Space Occupancy Monitoring

Download Report

Transcript Space Occupancy Monitoring

Brian Lynch
General Manager North America
2013 COBie Challenge
NFMT, March 2013
17-7-2015
Product description & User base
AcceleratorTM
users
user count:
facility count:
public sector:
private sector:
customers
name:
name:
name:
NFMT 2013 - COBie Challenge 2013 Challenge
for Facility Managers
> 200,000
> 20,000
40%
60%
One of world’s largest energy companies
Two of the world’s best known sports
leisure companies.
One of the world’s largest
nutrition & health companies
2
2
Tested product: COBieLite / Planon Enterprise Talk
Product name,
version:
COBie (Excel) based on
Spreadsheet XML 2003
NFMT 2013 - COBie Challenge 2013 Challenge
for Facility Managers
Planon Enterprise Talk
Planon R2011 / R2013
PC & Cloud
www.planonsoftware.com
Why
COBieLite?
COBieLite (XML)
3
Tested product: COBieLite vs. COBie
COBieLite is based on
XML structured data transfer.
XML is the industry-preferred technology
for machine-2-machine communications.
COBieLite data structure is hierarchical,
allowing for easy parsing and processing.
Checking consistency and testing of the
processing itself is facilitated well.
(advice: use the CAMed XML editor
from the bSa website!).
NFMT 2013 - COBie Challenge 2013 Challenge
for Facility Managers
4
Tested product: COBieLite vs. COBie
For Planon, it was a ‘natural fit’ with its
Enterprise-Talk technology1.
Planon worked with bSa to put COBieLite
to a first production version.
We want to express our gratitude to bSa
but especially Angela Lewis, Bill East
and Chris Bogen in working with us to
establish this result.
We expect COBieLite to receive revisions
over time.
Although supporting COBie on Excel was quite feasible too
5
Configuration
Concept of ‘Workers’:
BIM System
• No direct (SQL) access to the database:
all standard business logic applied automatically
• Small programs, each performing a specific transformation
• Workers can be linked into a ‘chain’
• Standard ‘Workers’ available in a library
• New Workers can be added with ease
• An interface using Workers is configured in the system
COBieLite.XML
BO
BO
BO
BO
EE Database
Planon Enterprise Talk
Bi-directional:
Not in the COBie challenge
but clearly a feasible option.
Enterprise Edition Platform
6
Challenge scope: COBieLite
information
COBie.Sheet
spaces and equipment
Space, Type, Component
PM schedules
Job
safety procedures
Job
systems
System
materials, tools, training
Resource
associated documents
Document
replacement parts
Spare
space and equipment properties
Attribute
space zones
Zone
Imported









We have prioritized on establishing a production version of COBieLite
with bSa. Addressing all remaining data elements is well feasible.
NFMT 2013 - COBie Challenge 2013 Challenge
for Facility Managers
7
COBie value proposition: to the lifecycle
?
$
Facility management
$
Service
Level Agreement
$
SAAS / Cloud
0
10
NFMT 2013 - COBie Challenge 2013 Challenge
for Facility Managers
20
Major Facility
Project
Business
Planning
Pre-Design
Design
CDs
Construction
Occupancy
Construction
Major Facility
Project
Service provider
• Contracting
• (Performance based) pricing
• KPI’s
• ...
30
8
40
50
60
Demolition
Logistics
Major Facility
Project
Design &
Engineering
• Sustainability
• Maintenance
• Space management
• Health & safety
• Reconstruction
• ....
70
80
Value proposition
BIM offers tangible value for facility
management.
At the same time its lifecycle adoption in
the industry is just starting.
COBie provides the means to manage
consistency of information between
CAFM / IWMS and BIM.
NFMT 2013 - COBie Challenge 2013 Challenge
for Facility Managers
9
Contacts
COBie support
Nelson Yan
phone: +1 7813560999
email: [email protected]
Marketing
POC
Brian Lynch
phone: +1 7813560999
email: [email protected]
Jos Knops
phone: +31 24 6413135
email: [email protected]
NFMT 2013 - COBie Challenge 2013 Challenge
for Facility Managers
10