery : Deployed = 8 Nos. (Excavators 2Nos, Tippers 6 Nos.) Expenditure : Land Acquisition 2004-2005 - Rs. 5.88 Crs. 2005-2006 - Rs. 3.55 Crs. Cum. Inc. Mob. Adv. only - Rs. 9.43 Crs. : Required 6573 Acres, Acquired 1668.52 Acres THOTAPALLY BARRAGE SCHEME EPC-2 : Earth work excavation of Right main canal from km 52.45 to km. 107, CM & CD works and it’s distributaries & field channels. Name of the Contractor Agreement Amount Agreement Date Period of Completion Stones) Target Date of Completion Investigation : Completed Designs approved : Completed Structures approved : 6 Nos. against 78 Nos. Execution (RMC) : 4 KM length against 54 Km. Qty. of earth work done : 8.50 Lakhs cum against 120 Lakhs cum. No. of Machinery : M/s. Maytas-NCC(JV) : Rs. 170.02 Crs. : 25-10-2004/21-3-2005 : 36 Months (12 Mile : 3/2008 : deployed = 24 Nos. (Excavators 4 Nos, Tippers 50 Nos., Dozers 4 Nos. etc) Expenditure Land Acquisition : 2004-2005 - Rs. 8.50 Crs. 2005-2006 - Rs. 8.00 Crs. Cum. Inc. Mob. Adv. only - Rs. 16.50 Crs. : Required 3557 Acres, Acquired 371.00 Acres.