Beam Test Plans at the KEK Fuji Beam line S. Uozumi

Download Report

Transcript Beam Test Plans at the KEK Fuji Beam line S. Uozumi

Beam Test Plans
at the KEK Fuji Beam line
(as of Nov-7 2007)
S. Uozumi
In this slide I will give my idea for somewhat
detailed beam test plan.
Let’s discuss and finalize it !
Good and not-so-bad news
• We can borrow the ATLAS SCT
(Thanks to Hara-sensei) !
One undergrad student working on SCT in Tsukuba will finish his grad thesis with
SCT data which will be taken in our BT.
• The SCT can be operated only through Windows PC.
Therefore we have to take all the data with Windows PC this
time (the PC can be borrowed from Tsukuba).
• We can also borrow X-Z movable stage from ATLAS
(thanks to Kohriki-san and Ikegami-san), but it may be
difficult to link the stage movement with our DAQ system.
Need to perform hand-input scan ?
People
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
D. H. Kim (KNU) ? ~ ?
J. S. Suh (KNU) ? ~ ?
D. Kong (KNU) ? ~ ?
K. Kawagoe (Kobe) Nov 17~19, 23~25
D. Jeans (kobe) Nov12~end
T. Kaneko (Kobe) Nov15~end
H. Ikeda (Kobe) Nov15~end
K. Ueyama (Kobe) Nov15~end
T. Takeshita (shinshu) Nov17~20 + alpha
S. Uozumi (shinshu) start~end
M. Nishiyama (Shinshu) Nov 14~end
Y. Sudo (Tsukuba) start~end
T. Ikuno (Tsukuba) start~end
H. Yamazaki (Tsukuba) Nov 16 ? ~ end
Y. Takahashi (Tsukuba) start~end (can not enter to restricted area)
• “start” means start of preparation, Nov-12 on Monday.
• “end” means the date where everything is done (includes possible delays).
• Let me know if there are modifications needed on the participating period.
Overall schedule
~Nov-12th: Gather equipments at KEK
Nov 12th~24th : Start preparation of DAQ, SCT and SciFi system
at Fuji B4 by people who can participate.
Nov 16th : Almost participants are at KEK, take radiation training
and have a kick-off meeting.
Nov 17th,18th (weekend) : Prepare everything as much as possible
Nov 19th~20th : Beamtime starts, setup on beamline
Nov 20th ~ 24th : As soon as the setup finished, start comissioning run
followed by strip scan and run as long as possible
Nov 25th : end of the beamtime (could be extended) , withdraw from
beamline
Beam line setup
Atlas SCT SciFi
(6x12cm) tracker
e-
Strip
scintillators
Scinti
Counter
(3x3cm)
temp.
sensor
Trigger counters
(4x11cm?)
Movable
stage
Veto counter
• Each SCT has 2 layers with a small stereo angle.
Scintillator-strip assembly
• As done at the DESY BT, strips will be mounted in acrylic
frame, and the scintillator layers will be installed in the
detector frame and light shielded.
• To all the MPPC, uniform bias voltage will be applied
by source meter.
• Signal from MPPCs will be read by CAMAC ADC after
signal amplification by ATLAS ASD.
spacer
Frame
Operation / Readout electronics
• Scintillator strips … MPPCs are biased by source meter,
signal will be amplified by ATLAS ASD
and read with CAMAC ADC.
• Trigger / veto counters … read with CAMAC ADC.
• SciFi tracker … (amp+) discri + CAMAC coincidence register.
• SCT … need dedicated VME modules and software.
• Movable stage … need dedicated system.
• Temperature sensor … can be read by Windows PC ?
Strips to be tested
- Let’s start with newer stuff, since beam time and rate are limited -
1. Extruded 3 mm thick direct readout without TiO2
2. Extruded 3 mm thick fiber EMBEDDED readout with TiO2
3. Extruded 3 mm thick fiber EMBEDDED readout without TiO2
4. Extruded 3 mm thick fiber readout with TiO2
5. Extruded 3 mm thick direct readout with TiO2
6. Extruded 3 mm thick fiber readout without TiO2
7. Kuraray strip 3 mm thick fiber readout
Newly produced
8. Kuraray strip 3 mm thick direct readout
Old ones
9. Kuraray strip 2 mm thick direct readout
Kuraray as Reference
• Will start with (1~3)+7 with ~3 different strips, and if time permits
test 9, 8 and 4, and if time permits we will test 9, 8 and 4~5.
• Use the same MPPCs if possible, for direct comparison.
• Detailed plan will be finalized at kick-off and on-shift meeting.
Run Plan and DAQ Time Estimation
Need to take data with MIP position scan and
Random trigger (pedestal and MPPC gain by dark noise)
With each type of scintillator.
• Assume ~1000 events / mm2 (is it enough?)
• 10 x 45 x 1000 = 450000 events per a strip
• 450k events / 10 (30) Hz = 750 (250) min per a strip
• Random trigger run ~ 5 min, taken once per an hour
• 12~13 (4~5) hours to scan one strip.
• Perform multiple (2~3) layers scan.
• Configuration change ~ 2 hours (?)
Red numbers … estimation with the SCT
Data Monitoring & Analysis
• We will perform “on-the-fly” analysis during data taking.
• Need always to watch gain (by pedestal run),
light yield, and position dependence for all the strips on
beamline.
• Better to plot the temperature, too.
• The analysis will run on Linux PC.
Startup jobs
• DAQ system and Electronics (1 staff+1 student)
– Operation of CAMAC, SCT, temperature monitoring system
and movable stage.
