DEOT Trunking Instructions

Download Report

Transcript DEOT Trunking Instructions

DEOT (DIRECT END OFFICE TRUNKING) TEMPLATE
CUSTOMER NAME and ACNA
CenturyLink
EO
CLLI
If Existing POI/ACTL CLLI –
Identify the POI/ACTL CLLI
If Need New POI/ACTL CLLI –
Identify City Name for the
POI/ACTL CLLI
CenturyLink
EO
CLLI
LERG CLLI
CenturyLink
EO
CLLI
Overflow
Tandem
CLLI
REV 7/21/09
CenturyLink
EO
CLLI
DISCLAIMER: all routing should follow LERG routing guidelines. SPOP diagrams
are valid for 6 months from date of approval; implementation must occur within
that time frame.
DEOT Trunking Instructions
WARNING – SLRN may be in affect on your local trunk groups Conversion to SPOP may result in traffic pattern changes
•
•
•
•
•
•
•
•
List the customer name and ACNA on the DEOT diagram
Fill in the rectangle with the LERG CLLI
Fill in a CenturyLink end office CLLI in a circle for each DEOT trunk group
Connect the POI/ACTL rectangle and circle with a line and describe the
trunk group in a text box. Ex. 2w PH 24 trks (26code if available or “NEW”)
If a DEOT is Primary High, traffic overflow must be indicated on the diagram
(typically overflow goes to the local or access tandem the DEOT subtends).
Indicate the overflow trunk group on the diagram by connecting the
POI/ACTL rectangle and hexagon with a line and describe the trunk group
as above
Associate DEOT’s by the tandem they overflow to
i.e. all DEOT’s in area served by local tandem on one page, all DEOT’s
overflowing to access tandem on separate page
For each access or local tandem to which traffic will overflow, copy page
one and indicate the CenturyLink tandem CLLI in the hexagon and the
DEOT CLLI(s) in the circles. Use the LATA maps to assist you in
determining which offices subtend which tandem.
REV 2/05/09
DISCLAIMER: all routing should follow LERG routing guidelines. SPOP diagrams
are valid for 6 months from date of approval; implementation must occur within
that time frame.
DEOT (DIRECT END OFFICE TRUNKING) TEMPLATE
CUSTOMER NAME and ACNA ABC Telecom ABC
2W PH 24 TRKS
AE987654
BRTHCOMADS0
DNVRCOMAHGA
FTCLCOHMDS0
2W PH 24 TRKS NEW
GRVGCO27DS0
CenturyLink
EO
CLLI
2W AF 72 TRKS
AE576849
FTCLCOMA00T
CenturyLink
EO
CLLI
REV 2/05/07
DISCLAIMER: all routing should follow LERG routing guidelines. SPOP diagrams
are valid for 6 months from date of approval; implementation must occur within
that time frame.