Transcript ppt
IA Meeting – Dec 9,2005 GLAST LAT Project Overview • Goal – Study GEM variables in SVAC ntuple – So far in Italy we have not used the GASU » Came to SLAC to learn about the GEM variables and how the trigger works – Prepare for final LAT data analysis – Instrument Analysis Workshop 6 (see Eduardo’s talk) • Data Runs used for this talk – 8 tower data (validated run by SVAC) – Run 135004431 » my reference for this talk – 16 tower data (test run) – Run 135004859 » there could be problems here since it is a test run A. Caliandro 1 IA Meeting – Dec 9,2005 GLAST LAT Project Number of Triggered Towers Run 135004431 (8 tower data: 499893 events, 1803 s) ~78000/1803 = 43 Hz ~800/1803 = 0.44 Hz (Trigger threshold ~ 100 MeV) A. Caliandro 2 IA Meeting – Dec 9,2005 GLAST LAT Project Number of towers triggered Run 135004431 (8 tower data) Most of the events occur in 1 or 2 towers 1 Track Events Only TKR triggers TKR opens trigger window A. Caliandro CAL opens trigger window 3 IA Meeting – Dec 9,2005 GLAST LAT Project Trigger Rate (16 tower data) Run 135004859 (16 tower data, 942229 events in 1804s) ~ 80000/1800 = 44 Hz ! (as expected) Log Scale Linear Scale A. Caliandro 4 IA Meeting – Dec 9,2005 GLAST LAT Project Number of Triggered Towers (16 tower data) Run 135004859 1 Track Events Only TKR triggers TKR opens trigger window CAL is not allowed to open the trigger window for this test run A. Caliandro 5 IA Meeting – Dec 9,2005 GLAST LAT Project Summary • Preliminary Look at Trigger rates for 16 towers – agree with expectations • Recommendation – add this plot to the SVAC reports • Future – Plan to study GEM variables when LAT data is available – will continue developing scripts using existing data A. Caliandro 6