Agenda
Template Structure
Example: Technology Foresight
“Innovative metallic materials” in the
region of Duisburg
STRATIN.C.
Template Structure
1.
2.
3.
4.
Classification of the competence field / network
Specification of the cluster
Maturity check of the network
Project goals
5.
6.
7.
8.
Target Group
Project Duration
Methodology
Results
9. Network recommendations
10. Policy implications
STRATIN.C.
Example: Technology Foresight
“Innovative metallic materials” in the region of Duisburg
Project goals:
Strengthening the regional competitiveness
Support efficient networking
Methodology to utilize existing innovation forces and
innovation potentials
Transfer of methodology to local actors
Target group:
Managing personnel of clusters
SME
Economic promotion agency with man power to continue
network after foresight process
STRATIN.C.
Workshop based technology foresight process
Methodology:
First workshop: moderated session with key actors, in order
to work out the most important (technological) trends
Second workshop: moderated session with key actors, in
order to work out existing strength and weaknesses of the
location in relation to relevant future technological trends in
the competence field
Participants:
local representatives, two or three SMEs, one representative
of a multinational company and one representative of the
science sector
Duty of working groups: work out practical and concrete
measures, to prepare the region on the identified future
trends
STRATIN.C.
Workshop based technology foresight process
Results:
Identification and description of key competencies
and deficits
Identification of major trends
Formulation of concrete measures
Network recommendations:
Successful implementation of identified measures
Working a common vision (motivation of actors)
…
Policy implications:
Successful FS needs professional preparation:
A critical level of networking should be already there
Moderator
Critical mass of participants
STRATIN.C.