Target Installation Plan Paul Hodgson The University of Sheffield Requirement • Assemble and test two complete target systems in time for installation during August 2008
Download ReportTranscript Target Installation Plan Paul Hodgson The University of Sheffield Requirement • Assemble and test two complete target systems in time for installation during August 2008
Target Installation Plan Paul Hodgson The University of Sheffield Requirement • Assemble and test two complete target systems in time for installation during August 2008 shutdown • How do we do this? • What do we need to do this? • Who needs to be involved? How do we assemble the targets? • • • • Assemble and test a system for ~300k pulses Simultaneously assemble 2nd system Remove 1st system and test 2nd for 300k pulses Perform detailed visual inspection of bearing surfaces of 1st system • Swap 1st back into test rig and install 2nd system in ISIS • ISIS target will have approx. 3-500k pulses “on the clock” What do we need? • Two distinct phases: • Stator Main Body assembly in clean room o o o o Stator body with the new end plates welded. Optics block (calibrated) with laser safety covers. Coated bearings, upper and lower. Shaft, vane and magnets RAL Sheffield RAL RAL • Final assembly in R78: o o o o o Power, Water, Fibre Optics Chiller - Second chiller? Bellows DAQ PC Control PC Sheffield RAL RAL Sheffield Daresbury What do we need? • Power Electronics in R78 and VacRack area need upgrading by Daresbury • Control software for power electronics needs upgrading in R78 and MLCR • All connections to target assembly to be clearly labelled and documented • Relevant health and safety documentation to be supplied by Sheffield • Appropriate people involved need to be aware of the schedule and timescale Timescales • ISIS shutdown 13th August • Start initial assembly 12th August – 2 days • Also simultaneously set up electronics in R78 • Final assembly in R78 – 1 day • Expect to have first full system ready for test run 14th -15th August • Implies an ISIS installation date late August People • Sheffield o C. Booth, P. Hodgson, R. Nicholson, P. Smith • Daresbury o S. Griffiths et al. • RAL o G. Matthews, J. Loughrey, J Tarrant, E. McCarron • MICE o M. Ellis, W. Spensley