Hypothesis
Government as a client can
derive significant
improvements in cost,
value and carbon
performance through the
use of open sharable asset
information”
2
2 | WWW.BENTLEY.COM
Hypothesis
Government as a client can
derive significant
improvements in cost,
value and carbon
performance through the
use of open sharable asset
information”
1. Valuable
2. Understandable
3. General
4. Non Proprietary
5. Competitive
6. Open
7. Verifiable
8. Compliant
9. Funded
10. Five Year Programme
3
3 | WWW.BENTLEY.COM
Seven part document set for federated BIM
• BIM protocol – Contract annex
• BS 1192:2007 – Collaborative working
• PAS 1192: Part 2: 2013 – Federated project working
• PAS 1192: Part 3: 2014 – Federated asset management
• BS 1192: Part 4: 2014 – UK use of COBie
• Government ‘Soft Landings’ – Post-occupancy review
• dPOW – Digital Plan of Works …
4
4 | WWW.BENTLEY.COM
BS1192: Part 4: 2014 – UK use of COBie
• Based on
– NIBS NBIMS v3.
– COBie-UK-2012: importance of Systems and Impacts
– COBie testing tools (compliance, continuity, completeness)
• Incorporating
– COBie ‘lab’ demand matrix
– ‘IAD4’ Infrastructure group recommendations for handover
– ‘COBie for all’ group for COBie usage in infrastructure
5
5 | WWW.BENTLEY.COM
dPOW: Digital plan of work
• Five year open web-based resource
• Open competition Jan-March 2014.
• Deliver by Autumn 2014
• Type, System, Zone and Floor/Region templates
– Multiple UK Classifications
– Properties with expected
• Name (and synonyms) , Measure, Description
• Provision stage, Provider role
• Delivery stage, Delivery purpose
6
6 | WWW.BENTLEY.COM
7
7 | WWW.BENTLEY.COM
Working with other Sectors
© 2013 Bew
8
8 | WWW.BENTLEY.COM
Integrated BIM …
• Incentive
– Valuable, exportable service
– Substantial project and asset life cycle efficiency gains
• Objective
– Integrated BIM is the primary deliverable.
– Maintain federated BIM transparency and traceability
– Value-adding analysis and checking
9
9 | WWW.BENTLEY.COM
E-Infrastructure Leadership Council (ELC)
Purpose
Stakeholders
• To enable the
construction and
digital technology
industries to
collaborate and
deliver dramatic
market leading
international growth
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
10 | WWW.BENTLEY.COM
E-Infrastructure Leadership Council
BIM Task Group (Level 3)
Smart Cites
Smart Grid
HPC Stakeholders
Sensor Networks and Telemetry
Big Data
Advanced Simulation tools
Delivery Organisations
Academic Organisations (inc UCL)