MIE status, photon division LCLS status J. Arthur

Download Report

Transcript MIE status, photon division LCLS status J. Arthur

LCLS Photon Systems Status
John Arthur
SLAC
October 18, 2005
Photon Status
John Arthur
[email protected]
LCLS Photon Systems
Includes LCLS x-ray and laser groups
X-ray Transport, Optics and Diagnostics (XTOD)
managed by LLNL (Richard Bionta)
X-ray Endstation Systems (XES)
managed by SLAC (Stefan Moeller)
LCLS Laser Systems
managed by SLAC (Bill White)
October 18, 2005
Photon Status
John Arthur
[email protected]
XTOD Scope
Transport the x-ray beam, in vacuum, to all the
experimental stations
Condition the x-ray beam, with attenuators and apertures
Analyze the x-ray beam, with sophisticated diagnostics
October 18, 2005
Photon Status
John Arthur
[email protected]
XES Scope
The X-Ray Endstation Systems group provides the
infrastructure required for experimenters to make best
scientific use of the LCLS radiation safely
October 18, 2005
Photon Status
John Arthur
[email protected]
Laser Group Scope
The Laser group coordinates laser design and acquisition
throughout the LCLS. Lasers will be used in the electron
gun and x-ray experimental areas, and also possibly for
accelerator diagnostics and alignment.
October 18, 2005
Photon Status
John Arthur
[email protected]
LCLS Designs are maturing
FEE instrumentation at concept review stage
Conventional facilities at Title 2 stage
October 18, 2005
Photon Status
John Arthur
[email protected]
FEE
7 ft Fe
4 ft Fe
3 ft concrete
Mirrors
STOP
GAS ATTEN
SOLID ATTEN
COLLIM
32 m
October 18, 2005
Photon Status
John Arthur
[email protected]
STOP
NEH
Hutch 1
9.5x10m
Hutch 2
Hutch 3
Flipper Mirrors
October 18, 2005
Photon Status
John Arthur
[email protected]
Entrance
19ft tunnel
(450 ft long)
FEH
Fire door
Fire door
46ft tunnel
6ft
28x33ft
hutch
15x25ft
control cabin
10ft
29x33ft
hutch
10ft
36x33ft
hutch
10ft
Toilets
19ft tunnel
212ft
October 18, 2005
Photon Status
John Arthur
[email protected]
Building up the X-Ray Systems
XTOD group has about 20 people now
XES has 1 person and 2 openings
LUSI has 5 openings now, more soon
2 other x-ray related hires at LCLS, 1 opening
October 18, 2005
Photon Status
John Arthur
[email protected]
LCLS CE costs are expected to be high
May will need to cut some scope
Need to prioritize possible cuts
October 18, 2005
Photon Status
John Arthur
[email protected]
Possible Scope Reductions
Eliminate flipper mirrors (~$1M)
Reduce length of x-ray transport tunnel by 10%
(20m, ~$0.5M)
October 18, 2005
Photon Status
John Arthur
[email protected]
Reduced scope FEH design
Entrance
14ft tunnel
hutch extended
single beamline
46ft tunnel
28x33ft
hutch
29x33ft
hutch
36x33ft
hutch
30ft transition
20ft tunnel
212ft
October 18, 2005
Photon Status
John Arthur
[email protected]
Effects of reductions
No flipper mirrors: beamline shared in FEH
Shorter tunnel: side beams closer to each other by 10%
(1.8m vs 2m)
October 18, 2005
Photon Status
John Arthur
[email protected]
Summary
Major staff increase ongoing
Experimental needs coming into focus
Need to consider possible scope cuts to save $
October 18, 2005
Photon Status
John Arthur
[email protected]