Transcript ppt
LSST Camera Internal Review October 14, 2008 SLAC Kirk Gilmore Roger Smith Cal Tech Reviewer Emergency Information Fire • • • Evacuate. Be aware of building exits Follow building residents to the assembly area. Do not leave till you are accounted for, and have been instructed to. Earthquake • • • Remain in building: Duck, cover, and hold position When shaking stops: Evacuate building via a safe route to the assembly area Do not leave till you are accounted for, and have been instructed to. Coordinating the NSF and DOE Support • DOE follows: Program and Project Management for the Acquisition of Capital Assets,” DOE Order 413.3 • NSF follows new policy modeled in-part after DOE model: “Guideline for Planning and Managing the Major Research Equipment and Facilities NSF Construction Account,” November 22, 2005 DOE LSST Camera Review Roger Smith – Cal Tech, Reviewer Start 8:00am – Kavli 2nd Floor Conference Room call-in: 1-866-330-1200 414-2998# 1. Intro and charge – 10 min – KG 2. Overview of the camera – 20 min – KG 3A. Filter status report – 15 min – KG 3B. Detector Status Report – 10 min – KG 4. Electronics – 60 min - Oliver (Harvard) 5. Break – 10 min - Finished here by 10:15am 6. Camera Controls/Data Acquisition – 15 min – Schalk(UCSC) 7. Cryostat – 60 min - Schindler 8. Corner Raft – 60 min – Olivier (LLNL) 9. Lunch – 45 min (12:30pm to 1:15pm) 10. Utilities – 30 min - Nordby 11. Integration and Test – 60 Min – Nordby (SLAC) 12. Break – 10 min 13. Calibration – 60 min – Burke (SLAC) 14. Delivered image quality budget – 10m - KG 15. Metrology – 30 min – Rasmussen (SLAC) 16. Close-out/Q&A – 60 min – Don Sweeney and Roger Smith to lead Finished at 5:30pm