FLOW DIAGRAM OF C.B.R RIGHT CANAL
(LINGALA CANAL FROM KM 0.000 TO KM 53.000)
Goddumarri Anicut
CHITRAVATHI
BALANCING
RESERVOIR
KM 0.00
LINGALA CANAL
300 Ac.
KM 29.125
CANAL WIDTH : 12 M
500 Ac.
KM 43.00
800 Ac.
KM 44.00
KM
53.00
Discharge: 37 C/s
Bed width: 2.44 M
LENGTH OF CANAL: 53 KM
DISCHARGE – 1350 C/S
500 Ac.
KM 31.00
YERRABALLI
TANK
Discharge: 1350 C/s
IPPATLIA
TANK
LINGALA
TANK
Head Regulator
Km14.978
CHITRAVATHI RIVER
(Existing)
BONALA
TANK
4,800 Ac.
2,400 Ac.
AYACUT – 25,000 ACRES
WORKS GROUNDED
COMPLETED
C.B.R RIGHT CANAL (LINGALA CANAL)
PROJECT PROFILE
1
2
Revised Admn. Sanction
Excavation of CBR Right Canal from Km.0.00 to
Km.53.00 and its distributaries and including
construction of CM & CD works and Link Canal to
Pulivendula Branch Canal.
: G.O.Ms.No. 52, Dt:10-6-04, for Rs.
32.00 Crores (Revised admn Apprl.
for Rs.150.43Crs under sanction)
3
No. of Packages
:
1
4
Agreement value of packages
:
Rs. 148.05 Crs
5
Expenditure
2004-05
:
Rs. 8.29 Crores.
2005-06
:
Rs. 28.52 Crores
Cum. Exp.
:
Rs. 36.81 Crores.
:
3.60 TMC
:
25000 Acres
:
10 TMC
6
Utilisation
7
Ayacut
8
Storage capacity to Chitravati Reservoir
9
Land Acquisition
New Ayacut
Required (canals) :
Requisitione :
1135.00 Acres
978.15 Acres
C.B.R RIGHT CANAL (LINGALA CANAL)
10
11
Forest Land
:
263.31 Acres
Present Status
:
CCF inspected the lands and sent
report to IG of Forests
Power required
: 1.40 MW
1 Lift-I
Lift Height
: 24 m
No. of Pumps
: 1 No.
Total pumps capacity
: 750 HP / 0.56 MW
2 Lift-II
:
Lift Height
: 20 m
No. of Pumps
: 1 No.
Total pumps capacity
: 350 HP/ 0.26 MW
Lift Height
: 33 m
No. of Pumps
: 1 Nos.
Total pumps capacity
: 125 HP / 0.09 MW
3 Lift-III
C.B.R RIGHT CANAL (LINGALA CANAL)
4 Lift-IV
Lift Height
: 15 m
No. of Pumps
: 1 No.
Total pumps capacity
: 75 HP / 0.06 MW
5 Lift-V
:
Lift Height
: 42 m
No. of Pumps
: 1 No.
Total pumps capacity
: 450 HP / 0.34 MW
Lift Height
: 20 m
No. of Pumps
: 1 No.
Total pumps capacity
: 125 HP / 0.09 MW
6 Lift- VI
12
Paid
Mobilization Advance
Recovered
2004-05 : Rs. 7.4 Crs
2005-06 :
Total :
13
Target Date
---
-Crs
Rs. 4.62
Rs. 7.4 Crs
Crs.
Rs. 4.62
: 3/2007
FLOW DIAGRAM OF C.B.R RIGHT CANAL
(LINGALA CANAL FROM KM 0.000 TO KM 53.000)
CATERGORY-I
PK
G
No.
Name of
Contractor
Description
Bid
/Agreemen
t Amount
Rs in Crs.
Agreeme
nt
conclude
d date
Mobilisation
Advanace
Rs. in Crs.
148.05
3 / 2005
7.40
Excavation of right main canal (Lingala
1
canal) from KM 0.00 to KM 53.00, CM &
M/s
CD works, distributaries, field channels
Mythas –
etc.
to
irrigate
25,000
acres
and
NCC,
Construction of Link canal to Pulivendula
Hyderaba
Branch Canal, Cross regulator, Head
d
regulator, Supply of vertical gates etc
CHITRAVATHI BALANCING RESERVIOIR RIGHT CANAL
(LINGALA CANAL)
Package / Cat – II
Excavation of CBR Right Canal (53 Km
length), Distributaries CM & CD
works, Link canal to Pulivendula
branch canal
1
Investigation
: Completed
Name of the Contractor
(JV)
: M/s MAYTAS-NCC
Agreement Amount
: Rs. 148.05 Crs.
Agreement Date
: 25-03-2005
Period of Completion
: 24 Months
Target date of Completion :3/2007
2
a) Designs (canals)
: Approved
3
a) Execution: (Canal)
: 17.25 KM in progress against total length of 55 KM
4
a) Qty. of earth work done 14.28 Lakh cum against 65 Lakh cum.
5
No. of Machinery (Machinery wise) deployed Poclains 8 Nos., Dozers – 4,
Tippers -6
6
Expenditure
 2004-05
 2005-06
:Rs. 36.81 Crs. (Inc. Mob. Adv. Rs. 7.4 Crs. ) against 148.05 Crs.
:Rs. 8.29 Crs. (Inc. Mob. Adv. Rs. 7.4 Crs)
: Rs. 28.52 Crs.
7
Mob. Advance recovered : Rs. 4.62 Crores.
8
Land Acquisition
: Required : 1135 Acres;
Requisitioned : 978.15 Acres