GLAST LAT Project CU Beam Test VRVS - 5/2/006 Status of activities at INFN • Hardware procurement – CU modules delivery from SLAC to INFN (almost) complete • CAL FM109, FM101, TKRFM8, 2 ACD tiles+cables+FREE board – 3 more ACD tiles to come soon • – MGSE/EGSE from SLAC complete – 1x4 GRID at INFN • measurements ok after rework on legs – CAL integration MGSE in INFN clean-room • Proof-test tomorrow – Mass simulators for 1x4 rotation stand proof test being fabricated DAQ – Ancillary Detectors (AD) binary data format agreed and released for merging code – INFN-Bari provided a full clone (!) of the AD DAQ to INFN-Pisa • readout of available Si SSD from Trieste in progress • test synchronization with available 1x1 tower • INFN-Bari will keep development • working on event time-stamp generation adding a scaler in the AD DAQ latched by the CU clock L. Latronico GLAST LAT Project CU Beam Test VRVS - 5/2/006 Short term schedule • • • • Wed 5/3 – CU Integration procedure review Tue-Thu 5/2-4 – Test AD and CU synchronization Fri 5/5 – 1x1 disassembly – EGSE test stand validation Mon-Fri 5/8-12 – Incoming test of FM101, FM109, TKRFM8 • Full calibrations in collaboration with Bordeaux (Dave, Fred) – Will be repeated after completed integration – ACD preliminary test • Input from Alex to handle tiles and do proper connections • Input from SLAC for test scripts – 1x4 rotation stand assembly and proof- test • Loading 125% weight with new mass simulators – CU integration start L. Latronico