– Manage trigger logic and electronics.
• Beamline devices (1+3)
– Maintain trigger, veto, SciFi, SCT hardware
– Installation (need to make support frames), cabling, alignment, HV,
setting threshold and timing.
• Detector + movable stage (1+1~2)
–
–
–
–
Assemble scintillator-strip module, alignment, connection, cabling.
Check signal by beta-ray source
Detector and movable stage installation on beamline
Install temprature monitoring sensors at the same time.
• Analysis codes (0~1 + 0~1)
– Discuss data format with DAQ team
– Prepare root macro for “on-the-fly” analysis
Shift plan
• 3 shifts per a day (0~8, 8~16, 16~24),
2~3 persons (at least 1 staff + students)
in one shift.
• Official language is English during the beam test !
To share all the information, DO NOT use Japanese
as possible as you can !
• Contact me anytime (Satoru : 080-3500-8846)
if you have any trouble during your shift.
Stuffs to borrow from KEK
• Movable stage and PC for control (from KEK ATLAS group)
• CAMAC and NIM crates, modules
– Conicidence registers
– Discriminators
– Gate generators
– Delay modules
– NIM amps
– Linear fan-out
– Visual scaler
– Clock generator
• Electric parts
• Beta-ray source
• And more …
Stuffs to borrow from Kobe
•
•
•
•
•
Keithley source meter
Temperature monitoring system
ATLAS ASD system x 1
SciFi tracker (and signal cables if possible)
CAMAC ADC (HOSHIN C009) x 1
Stuffs to borrow from Shinshu
•
•
•
•
•
•
ATLAS ASD system x 1
Detector frames, flat cable, layer structure
Kuraray strip scintillators (2mm, 3mm thick)
Reflector film, white PET film
Flat cable-ASD interface (hand-made)
Many small stuffs
(connectors, cables, tools, multimeters, black sheets, ground cables,
tapes, clamps, テプラ …)
•
•
•
•
CAMAC ADC HOSHIN C009 x 2
NIM-TTL converter
Trigger / Veto counters
Analysis PC (ilccal01)
Stuffs to borrow from Tsukuba
•
•
•
•
•
•
•
•
•
•
ATLAS SCT system
DAQ PC (Windows) … does it have enough disk space?
CAMAC Crate Controller
CAMAC ADC HOSHIN C009 x 2
Trigger support frames
Oscilloscope
Soldering tools (available at KEK?)
Many small stuffs
Hamamatsu PMT amp (C5594) and power supply
And more …
Shipping of the equipments
(from Shinshu and Kobe to KEK)
• Please ship equipments to Miyamoto-san at
KEK with sign of “GLDCAL beamtest
equipments”.
• Make sure that stuffs will arrive on time
(by Nov-12~13).
〒305-0801 茨城県つくば市大穂1-1
高エネルギー加速器研究機構 素粒子原子核研究所
宮本 彰也 教授
Radiation training / accommodation
• Make registration as KEK rad-worker ASAP via the KEK
web site! ( http://www.kek.jp/uskek/ )
• In addition to the rad training at KEK, beamline lecture
will be needed.
I will ask KEK person to give a lecture on Oct-16 (Fri).
• For accommodation, you have to make the KEK dorm
reservation by yourselves!
• Unfortunately dormitory is already full for some dates
(Nov-13,14,19,20..), but you can join to waiting list.
• After the reservation, let me know which date you
couldn’t take the room, then I will try to find another
accomodation for those days.
• Let me know if you have any questions.
Is there anything missing?
Backup info.
The KEK new test beam line
Mt. Tsukuba
North
See http://www.kek.jp/intra-e/access
for travel info to KEK.
(buses are available from Narita
Airport to Tsukuba station,
and station to KEK.)
Fuji experiment
hall
Bus-stop to arrive
from Tsukuba station
Gate
Bus-stop to depart
to station
KEK new test beam line
(http://fujibeam.kek.jp but in Japanese.)
KEKB tunnel
• Electron beam line in Fuji experiment
hall, 3rd floor in basement.
• Make use of bremss photons
from KEKB ring
• p = 0.5 – 3.4 GeV/c, sp/p = 0.4 %
• Rate ~ 100 Hz @ 3 GeV
• Beam spot size = +- 1cm
Experimental
Stage (7 x 4 m)
Fuji exp-hall
3rd floor
in basement
catwalk
EV
Beam
area
Stair
Counting
room
Equipments
•
•
•
•
•
•
•
•
•
•
•
•
CAMAC crate & module (ADC, coinc. reg.)
NIM crate & module
VME crate & module
DAQ PC with CAMAC & VME interfaces
Bias voltage source
Movable stage and controller
SciFi tracker, cables
Trigger counter
ATLAS SCT
ATLAS ASD and Cables
Temperature monitoring system
Drivers, testers, cutters, black-sheets, tapes, etc…
Beam test setup (if the SCT doesn’t work)
Trigger
Counters
SciFi
tracker
Strip
scintillators
Trigger
Counter
e-
Veto counter
Movable
stage
Veto counter
• Analog signal from trigger and veto counters will be useful to reject
shower events.
• X-Y tracking by SciFi detector (by 1mm f scintillating fibers).
• Since there is only 1 X-Y tracker available, the tracker should be as close as
possible to the strip scintillators.
• Strips will be mounted in the frame used at the DESY BT.
• Target strips will be placed on 1st layer, latter layers may be used for
offline MIP selection.
Memo (just not to forget)
•
•
•
•
Beamline alignment
Log book ?
Noise rejection
Need to find a place and tools in KEK for soldering,
machining, drilling and so on.
• Daily-meeting schedule ? And where ?
• Light shielding frame
• Connecting DAQ & analysis PC to KEK network