Joint Program Executive Office for Chemical and Biological Defense JOINT PROJECT MANAGER COLLECTIVE PROTECTION (JPM-CP) April 26, 2005 Advanced Planning Brief to Industry STAN ENATSKY JPM-CP Joint.
Download
Report
Transcript Joint Program Executive Office for Chemical and Biological Defense JOINT PROJECT MANAGER COLLECTIVE PROTECTION (JPM-CP) April 26, 2005 Advanced Planning Brief to Industry STAN ENATSKY JPM-CP Joint.
Joint Program Executive Office for Chemical and Biological Defense
JOINT PROJECT MANAGER
COLLECTIVE PROTECTION (JPM-CP)
April 26, 2005
Advanced Planning Brief to Industry
STAN ENATSKY
JPM-CP
Joint Program Executive Office
for Chemical and Biological Defense
[email protected]
050426_APBI_JPM_CP
1
Joint Program Executive Office for Chemical and Biological Defense
Outline
• Program Overview
• Warfigther Needs
• Technical Challenges
• Acquisition Strategy/Funding/Schedule
• Business Opportunities
• Contacts
050426_APBI_JPM_CP
2
Joint Program Executive Office for Chemical and Biological Defense
Program Overview
Mission:
Research, develop, procure, field and dispose
of Collective Protection equipment and systems
that protect personnel and equipment from
chemical, biological, radiological and toxic
industrial contamination within controlled
boundaries.
050426_APBI_JPM_CP
3
Joint Program Executive Office for Chemical and Biological Defense
Program Overview (cont’d)
• Collective Protection (CP) Provides:
– Protection to Mission Essential Resources Afforded to
Controlled Areas or Zones Allowing a Force Structure to
Operate Safely, at Near-normal Levels While in a Chemical,
Biological, Radiological, or Toxic Environment.
– Essential Resources Include:
• Personnel and Equipment
• Mobile Assets (Vehicles, Ships, Aircraft)
• Transportable Assets (Hard & Soft Shelters)
• Fixed Assets (Buildings)
050426_APBI_JPM_CP
4
Joint Program Executive Office for Chemical and Biological Defense
Warfighter Needs
• Environmental Control of Areas or Zones to:
– Prevent Infiltration of CBR and Toxic Industrial Hazards
– Supply Clean, Breathable Air
– Allow Ingress and Egress Without Compromising the
Protected Boundary
• Areas Typically Collectively Protected:
– Mission Critical
– Command and Control
– Medical Care
– Rest and Relief
– Weapon System Control
050426_APBI_JPM_CP
5
Joint Program Executive Office for Chemical and Biological Defense
Technical Challenges
• Evolving Threat
• Integrating with Expeditionary Missions
• Designing for Modularity and Component Flexibility
• Reducing Equipment Size, Weight and Power
• Reducing Sustainment Costs
050426_APBI_JPM_CP
6
Joint Program Executive Office for Chemical and Biological Defense
Acquisition Strategy
• Conduct CP Technology Readiness Evaluations (TRE)
– Identify new Mature Technologies to Meet Warfighter Needs
– Standardized Tests, Evaluations, and Technology Readiness
Level Assessments
• Transition Technologies to Existing and New CP
System
• CP TRE FY2005
– Assessments Begin 3QFY05
– Testing 4QFY05 Thru 1QFY06
– Technology Areas of Interest
•
•
•
•
Air Purification
CB Barrier Materials
Support Equipment for CP
Whole CP Systems
050426_APBI_JPM_CP
7
Joint Program Executive Office for Chemical and Biological Defense
Acquisition Strategy (cont’d)
• Joint Expeditionary Collective Protection (JECP) is
Spiral Development Program
• JECP Increment 1 is Fully Funded
– May Enter Acquisition Process at Milestone B and/or C
Depending on Technology Maturity
– Tailored Analysis of Alternatives (AoA) – 2QFY06
– Technology Demonstrations – 2QFY06 Through 4QFY06
– Emphasis on Supportability, Size, Weight and Power
Consumption
– Modularity and Scalability of Individual Technologies
• Procure Chemical Biological Protective Shelter
(CBPS) System as Funded Within FYDP
050426_APBI_JPM_CP
8
Joint Program Executive Office for Chemical and Biological Defense
JECP Schedule / Funding
Increment One
FY06
FY07
FY08
FY09
FY10
FY11
RDT&E
IOT&E
Production
$M
RDT&E
FY05
FY06
0
7.6
FY07
10.2
PROCUREMENT
050426_APBI_JPM_CP
FY08
20.2
FY09
FY10
FY11
26.5
19.0
17.7
5.0
6.2
8.1
9
Joint Program Executive Office for Chemical and Biological Defense
Business Opportunity - JECP
• Increment 1 - System Development & Demonstration
• Cost Plus Incentive Fee (CPIF) Contract for Prototype
Development and Test 2QFY07 with LRIP Option
– RFP 3QFY06
– Prototype Development and Testing
– Integrate Technologies Identified by CP 2005 TRE
– Expeditionary CP for Rest/Relief and Command/Control
– Reduced Footprint and Improved Strike and Erect over
Legacy Systems
– Quantities TBD Pending Development/Approval of Capability
Development Doc
050426_APBI_JPM_CP
10
Joint Program Executive Office for Chemical and Biological Defense
Business Opportunity - CBPS
• Chem/Bio Protective Shelter - Electric
• Procurement Against Performance Based
Specification for 175 to 1000 Systems
– Final Request For Proposal 3QFY05
– Award Firm, Fixed Priced Indefinite Delivery Indefinite
Quantity 5-Year Contract 1QFY06
$M
PROCUREMENT
FY05
14.3
FY06
16.5
FY07
30.1
050426_APBI_JPM_CP
FY08
30.6
FY09
31.5
FY10
32.6
FY11
33.3
11
Joint Program Executive Office for Chemical and Biological Defense
Points of Contact
• Joint Project Manager-Collective Protection
– Stan Enatsky
– (202) 781-3741
– [email protected]
– [email protected]
• Deputy Joint Project Manager-Collective Protection
– Mike Abaie
– (540) 653-2719
– [email protected]
050426_APBI_JPM_CP
12