Transcript pdf
Trigger ACD/LAT Test Plan Eric Grove, Martin Kocian, Su Dong Sep/26/05 Trigger test plan Test Reorganization • ACD test STRs reorganized and are now all part of standard trigger tests. • Tests are classified into two categories: – Early ACD trigger tests with ACD+GASU alone (some with muon telescope) using LATTE 4, which can be performed in the tent. These are necessary to establish basic ACD trigger configuration as a base to facilitate development of LAT level tests later. – Full LAT trigger tests, include some ACD related tests. Tests will be modular for LICOS/FSW and LATTE 4 compatibility (in most cases). They are also designed to be usable as far as it could for the remaining journey of the LAT after shipped out of SLAC. Sep/26/05 Trigger test plan Documentation Status • Full LAT test prelim plan http://www.slac.stanford.edu/exp/glast/trigger/admin/lat-trigger-test.txt revised and first draft update incorporated into the perf & ops test plan doc by Eric. • The early ACD test descriptions are also created based on the original STRs: http://www.slac.stanford.edu/exp/glast/trigger/admin/acdtest-lat.txt to be incoporated into the perf & ops plan doc. • Summary of the test scripts will be documented in MD-07337 by Martin and prelim version is at: http://www.slac.stanford.edu/exp/glast/trigger/admin/trigger-test-scripts.pdf Sep/26/05 Trigger test plan Early Trigger ACD Tests • These are essential pre-requisite for establishing basic ACD settings for other trigger tests. • Can be performed with ACD+GASU (some with muon telescope) in the tent before LAT integration. • Scripts based on LATTE 4 • Need modern version of GASU with all ACD connectors and firmware include GEM arrival time. • Delay these tests until after full LAT integration could miss opportunities for finding potential problems early and significantly delay overall schedule. Sep/26/05 Trigger test plan Early trigger ACD tests • ACD channel uniformity map – Charge injection tests: GEM veto list map, arrival time uniformity and ROI&CNO triggers. • ACD TREQ timing resolution – TREQ tests with muon telescope as reference for a few tiles. • ACD hit latching control parameter tuning – ACD hit delay & stretch effects and buffer boundary. • ACD standalone TACK scan. • ACD trigger rate for each tile. Sep/26/05 Trigger test plan Early ACD test preparation • Test scripts validated in the testbed lab.with MiniLAT by Martin. • Some worrisome effects observed on the MiniLAT which should be verified with full ACD asap. Sep/26/05 Trigger test plan LAT Level Tests • TREQ tests simultaneously for all towers/tiles and using ACD ROI trigger as timing reference. • TACK scan for TKR/CAL/ACD simultaneously using TKR triggers (need to see if sufficient for ACD). • Trigger efficiency tests (TRK/CAL/ACD triggers). • ACD veto test (CAL trigger, check TKR+ROI veto) • ACD trigger rate tests (ACD ROI trigger) • GEM self integrity tests (mainly data monitoring to check consistency) Sep/26/05 Trigger test plan