FLOW DIAGRAM OF C.B.R RIGHT CANAL (LINGALA CANAL FROM KM 0.000 TO KM 53.000) Goddumarri Anicut CHITRAVATHI BALANCING RESERVOIR KM 0.00 LINGALA CANAL 300 Ac. KM 29.125 CANAL WIDTH : 12 M 500 Ac. KM 43.00 800 Ac. KM 44.00 KM 53.00 Discharge: 37 C/s Bed width: 2.44 M LENGTH OF CANAL: 53 KM DISCHARGE – 1350 C/S 500 Ac. KM 31.00 YERRABALLI TANK Discharge: 1350 C/s IPPATLIA TANK LINGALA TANK Head Regulator Km14.978 CHITRAVATHI RIVER (Existing) BONALA TANK 4,800 Ac. 2,400 Ac. AYACUT – 25,000 ACRES WORKS GROUNDED COMPLETED C.B.R RIGHT CANAL (LINGALA CANAL) PROJECT PROFILE 1 2 Revised Admn. Sanction Excavation of CBR Right Canal from Km.0.00 to Km.53.00 and its distributaries and including construction of CM & CD works and Link Canal to Pulivendula Branch Canal. : G.O.Ms.No. 52, Dt:10-6-04, for Rs. 32.00 Crores (Revised admn Apprl. for Rs.150.43Crs under sanction) 3 No. of Packages : 1 4 Agreement value of packages : Rs. 148.05 Crs 5 Expenditure 2004-05 : Rs. 8.29 Crores. 2005-06 : Rs. 28.52 Crores Cum. Exp. : Rs. 36.81 Crores. : 3.60 TMC : 25000 Acres : 10 TMC 6 Utilisation 7 Ayacut 8 Storage capacity to Chitravati Reservoir 9 Land Acquisition New Ayacut Required (canals) : Requisitione : 1135.00 Acres 978.15 Acres C.B.R RIGHT CANAL (LINGALA CANAL) 10 11 Forest Land : 263.31 Acres Present Status : CCF inspected the lands and sent report to IG of Forests Power required : 1.40 MW 1 Lift-I Lift Height : 24 m No. of Pumps : 1 No. Total pumps capacity : 750 HP / 0.56 MW 2 Lift-II : Lift Height : 20 m No. of Pumps : 1 No. Total pumps capacity : 350 HP/ 0.26 MW Lift Height : 33 m No. of Pumps : 1 Nos. Total pumps capacity : 125 HP / 0.09 MW 3 Lift-III C.B.R RIGHT CANAL (LINGALA CANAL) 4 Lift-IV Lift Height : 15 m No. of Pumps : 1 No. Total pumps capacity : 75 HP / 0.06 MW 5 Lift-V : Lift Height : 42 m No. of Pumps : 1 No. Total pumps capacity : 450 HP / 0.34 MW Lift Height : 20 m No. of Pumps : 1 No. Total pumps capacity : 125 HP / 0.09 MW 6 Lift- VI 12 Paid Mobilization Advance Recovered 2004-05 : Rs. 7.4 Crs 2005-06 : Total : 13 Target Date --- -Crs Rs. 4.62 Rs. 7.4 Crs Crs. Rs. 4.62 : 3/2007 FLOW DIAGRAM OF C.B.R RIGHT CANAL (LINGALA CANAL FROM KM 0.000 TO KM 53.000) CATERGORY-I PK G No. Name of Contractor Description Bid /Agreemen t Amount Rs in Crs. Agreeme nt conclude d date Mobilisation Advanace Rs. in Crs. 148.05 3 / 2005 7.40 Excavation of right main canal (Lingala 1 canal) from KM 0.00 to KM 53.00, CM & M/s CD works, distributaries, field channels Mythas – etc. to irrigate 25,000 acres and NCC, Construction of Link canal to Pulivendula Hyderaba Branch Canal, Cross regulator, Head d regulator, Supply of vertical gates etc CHITRAVATHI BALANCING RESERVIOIR RIGHT CANAL (LINGALA CANAL) Package / Cat – II Excavation of CBR Right Canal (53 Km length), Distributaries CM & CD works, Link canal to Pulivendula branch canal 1 Investigation : Completed Name of the Contractor (JV) : M/s MAYTAS-NCC Agreement Amount : Rs. 148.05 Crs. Agreement Date : 25-03-2005 Period of Completion : 24 Months Target date of Completion :3/2007 2 a) Designs (canals) : Approved 3 a) Execution: (Canal) : 17.25 KM in progress against total length of 55 KM 4 a) Qty. of earth work done 14.28 Lakh cum against 65 Lakh cum. 5 No. of Machinery (Machinery wise) deployed Poclains 8 Nos., Dozers – 4, Tippers -6 6 Expenditure 2004-05 2005-06 :Rs. 36.81 Crs. (Inc. Mob. Adv. Rs. 7.4 Crs. ) against 148.05 Crs. :Rs. 8.29 Crs. (Inc. Mob. Adv. Rs. 7.4 Crs) : Rs. 28.52 Crs. 7 Mob. Advance recovered : Rs. 4.62 Crores. 8 Land Acquisition : Required : 1135 Acres; Requisitioned : 978.15 Acres